Chapter 8 Water Supply Operations Flashcards
How much water is carried on a SFD engine company?
500 Gallons
How long can you work off of tank water for an 1 3/4”?
Almost 3 minutes
What are the 3 water supply evolutions?
Lay in, Lay out and Split
NFPA requires what types of threads on hydrants?
National Standard Thread NST
What are the 3 basic components of a hydrant?
Barrel, stem, outlets
What is a corey top?
a 2-2.5” outlet on top of the barrel for the utilities department
What is a clow hydrant?
All outlets are arranged horizontally, found in commercial and industrial occupancies
What are the basic flows from a hydrant that an engine company can count on?
- A single 5” line may not flow all available water
- 2.5” outlet will deliver 80% of a 4.5” outlet
- 4.5” discharge will deliver 2100 GPM at 15PSI
What are the color/flow rates for the SFD hydrants?
Red - less than 500
Yellow - 500-999
Green 1,000 or more GPM
What is a forward lay?
Hydrant to the fire
Describe wet vs. dry lead
Wet - the Back up will remain at the plug to charge the plug
Dry - the Back up returns to the engine
Describe a reverse lay.
Fire building to the hydrant