Contractors Guide To Quality Construction Flashcards

1
Q

The 4 things control tests are for measuring:

A

Slump
Air content
Compressive strength
Yield

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Control test results should conform to _____ international standards.

A

ASTM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Slump test is used to measure the ________________ of the concrete.

A

Consistency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

__________ gives an indication of the workability, also called flowability or plasticity, of the concrete.

A

Slump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

_____-_____________ improves the concretes resistance to damage from freezing and thawing cycles.

A

Air-entrainment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Without the proper ____ __________, normal concrete that is exposed to cycles of freezing and thawing will scale and spall, resulting in a failure of the concrete.

A

Air content

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

_______________ ______________ measures estimated strength at a given time to make sure it meets a job’s specified strength.

A

Compressive strength

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Compressive strength is measured testing concrete cylinders either 6” dia. x 12” height or 4” dia. X 8” height tested at 28 days. At 7 day strength should be at ___-____% of the 28 day strength.

A

65-70%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

_____ _____ replaces part of the portland cement content & visually reduces the air content in air-entrained concrete.

A

Fly ash

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The stronger and less porous the cement paste, the stronger and more durable the concrete. Any _________ not needed for workability simply dilutes the cement paste, weakening it.

A

Water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Concrete is typically batched by __________.

A

Weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The ____” sieve is the dividing point between course and fine aggregates.

A

3/8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The largest allowable aggregate will be the most economical, although a maximum of ____” or less is recommended for high-strength concrete.

A

3/4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

____________________ when properly used can increase early strength, ultimate strength, accelerate or retard setting time, increase workability, improve uniformity, reduce permeability and improve durability.

A

Admixtures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

__________-______________ admixtures enhance the workability of the concrete, making it possible to reduce the water by 5% or more.

A

Water-reducing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

______________________ or high-range water-reducing admixtures typically turns a 2”
slump into a 7-9” slump.

A

Superplasticizers

17
Q

_________________ especially used with fly ash mixtures can cause extreme retardation (overnight or longer).

A

Retarders

18
Q

The least costly and most efficient accelerator is ____________ _____________.

A

Calcium chloride

19
Q

As a rule of thumb, adding ___ gal. of water per cubic yard of concrete will increase the slump by approx. ____ in. and will reduce compressive strength by _____ psi.

A

1 gal
1 in.
150 psi

20
Q

True or false:

Most specifications allow water to be added more than once on the job.

A

False

21
Q

The maximum delivery time is ____ min.

A

90

22
Q

A shorter maximum delivery time usually ____ min is sometimes specified for hot weather.

A

60

23
Q

For hot weather concreting, a max concrete delivery temp of ____*F is specified.

A

95

24
Q

The consolidation of soil by vibrating, tamping, rolling or adding temporary weight.

A

Compaction

25
Q

The primary purpose of _________________ is to reduce air voids, but also remove excess moisture.

A

Compaction