Chapter 9: Noncombustible Construction Flashcards

1
Q
1:  What is the prevalent material of choice for noncombustible buildings? 
 A: Reinforced concrete 
 B: Steel 
 C: Concrete 
 D: Masonry
A

B: Steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

2: Which of the following would be the most important “heat” to be removed from a building?
A: Heat leaving the structure
B: Heat being evolved from contents that are burning
C: Heat being absorbed by contents or structural elements that will be ignited or caused to fail
D: Radiant heat

A

C: Heat being absorbed by contents or structural elements that will be ignited or caused to fail

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
3:  What is the fire departments heat removal medium? 
 A: Prefire planning 
 B: Fire detection systems 
 C: Sprinkler system 
 D: Water
A

D: Water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
4:  Bars can be made in which of the following shapes? 
 A: Plates 
 B: Square 
 C: Round 
 D: All of the above
A

D: All of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
5:  Which of the following is not a common wall material found in steel-framed buildings? 
 A: Matched lumber 
 B: Cement-asbestos board 
 C: Aluminum 
 D: Masonry walls
A

A: Matched lumber

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
6:  Which of the following materials is noncombustible, but has a low melting point and little mass per unit of area?  
 A: Matched lumber 
 B: Cement-asbestos board 
 C: Aluminum 
 D: Masonry
A

C: Aluminum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
7:  The lighter the steel, the less\_\_\_\_\_\_\_\_\_\_\_\_\_\_. 
 A: combustibility 
 B: fire resistance 
 C: durability 
 D: resilience
A

B: fire resistance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
8:  What is a principal variable in terms of how fast the fire temperature is achieved in steel? 
 A: The weight of the steel unit 
 B: The mass of the steel unit 
 C: The conductivity of the steel unit 
 D: Both A and B
A

D: Both A and B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
9:  A bar joist will generally fail within how many minutes if exposed to fire? 
 A: 4 
 B: 5 
 C: 7 
 D: 9
A

C: 7

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
10:  In what year did the McCormick Place fire occur? 
 A: 1947 
 B: 1956 
 C: 1967 
 D: 1976
A

C: 1967

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
MATCHING
Beams set at right angles to trusses or roof rafters to provide support
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Purlins
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
MATCHING
Embedded into the surface
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. peened
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
MATCHING
Void space made by utilizing deep parallel-chord trusses
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Interstitial space
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
MATCHING
Members with a Z-shaped cross section
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Zee
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
MATCHING
A tee where the end of a cutoff is thickened
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Bulb
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
MATCHING
Upright partition that divides a ship into compartments
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Bulkhead
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q
MATCHING
A horizontal beam that ties rows of soldier beams together
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Waler
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
MATCHING
Diagonal columns that brace an entire structure
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Rakers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q
MATCHING
Steel structural member rolled in cylindrical shapes
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Tube
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q
MATCHING
Forms a long-span system used as floor supports
1. Bar Joist
2. Bulb
3. Bulkhead
4. Interstitial space
5. peened
6. Purlins
7. Rakers
8. Tube
9. Waler
10. Zee
A
  1. Bar Joist
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q
MULTIPLE CHOICE
Steel's compressive strength is \_\_\_\_\_\_\_ its tensile strength.
A. greater than
B. less than
C. equal to
D. not related to
A

C. equal to

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q
MULTIPLE CHOICE
Steel tendons used for tensioned concrete can fail at what temperature?
A. 500 degrees F
B. 700 degrees F
C. 800 degrees F
D. 900 degrees F
A

C. 800 degrees F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q
MULTIPLE CHOICE
Atria roofs above \_\_\_\_\_\_\_\_\_ fet may be given an exemptionfrom protection of the steel.
A. 40
B. 55
C. 75
D. 90
A

B. 55

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q
MULTIPLE CHOICE
Water supplies for spray systems designed to protect steel supports for flammable liquid fires are calculated on a requirement of \_\_\_\_\_\_\_\_\_\_\_\_\_\_ gallon(s) per minute.
A. 0.25
B. 0.5
C. 0.75
D. 1
A

