Chapter 6 Flashcards

1
Q

The minimum diameter is ___” for stainless steel rods and copper- or zinc-coated steel rods.

A

5-8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A damp location is a(n) ___.

A

partially protected area; area subject to some moisture

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The minimum burial depth required for plate electrodes is ___’ below the surface of the earth.

A

2.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Metal underground water piping with at least ___’ of piping in direct contact with the earth shall be part of the GES.

A

10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In general, the EGC may be a bare, covered, or insulated conductor.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Electrical service equipment which shall be bonded together includes ___.

A

service raceways with GEC; service conductor enclosures; metallic raceways protecting the metallic sheath

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The minimum size of the EGC is based upon the rating of the ___ ahead of the supplied equipment.

A

OCPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Aluminum electrodes may be used as grounding electrodes.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The ___ conductors extend from the service point to the service disconnecting means.

A

Service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A wet location is a(n) ___.

A

installation in concrete slabs contacting earth; underground installation; location saturated with water or other liquids

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

AC systems of less than ___ V to ground shall be grounded when installed as overhead conductors.

A

50

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Electrical systems are grounded to limit and stabilize voltages to ground.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

___ wiring is basically all interior and exterior wiring installed on the load side of the service point or the source of a separately derived system.

A

Premises

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The only choice for the grounding electrode of a separately derived system is the grounded building steel.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The minimum length of a rod or pipe electrode is ___’.

A

8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The ___ connects the EGC and the grounded conductor at the service or separately derived system to the grounding electrode.

A

Grounding-electrode-conductor–GEC-

17
Q

A(n) ___ is an electrical conductor that provides a ground-fault current path.

A

Equipment-grounding-conductor–EGC-

18
Q

The ___ is the connection between the grounded circuit conductor and the EGC at the service.

A

main-bonding-jumper–MBJ-

19
Q

The grounded conductor shall never be smaller than 10-1/2% of the largest service-entrance conductor.

A

False

20
Q

The amount of current that flows in any circuit is determined by the voltage and resistance of the circuit.

A

True