Data Sheets- Percentages Flashcards
Testing- Min. Pneumatic test pressure, % of design pressure
110%
AI - Amount of time inspector must be involved in inspection activities- required to maintain API 570 certification
20%
MTLS- Amount of nickel required for a material to be a nickel alloy
> 30%
NDE- Overlap with a UT scan, % of transducer diameter
10%
NDE- RT Film density of weld as compared to IQIs (Range)
- 15% to + 30%
Pip Class- % of H2S in process to classify as Class 1 Pipe
> = 3%
NDE-% of circ weld to RT/UT when fabbing Norm Service pipe
5%
Design- Mill tolerance of seamless pipe
-12.5%
PRV- Max set pressure for thermal relief valves, % of design pressure
120%
Testing - Min test pressure for underground pipe, % of maximum operating pressure. Test in lieu of digging.
110%
NDE- % of welds to VT when fabricating Normal Service Pipe
5%
NDE- % of Visual & RT/UT required when fabbing severe Cyclic pipe
100%
MTLS- Max amount of chrome to be considered low-alloy steel
9%