Cond / FW Flashcards
CBP Press Limits
38(28)psig (10 sec) - SL#3
35(25)psig (10 sec) - Pmp Start pressures
34(15)psig (A-40/B-70/C-100) - Pmp Trips
RPF Press Limits
225(165)psig (5 sec) - SL#3
207(145)psig (5 sec) - Pmp Start pressure
207(145)psig (A-15/B-25) - Pmp Trips
CBP Trips
LESS Low oil pressure - 5psig (U2 ONLY) Electrical Fault Suction valve not FULL Open Suction pressure low - 34(15)psig (A-40/B-70/C-100)
RFP Trips
STROLL
Suction Pressure Low - 207(145) A-15/B-25
Thrust >32mil (+/-)
RWL high - 54(54.5)”
Overspeed - 5900rpm
Low condenser vacuum - 22.3(17)”HgVac & >3500rpm
Low oil pressure - 4psig or Emerg hdr <100#
Min Flow Limits for CBP & RFP
CBP
- U2 - 3000-3600 - Fail OPEN on loss Vital AC
- U1 - 8000-9000 - Fail OPEN on loss Vital AC
RFP
- U2 - 3600-4600 (AOV’s) - Both fail OPEN on loss Vital AC
- U1 - 2520-4520 (HOV’s) - A- fails OPEN on loss Vital AC / B-Open on loss of Inst A
Flow limit for placing 2nd RFP In-service
Prior to exceeding 7mlb mass
Time delay for CBP & CP on a LOCA
50 sec time delay prior to being able to restart
Steam supply for Rx Feed Pmps HLV & LLV
MSL used on pump start by MSL - C(B) through HLV. At adequate pressure LLV takes over control and is supplied by MSR crossover piping to LP turbine.
LLV opens full on start and controlled by HLV and then closes down as power is increased
RFP Seal Water
- Requires 10”HgVac, 1-CBP, & RFP off turning gear prior to placing in-service
- prevents leakage out into environment
RFP Speed setter permissive
> 2100rpm and light on vertical panel illuminates
Controls 0-5800rpm
M/A station control
2100-5800rpm
Crossflow requirements
Used when >80%
<80% crossflow factor = 1
Limits RTP to <2777MWth
Startup Level Control Valve Limits
F111 - Locks up when pressure <50# or signal to valve <10ma(Vital AC)
Bypass valve opened >15% RTP when SULCV full open
Long Cycle Clean-up Limitations
U2 - Condensate Pump - 70% open / CBP - 55% open
U1 - Limited by Demin Flow >4000gpm
Cond / FW Power Supplies
Condensate/CBP
A/B - 4160-D
C - 4160-C