Class 27 Flashcards
How is work measured?
Estimation, Direct observation, predetermined time systems
PTS
predetermined time systems
3 PTSs
AFTWAYS: always fair times, MTM: methods time measurement, MOST: Maynard Operation Sequence Technique commercial system
advantages of PTSs
can develop time standards before job is started, can find inefficiencies and standardize job procedures, more accurate and less subjective than time studies since performance rating is not required, it can be used to quantify learningf time and performance ratings
disadvantages of PTSs
significant training is needed, difficult with machine paced operations, multiple PTSs and some standards do not fit work
Always fair time Time measurement unit
ATOMS = 0.07 sec
in AFTWAYS, jobs are made up of
10 basic motions
3 basic sequence models in MOST
General move, controlled move and tool use
general move
movement of object freely in air
controlled move
movement of object that contacts surface
tool use
use of common hand tools or equipment