1
Q

Sustainability

A

Providing for the needs of the current generation without compromising the ability of future generations to provide for their needs. Providing healthy, resource conserving, energy-efficient buildings. “Green” building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Building code

A

A set of regulations intended to ensure a minimum standard of health and safety in buildings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Bearing wall

A

A wall that supports floors or roofs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Non-bearing wall, partition

A

An interior nonloadbearing wall.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Heavy Timber construction

A

A type of wood construction made from large wood members and solid timber decking in a post and beam configuration.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Design/bid/build

A

A method of providing design and construction services in which the design and construction phases of the project are provided by different entities, usually used in combination with sequential construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Construction document

A

The graphic construction drawings and written specifications to which a building is constructed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

General contractor

A

A construction entity with responsibility for the overall conduct of a construction project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Subcontractor

A

A contractor who specializes in one area of construction activity and who works under a general contractor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Design/build

A

A method of providing design and construction services in which the design and construction phases of the project are provided by a single entity, frequently used in combination with fast track construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Construction manager

A

An entity that assists the owner in the procurement of construction services.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Critical path

A

The sequence of tasks that determines the least amount of time in which a construction project can be completed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly