CVCS Flashcards

1
Q

How does CVCS supply borated water to RCS and RCP seals during a LOCA

A
  • Start both charging pumps
  • Open IMO-910,911 charging pumps suction from RWST
  • Open ICM-250,251 Boron Injection Tank Inlets
  • Open ICM-255, 256 Boron Injection Tank Outlets
  • Close QMO-451 and QMO-452 charging pump suction from VCT
  • Close QMO-200 and QMO- 201 charging flow to regen heat exchanger
  • close QMO-225, 226 Charging pump ELO’s
    • Reopens after 2 seconds if RCS pressure greater than 1825 PSIG
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How does CVCS ensure borated water to the RCS and RCP Seals with loss of power

A
  • IF SI present Charging pumps restart 3.16 seconds after diesel is at speed and voltage
  • If NO SI RO must restart pump manually
  • Charging pump trips will cause
    • Letdown orfice isolation valves to close
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

QRV-111 and 112 Letdown Isolation Valves

A
  • Close on PZR low level to prevent uncovering heaters
  • Interlocked to prevent opening unless orfice isolation valves are closed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Letdown orifices

A

Reduce Coolant pressure and control flow of reactor coolant leaving RCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Letdown Heat Exchanger

A

Cools letdown flow from 290 to 127 to protect resins in the CVCS Demineralizers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

QRV 301 Letdown pressure control Valve

A
  • Maintains backpressure between 300 and 350 psig to preent flashing downstream of the letdown orifices
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Filters/ Demineralizers

A

Mixed bed: Remove lithium

Cation bed: Backup lithium removal

Deborating Bed: Anion resins reduce boron concentration when deluting nolonger practical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Describe VCT

A
  • Surge Volume for RCS and CVCS
  • NPSH for charging pumps
  • Means of introducing hydrogen in RCS
    • Hydrogen scavenges oxygen
  • Means of degassing RCS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Describe the Charging Pupms

A
  • Power Supplies
    • East T-11D
    • West T-11A
  • Flows
    • Normal 150 gpm
    • runout 550 gpm
  • Pressure
    • Shutoff Head 2530 psig
  • Autostart
    • SI
    • Manual from control room
    • Manual from hot shutdown panel
  • Auto trip on
    • Loadshed
    • Overload
    • Overcurrent
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

how is seal water maintained

A

QRV 200 maintains backpressure on charging header to force water through the RCP seals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

RCP seal injection and return flowpaths

A
  1. Seal water injection filters
  2. seal injection reg valves
  3. rcp seals
  4. rcp seal water return valves
  5. seal water return filter
  6. seal water heat exhanger
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

VCT responses

A
  1. Lowering Level
    1. 14% auto makeup starts
    2. 2.5% auto aligns charging pumps suction to RWST
  2. Rising Level
    1. 24% auto makeup stops
    2. 87% auto divert letdown to CVCS HUTS
  3. Rising Temperature
    1. High temperatures will affect the affinity of the demin which will actually release boron in to the system
  4. Lowering Temperature
    1. lower temperatures affect the affinity of the demin and will pull boron from the system
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Qrv 111 and qrv 112 letdown isolation valves isolate on what signal

A

Pressurizer low level (17%) to prevent uncovering the heater elements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

five functions of the volume control tank

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

five functions of the volume control tank

A

surge volume

npsh for charging pumps

means to add hydrogen to rcs

means to degas

provides back pressure to the rcp seals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

four signals will autoclose regen hx outlet valves

A

phase A

low pressurizer level

loss of operating charging pump

qrv 111, 112 letdown isolation valves close