Chapter 5 To 7 Flashcards

1
Q

Four types of retaining walls.

A

Gravity walls, Cantilever Walls, Buttress Walls and Counterfort walls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3 conditions before formwork can be removed/striking

A

Sufficient strength to support itself
Sufficient surface hardness to resist damage
Sufficient curing to give reasonable colour finish to the concrete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

4 specific requirements of formwork

A

Surface finish
Ease of stripping
Good alignment
Ease of placing concrete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Name 2 pressures acting on the retaining wall

A

Active pressure
Passive pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

2 plants used to transport workers and materials

A

Lorry & Truck.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3 types of contracts to be used in construction project

A

Lump-sum contracts
Measured contract
Cost-plus contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Three /more types of retaining wall failure mode.

A

Fracture, Overturning, Sliding/ Displacement, Rotating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Explain softening and ozonation in water treatment process

A

Softening: lime is added to remove perm and temp hardness

Ozonation: Filtered water flows to underground tanks where ozone gas is then injected into the water. The ozone in the water is supposed to act as a disinfectant for odour, taste, smell and other impurities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3 types of culvert that could be propsed to the client

A

Pipe culvert, RC culvert, Brick Culvert

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Name types of test for drains

A

Smoke test, Air/Pneumatic Test, Water test, Alignment test, Gradient Test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly