Damage Control Programs Flashcards

1
Q

Who is responsible for nominating a Damage Control Petty Officer (DCPO) within the division?

A

The Division Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who is the final approval for nomination, replacement, and rotation of all DCPOs?

A

The Executive Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How long does a DCPO normally serve?

A

6 moths

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the training requirements to be a DCPO?

A
DC Watchstander PQS 303 (Final Qualifier)
Basic DC 301-306 (Pre-requisite)
301 Maintenance Man (Pre-requisite)
301 Craftsman (Pre-requisite)
**RECOMMENDED COURSE**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What type of equipment is the DCPO responsible for within divisional spaces?

A

Watertight doors, valves, CO2/PKI/AFFF bottles, battle lanterns, deck drains

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

To whom does the DCPO report?

A

DCA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which Navy Enlisted Classification (NEC) does the welding/brazing qualification program apply?

A

NEC U53A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the minimum criteria for the initial qualification and requalification of welders?

A

Initial: Complete HT “A” school or NEC U53A with passing grade of 75%.

Requal: Quarterly demos on test assembly, then VT through NDT. Annual vision test.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Who is responsible for maintaining an auditable file for each welder?

A

The Division Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What time of information is included in each welder’s file?

A
  1. Welder ID#
  2. Test date
  3. Qualification test # / process / position
  4. Test results
  5. Record of omission of space restriction
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How often are audits of the welder/brazing qualification program required?

A

Annual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How many NDT methods are there and which are conducted by ships force onboard?

A

6; PT and VT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which NDT method uses X-ray to show imperfections within the weld?

A

Radiographic Testing (RT)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How is the thickness of a weld measured with Ultrasonic Testing (UT)?

A

Sound waves are sent into the surface, the return is displays results w/ amplitude representing the thickness.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Magnetic Particle Testing (MT) is used to indicate imperfections in what part of a weld?

A

At or below the surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How are cracks that are open to the surface indicated with Liquid Penetrant Testing (PT)?

A

A dye is applied to the surface and allowed to dry. Afterwards a developer is applied which will show imperfections, if any.

17
Q

What is measured and inspected with visual and Dimensional Testing (VT)?

A

Inspects/measures specified dimensions to check for proper joint design and surface defects.

18
Q

Which NDT method uses electromagnetic induction to detect and characterize surface and subsurface flaws in conductive materials?

A

Eddy Current Testing (ET)

19
Q

What is the most widely used method of corrosion control?

A

Protective coatings (paint)

20
Q

What is the purpose of the corrosion prevention and control program?

A

Track coating conditions, identify timely and appropriate maintenance decisions, and repairs to prevent system deficiencies IOT prevent a coating failure.

21
Q

Which reference establishes the basic guidelines for the corrosion prevention and control program?

A

JFMM Volume VI

22
Q

Which references provide specific guidance for inspection, prevention, and repair of corrosion onboard ships?

A

NSTM 100 and 631

23
Q

What data is used to document coating systems inspections, maintenance, and repairs

A

Corrosion Control Information Management System (CSIMS)