Data Sheet III Flashcards
Define - Alteration
Physical Change (570: 3.1.2)
Define - Repair
Restore - Suitable (570: 3.1.78)
Define - Imperfections that exceeds the acceptance criteria
Defect (570: 3.1.17)
Define - Discontinuity that may or may not exceed the acceptance criteria
Imperfection (570: 3.1.30)
Define - RBI’s two Primary Factors
Probability, Consequence (570: 5.2)
NDE - Number of CML’s to obtain thickness readings during an inspection
Represent - active (570:6.5)
NDE - CML that must be measured during a thickness Inspection
CML with earliest renewal date (570:6.5)
PRD’s - How relief device intervals are determined
Performance (570:6.7.3.1)
Insp - Basis of API 570’s Piping Classification
Consequence of failure (570:6.3.1)
Corrosion - Cause for fatigue crack
Cyclic Stress (574: 7.4.10.1)
Corrosion - Factors that affect the creep rate
Time, Temperature, and Stress (574:7.4.11.1)
Corrosion - Method by which process leaks can lead to brittle failure
Auto-refigeration (570:6.3.4.2.a)
Corrosion - Type of soil that is most corrosive
Low Resistivity (570:9.2.4)
Repairs - Number of new flange assemblies to be inspected during repairs and alterations
Represent - active (570:5.12)