Chp 3 Positioning pumping apparatus Flashcards
Apparatus and personnel should maintain a collapse zone of at least __________ the height of any structure determined likely to collapse.
pg 126
one and a half times
Depending on the incident, apparatus, equipment, and personnel operating within_______ of the base of a high rise fire may need to be protected from falling glass and Debris pg 128
200 feet
In certain instances, the ___________ method of apparatus placement may be used to position aerial and pumping apparatus at the fire scene.
inside/outside
A dry hydrant consists of an ___________ connection on the shore and a length of pipe extended into the water with a. strainer on the end.
Pg132
intake hose
The procedures for many fire departments require that D/Os place ________ on the small diameter discharges of a dry barrrel hydrants before connecting to the large diameter discharge.
pg 132
gate valve
In tandem pumping operations, apparatus may be positioned up to _______ apart.
300ft
If the company officer of the first unit to arrive in staging becomes involved with the incident , the D/O may become the initial __________. pg 136
staging are manager
Apparatus equipped side mounted pump panels should face the incident scene so that the D/O at the pump panel controls has a view of the____
pg141
Operation
Apparatus should maintain a cleat zone of at least _______ from railroad tracks to prevent contact with objects on the tracks. pg 142
25ft
It may require _______ fro a fully loaded train to make a complete stop
one to two miles