Chapter I Electricity and Electrical Systems Flashcards

1
Q

If Stacy were to select an optimum conductor for the flow of electricity, she would select an electrical conductor that has less________

a. cable
b. wire
c. resistance
d. electrons

A

c. Resistance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Due to expense, ______ has limited us in commercial buildings and is generally restricted for use in high-speed elevators.

a. AC
b. AC-DC
c. DC
d. Electrons.

A

C. DC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The building extension is to serve as general office space. As such, it will require ____ power for its lighting and receptacles.

a. single-phase
b. dual-phase
c. three-phase
d. four-phase

A

A. single phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If David is to properly ground the electrical equipment, he cannot do this by attaching a grounding wire to:

a. a meal rod inserted into the earth.
b. the buildings steel frame buried in the earth.
c. the buildings plumbing system buried in the earth.
d. the buildings water tower located on the rooftop.

A

d. the buildings water tower located on the rooftop.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Ohm’s law describes the relationship among all of the following units of measure except:

a. voltage.
b. resistance
c. current.
d. power

A

d. power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Sue is selecting electrical protection for building occupants where significant shock hazards could possibly occur. What is the safest selection?

a. a circuit breaker
b. a GFCI
c. a fuse
d. an electrical outlet.

A

b. GFCI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The function of a transformer is to change the ____ of the electricity passing through it.

a. amperage
b. power
c. resistance
d. voltage

A

d. Voltage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

As a property manger, Bob should analyze the history of local power outages and the inconvenience and cost sustained by a loss of power before accepting a _____ when other services are available.

a. single service
b. dual service
c. normal reserve service
d. transformer

A

a. single service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

As part of a building renovation and planning for the electrical distribution system, facilities manager Chris should first determine the watts per square foot to estimate the:

a. air-conditioning load
b. people load
c. building load
d. lighting load

A

c. building load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

New electrical installations must be inspected by a qualified agency and approved for ____ compliance before a utility company will initiate service

a. insurance
b. committee
c. fire
d. code

A

d. code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
To ensure a circuit is de-energized and to prevent any possibility of shock or electrocution, a procedure required by OSHA known as \_\_\_\_\_\_ should be performed.
a. lockout/tagout
b. training
c, unlock/tag
d. none of the above.
A

a. lockout/tagout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly