Cold Ship Setup Flashcards

1
Q

What 5 actions are required prior to commencement of the POWER ON checklist?

A
  • Park Brake On
  • Batt 1 Auto
  • Bat 2 Auto
    (pause)
  • CHKL DU 2
  • Check ECL database
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What (2) actions occur (CM1) post POWER ON checklist?

A
  1. Start Chrono (8 min. CMS requirement)
  2. Aircraft Acceptance actions:
    Documentation check
    Flight Deck safety equipment check
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What (4) actions does CM2 complete post POWER ON checklist and which PAGE/TILE is accessed to complete.

A
  1. Aircraft Acceptance checks
  2. Datalink Initialization. (CNS-page/DLK-tile)
  3. Obtain ATIS
  4. Preliminary Take-off perforce data- crosscheck.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

CM1 actions after aircraft acceptance?

A

Obtain ATIS and complete preliminary aircraft performance calculations. (CM2 also completes these actions at this time independently)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

To consolidate: What (4) actions has CM1 completed to arrive at this point?

A
  1. POWER ON checklist
  2. Serviceability Check. (Documentation (FON/FOT, MEL’s, CRS), Emergency Equipment, Gear Pins)
  3. Obtain ATIS
  4. Preliminary Take-off performance data- compute and crosscheck, review Engine out escape, Landing perf. destination including Vac climb gradient.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

PF actions post ATIS/Performance calculations? (PF)

A

Preflight Cockpit flow (overhead panel CHECK HUDetc. APU, flight number, Altimeters, Ice detector test (SYN/AVIONIC), Circuit breakers (SYN/CB), MAP Symbols (1,3,4, last), MAP overlay (VSD, Terrain, Traffic), Rudder trim test, Autobrake RTO, Sidestick check, Oxygen mask.)

(PM completes walk around)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

PF actions post Preflight flow (panel scan), plus button/Tile/Tab

A

FMS Setup.

FMS/DBASE/STATUS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Action after FMS Database currency etc. TILE/check?

A

POS Tile (RAIM check)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

After POS Tile? and what is being inserted and what order?

A

FPLN Tile/INIT Tab

Origin
FLT number
Dest
CRZ level
ETD
Departures (dialog box)
RWY/SID/TRANS
Arrivals (dialog box) if include in plan.
TRANS/STAR/APPR
ALTN
ALTN CRZ ALT
AVG WIND
AVG ISA Dev.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which TILE/TAB post FPLN/INIT?
And entry details?

A

FPLN/FUEL (tab)

Confirm FOB mode is CALC
ZFW
CG (%MAC)
BLOCK FUEL
Number of PAX (inc. CC)
Check destination figures at bottom of page.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

After FUEL input which TILE/TAB and Data required?

A

PERF/DEP (tab)

Check dept. Origin/RW/SID/TRAN.
TO THRUST
OAT
(FLEX if req. after Temp.)
RWY WIND
CLB THRUST
Confirm APR ARMED
SLAT/FLAP
BLEED SOURCE-ENG
WING anti-ice OFF?
Cowl anti-ice OFF?
V speeds insert and SET VSPEEDS (check PFD)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What actions occur after you have SET VSPEEDS on PERF/DEP?

A

Progress through CLB/CRZ/DES tabs if required.

NB: DES TYPE (VPA) and change slope 2.5 deg.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which TILE/TAB are you progressing after changing the VPA to 2.5 deg?

A

ROUTE VIA/TO (tab)
building flight route.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What occurs after entry of the flight plan on the VIA/TO tab?

A

You want to check the flight plan entry is correct.

ROUTE/LEGS
seq. AUTO
verify waypoints
Copy to secondary
FIX pg. set EOSID as reqd.
At the bottom of the page check:
DTG/ETE/ETA and FUEL

After completion check FPLN graphically and ensure MAP is setup OVERLAY/SYMBOL correctly.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What trigger occurs after you have completed confirmation the FPLN LEGS are correct? (ie. FMS setup is now complete)

A

Arm the appropriate take off flight guidance modes.

Press TOGA (check PFD)
Arm NAV and VNAV
Set Trim Tab (check)
Speed BUG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What occurs after you have press TOGA/NAV/VNAV?

A

PREFLIGHT Checklist

17
Q

What should occur after the PERFLIGHT checklist has been completed? (Process of check and crosscheck)

A

Preliminary Loadsheet arrival. followed by “Fuel Check”.
Check Fuel load is correct compared to load sheet.

Announce “Fuel Check” verbalise:
-Fuel requested versus Fuel onboard
-Fuel tank distribution
-Fuel quantity crosscheck within limits
-“Seat Belt Sign”-ON

18
Q

What occurs after the Fuel Check? (On what (2) pages are utilised for breif)

A

Flight Plan Check then ROUTE VIA/TO (tab)

(From FPLN page)
Callsign
Origin and Destination
CRZ ALT

chng. pg.

State “Loaded Route”
DTG/ETE/ARR FUEL

19
Q

What occurs after the Fuel/FPL data check?

A

ATC clearance is obtained. (insert ALT/Code)

20
Q

What occurs after ATC clearance received?

A

CTWO plus breifing

21
Q

What occurs after CTWO+ breifing?

A

Final load sheet arrival.
Crew independently check and verify data

Loadsheet verification (FPLN/FUEL)

Performance verification (PERF/DEP)

Confirm headcount “Clear to close”

22
Q

What occurs after “clear to close statement”? (2 items)

A

Check ground power is AVAIL and authorise ground crew to disconnect (wait 5 secs.)

Check SYN page/DOOR tile for armed doors

23
Q

With the Final Load Sheet what other verification happens with this process?

A

Loadsheet verification and Performance verification.
(See next question)

24
Q

How is the actual Loadsheet Verification achieved?

A

CM1 reads from FMS (FPL/FUEL), CM2 confirms from Loadsheet

-ZFW
-ZFWCG
-TOW
-TOWCG
-LW
-FUEL
-Stab Trim

25
Q

How is the Performance Verification achieved?

A

CM1 reads from the FMS (PERF/DEPT), CM2 confirms with Guru2

-TO THRUST
-FLEX (if required)
-SLAT-FLAP
-BLEED SOURCE
-WING ANTI ICE
-COWL ANTI ICE
-TOW
-STAB TRIM
-V1, V2, Vr

26
Q

Note the order sequence regarding pushback after the doors are closed.

A
  1. Completion of Loadsheet/Performance verification.
  2. “Count confirmed, Clear to close”
  3. Pushback clearance obtain.
  4. “Before Start checklist”

MOUTH music and START!

27
Q
A