Class A Limitations Flashcards
During the take off climb, you need to vertically avoid obstacles along the takeoff path which cannot be avoided visually by __ft, __ft if you bank more than 15 degrees
35, 50
The net take off flight path must allow the aircraft to clear all obstacles vertically by at least __ft
35
The net take off flight path must allow the aircraft to clear all obstacles horizontally by at least ___
90m + ( D/8 )
For aircraft with a wingspan of less than 60m, the net take off flight path must allow the aircraft to clear all obstacles horizontally by at least __
60m + ( wingspan / 2 ) + ( D / 8 )
When establishing the horizontal obstacle clearance distance, the āDā is the distance from ___
The end of the TODA, or the TORA if a turn is made prior to the end of the TODA.
Track changes are not allowed up to where the net take off flight path achieves a height equal to half the wingspan, but at least __ft, above the elevation of the end of the ___
50ft, TORA
Bank angles of not more than 15 degrees are permitted above 50ft up to __ft
400
Above 400ft, bankg angles between 15 and __ degrees may be scheduled
25
Any pat of the net take off flight path in which the aircraft banks more than 15 degrees shall clear all obstacles by __ft
50
When track changes of more than 15 degrees are not required, you need not consider obstacles with a lateral distance of greater than ___m when navigational accuracy can be maintained, but ___m otherwise
300m, 600m
When track changes of more than 15 degrees are required, you need not consider obstacles with a lateral distance of greater than ___m when navigational accuracy can be maintained, but ___m otherwise
600m, 900m
During drift down, a Class A aircraft must avoid all obstacles in the flight path by ___ ft with 5nm either side of track
2000
Enroute, with the critical engine inoperative, the net flight path must have a positive gradient at ___ft above the aerodrome, of at 1000ft above terrain and obstacles on the route within _nm either side of track.
1500, 5
Enroute, with two engines inoperative, terrain within 5nm of track must be cleared by ___ft
2000