Chapter 2 Electrical systems Operations and Maintenance Flashcards

1
Q

Building manager Tom is concerned with holding voltages to close tolerances in order to achieve:

a. harmonics
b. clean power
c. an uninterruptible power supply (UPS).
d. power during power outages.

A

b. clean power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Max is having an uninterruptible power supply (UPS) system installed in the facility. The main reason for such a system is to:

a. supply generally clean AC.
b. Supply generally clean DC.
c. maintain a constant voltage and frequency.
d. maintain power during power outages.

A

d. maintain power during power outages.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The technician is dealing with a problem of harmonics. Harmonics are distortions of _____ in an electrical system.

a. current but not voltage
b. voltage but not current
c. both current and voltage
d. neither current nor voltage

A

c. both current and voltage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

John is managing the renovation of his building’s equipment. the Facility designer has calculated that the max short circuit that could occur for a panel is 14, 000 amperes. which of the following rated circuit breakers would not protect the panel against a fault current

a. 10,000 amperes
b. 14,000 amperes
c. 25,000 amperes
d. 65,000 amperes

A

a. 10,000 amperes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If a buildings power factor is not within the acceptable levels established by the utility, a property manager may have to install equipment to ______ the power factor rating.

a. increase
b. decrease
c. sustain
d. stop

A

a. increase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If the property manager were in charge of a _____, he might find it more economical to have on-site power generation.

a. residential complex
b. small retail store
c. multi-building college campus
d. typical urban office building.

A

c. multi-building college campus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

If Diane is to engage in switch-gear maintenance, which of the following steps would she not perform?

a. cleaning
b. excercising
c. testing
d. valuing

A

d. valuing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

To improve the reliability of transformers, the most important maintenance function is to continuously remove________

a. coolant
b. heat
c. dust
d. energy

A

b. heat

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Because larger generation and distribution facilities are needed to compensate for reduced ssystem efficiency, the property manager can expect _____ charges from the utility company.

a. power factor
b. time of use
c. fuel adjustment
d. miscellaneous

A

a. power factor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

a _____ is preferred by many property and facilities managers because it does not include any demand charge.

a. three part rate
b. block meter rate
c. step-meter rate
d. straight-line meter rate

A

b. block meter rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly