Chapters 12-13 Flashcards
What are the sources of air contaminants?
-Carbon dioxide
-Tobacco smoke
-Mold
-Radon
-Bioeffluents
-VOCs emitted from
carpet, paints, adhesives, glues, sealants,
coatings, cleaning products, furniture, and
composite wood products.
What are the different referenced standards
for products that emit VOCs?
Paints and Coatings—Green Seal 11 Adhesives—Green Seal 36 Sealants—SCAQMD 1168 Carpet—Carpet & Rug Institute (CRI) Other Flooring—FloorScore Furniture—Greenguard™ and SCS Indoor Advantage
What are the eight strategies to address
sustainable pattern and design?
-Design walkable streets.
-Include pedestrian amenities.
-Use compact development strategies.
-Promote connectivity.
-Provide diverse land uses.
-Create a diverse community.
-Support access to sustainable food.
-Ensure that all residents have easy access to
grocery stores.
What is MERV? What is the range?
Minimum Efficiency Reporting Value (MERV)
filters range from 1 (low) to 16 (highest).
What are the two strategies to manage
rainwater during operations?
- Redirect rainwater.
- Harvest rainwater.
What are the six strategies to improve IAQ?
- Prohibit smoking.
- Properly size the ventilation system.
- Protect air coming into the building.
- Test for radon.
- Specify low‐emitting materials.
- Design for entryway systems.
What are the three strategies to improve
lighting?
- Use daylighting.
- Give occupants lighting control.
- Conduct occupant surveys.
What are the three strategies to address
thermal comfort?
-Install operable windows.
-Give occupants temperature and ventilation
control.
-Conduct occupant surveys.
What are the three strategies to improve IAQ
during construction?
- Keep the building clean.
- Protect absorptive materials.
- Conduct a flush‐out.
What are the two acoustical strategies to
improve occupant comfort?
- Consider acoustic impacts.
- Conduct occupant surveys.
Of the six available Regional Priority credits,
how many can count toward a project’s LEED
certification?
Four
A project’s available Regional Priority points
are determined by what project‐specific
element?
Geographic coordinates
How does a project team find out the
Regional Priority point opportunities for a
LEED project?
-Refer to the USGBC website
-Enter a project’s geographic coordinates or refer to
LEED‐Online for registered projects.
How many Innovation points can a LEED
Green Associate earn for a project seeking
LEED certification?
Zero, only LEED APs are eligible.
A project team diverts 97 percent of the
nonhazardous construction waste away
from a landfill. They earn all the points that
are within the credit and an additional point
that will be included in which category?
Innovation