A. 0.25

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
``` MULTIPLE CHOICE Rigid frames can provide clear spans of about _______ feet. A. 100 B. 125 C.150 D. 175 ```
A. 100
26
``` MULTIPLE CHOICE Which material is noncombustible but disintegrates rapidly in a fire? A. Aluminum B. Glass-fiber reinforced plastics C. Cement asbestos board D. Steel ```
A. Aluminum
27
MULTIPLE CHOICE All of the following are characteristics of steel, EXCEPT: A. consistency of its structural characteristics B. strength C. inability to elongate D. ability to be connected to other structural elements
C. inability to elongate
28
``` MULTIPLE CHOICE All of the following are types of girders, EXCEPT: A. box girder B. lattice girder C. spandrel girder D. plate girder ```
B. lattice girder
29
``` MULTIPLE CHOICE Buildings in which the roof holds the tilt-up concrete wall panels in place are an example of which type of construction? A. High-rise framing construction B. Ordinary construction C. Prefabricated construction D. Tilt-slab construction ```
D. Tilt-slab construction
30
``` MULTIPLE CHOICE Steel expands from 0.06 to 0.07 percent in length for each ________ rise in temperature. A. 1 degree F B. 10 degrees F C. 100 degrees F D. 1000 degrees F ```
C. 100 degrees F
31
FILL-IN-THE-BLANK | Elongating steel exerts a/an ______ force against the structurethat restrains it.
lateral
32
FILL-IN-THE-BLANK The better a building is tied together to resist wind load, the more likely it is to suffer ________collapse due to fire distortion.
progressive
33
FILL-IN-THE-BLANK | Interstitial space comes from a/an _______ term.
medical
34
FILL-IN-THE-BLANK | Cement-asbestos board is typically used for ______ construction.
friable
35
FILL-IN-THE-BLANK | Aluminum has a/an ________melting point.
low
36
FILL-IN-THE-BLANK | During a fire, the steel structure in a building should be kept _______.
cool
37
FILL-IN-THE-BLANK | The weight of steel sections is usually given per running _________.
foot
38
FILL-IN-THE-BLANK | Very deep parallel-chord trusses have been used as ________ beams in hospitals.
floor
39
FILL-IN-THE-BLANK | To achieve a/an ________ roof, the framing may consists of columns and beams with triangular trusses.
peaked
40
FILL-IN-THE-BLANK Because of the requirement for underground parking, building excavations are being made much ________ than in previous years.
deeper
41
TRUE/FALSE | Non-combustible construction has moderate to heavy fire resistance.
False
42
TRUE/FALSE | The modulus of elasticity is high on steel.
True
43
TRUE/FALSE | Steel is a bad thermal conductor.
False
44
TRUE/FALSE | Today's high-rise construction commomly uses glass and metal panels.
True
45
TRUE/FALSE | Grease fires in ducts often extend to the structure by conduction
True
46
TRUE/FALSE | Unprotected steel structures do not have a potential for early collapse.
False
47
TRUE/FALSE | A metal-deck roof fire can sometimes be fought from the underside.
True
48
TRUE/FALSE Buildings with steel units tied together may undergo torsional or eccentric loads during a fire that exceed their capacity.
True
49
TRUE/FALSE | A small mass of steel can carry heavy loads.
True
50
TRUE/FALSE | The method of wind bracing in a building is a serious concern to fire fighters after the building is completed.
False
51
SHORT ANSWER | What are the three classes of calculated risks outlined in the text?
All of the following . Financial or economic . Engineering . Forget it
52
SHORT ANSWER | Steel buildings can be broken down into four types of protection; what are they?
``` All of the following: . Unprotected . Dynamically protected . Passively protected . Passive/dynamic combination protection ```
53
SHORT ANSWER | What methods can be used to protect steel?
Membrane protection and sprayed-on fireproofing
54
SHORT ANSWER | What is the main difference between nonconbustible and fire-resistive construction?
The level of fire resistance (fire rating) assigned to the structural frame. walls, floors, and roof
55
SHORT ANSWER | What are the benefits of using steel in building construction?
Any of the following: . Strength . Wide availability . Inexpensive cost
56
WORD FUN | A standard I-beam cut lengthwise through the web
tee
57
WORD FUN | A piece of steel that has two legs at right angles
Angles
58
WORD FUN | A steel structural component that has a square U-shaped cross section
Channel
59
WORD FUN | Plates less than 6 inches in width
Bars
60
WORD FUN | A column made of vertical units connected with diagonal pieces
Lattice
61
WORD FUN | Flat pieces of steel
Plates
62
WORD FUN | A type of beam used to laterally relocate the vertical load of columns to clear an opening area
Transfer
63
WORD FUN | Type of girder that will tie wall columns together in a framed building
Spandrel
64
WORD FUN | A lightweight material that is both malleable and nonmagnetic
Aluminum
65
WORD FUN | To evaluate and categorize
Triage
66
READ EACH SCENARIO, THEN ANSWER EACH QUESTION IN DETAIL A building has been built of steel bar joists, metal roof deck, and masonry walls. A local businessperson is purposing to put a furniture store into the building. What concerns should be noted in the prefire plan related to the steel in this building?
The contents of the building can dramatically affect the structure. It should be noted how the underside of the roof could be reached with hose streams to minimize heat damage to the joists. Special attention should be directed at the building content height as well as the general height of the building. These factors could influence the amount of time it takes for the building to collapse or become heavily involved in a fire that prevents the steel from being cooled by heavy streams.
67
READ EACH SCENARIO, THEN ANSWER EACH QUESTION IN DETAIL A steel building is under construction when it catches fire on a windy day. What special considerations does this situation pose?
The temporary bracing should be examined closely. It is impossible to make all of the connections as soon as steel is placed. Temporay bolts are placed in rivet holes; thereafter, rivets are driven in the remaining holes, then the bolts are replaced with rivets, or permanent bolts. This practice is known as"field bolting", and it is good to give a wide berth to field-bolted structures during high winds.