Chapter 2 UREs Flashcards

0
Q
  1. (207) How long do Air Force policy memorandums expire after publication?
A

A. 30 days
B. 60 days
C. 90 days
*D. 180 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q
  1. (207) Air Force policy directives (AFPDs) cannot be supplemented by subordinate units because
A

A. they supplement Air Force instructions (AFIs).
B. the Air Force Chief of Staff is the only approval authority.
*C. the Secretary of the Air Force is the only approval authority.
D. they are directed by the unit commander and are not subject to supplementing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. (207) What is the purpose of a permanent visual aid?
A

*A. Explain or instruct
B. Inform or motivate
C. Promote or endorse
D. Direct or implement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. (207) What statement about doctrine documents is true?
A

A. They support education and training programs.
B. They are published in lieu of a policy directive.
C. They direct action and provide detailed procedures.
*D. They are broad in nature and require judgment in applying them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. (207) You should reference the Air Force publishing website for publications instead of relying on paper copies because
A

A. the website versions contain more information.
*B. the website maintains the most current versions.
C. paper copies are only used for the revision process.
D. the website contains sensitive information that is not in your paper copies.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. (208) What is the quickest, easiest method of finding a technical order (TO) if you do not have the TO number?
A

*A. Look it up in an index-type TO.
B. Check the TO internet repository.
C. Look for it on the Air Force publishing website.
D. Check other TOs to find a specific reference to it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. (208) What information does an inspection workcard contain?
A

A. Step-by-step procedures
*B. Specific pass or fail criteria
C. Planned work schedule or sequence
D. Abbreviated step-by-step procedures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. (208) What procedures are included in a TCTO?
A

A. Procedures for launch facility entry and exit
*B. Modernization of the security system
C. Periodic inspections and how long it should take to complete them
D. Safety supplements to an operation and maintenance TO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. (208) What happens when an urgent TCTO is not completed within its set time limit?
A

*A. The equipment or item must be removed from service
B. An improvement report must be filed to change the TCTO
C. A periodic inspection must be completed on the equipment or item
D. The item must be returned to Depot in order to complete the required actions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. (208) Before a preliminary TO can be used for maintenance on the weapon system, it must
A

A. be incorporated into the List of Applicable publications
B. be approved for interim use by the base missile engineer
C. be accompanied by a TO waiver from your supervisor
*D. have its procedures verified with oversight from the technical content manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. (208) What determines how a TO will be numbered?
A

A. The series of production the weapon system is in.
B. When it is received by the TO library
C. The sequence identified in the index TO.
*D. The first set of numbers/letters that identify the category.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. (209) What information is located in the bottom right hand corner of a TOs title page?
A

A. When the TO was first published
B. The title and TO number assigned
C. The category of the TO and what it is used for
*D. Latest change number and when it was changed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. (209) Which section of the TO contains a variety of general procedures common throughout the TO?
A

*A. Introduction
B. List of tables
C. Safety summary
D. Table of contents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. (209) Which chapter of the TO can a technician use to determine a specific chemical required for completing a procedure?
A

A. Description
B. Safety precautions
C. List of related TOs
*D. Special tools and test equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. (209) When is a technician authorized to use TO diagrams for troubleshooting?
A

A. When directed by the workcenter supervisor.
*B. When using checkout or trouble analysis procedures.
C. After all troubleshooting procedures have been attempted.
D. When a technician has demonstrated sufficient systems knowledge.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. (210) Before submitting an AFTO Form 22, your supervisor needs to review and approve it in order to
A

A. determine manpower savings.
B. assign a report control number.
*C. ensure it is a valid recommendation.
D. approve the interim use of the change.

16
Q
  1. (210) What action must a technical content manager (TCM) take upon receipt of an emergency TO improvement report?
A

*A. Issue a rapid action change within 48 hours
B. Distribute a TO update within 40 calendar days
C. Disapprove or downgrade the report within 45 days
D. Notify QA of approval within 7 days

17
Q
  1. (210) After a routine TO improvement report is received by the technical content manager (TCM), the TO update is generally published
A

*A. within 1 year
B. within 48 hours
C. with the next publication review
D. with the next publication revision

18
Q
  1. (210) More than one correction can be submitted on a TO improvement report when
A

A. authorized by QA.
B. it is an emergency improvement report.
C. the same error occurs in more than one TO.
*D. the error occurs more than once in the same TO.

19
Q
  1. (211) CEM improvement reports are not submitted for
A

A. replacing components.
*B. changing a master change log.
C. changes to ensure system reliability.
D. correcting violations of federal regulations.

20
Q
  1. (211) Who is the final approval authority for all AFGSC Form 272s?
A

A. QA
B. NAF
C. Base missile engineer
*D. Missile engineer squadron

21
Q
  1. (211) When a CEM change is authorized for interim use, who must provide final approval?
A

A. Technical engineering and QA
*B. MXG/CC and base civil engineer
C. Base missile engineering and Mx superintendent
D. AFGSC and the NAF

22
Q
  1. (211) When an emergency CEM improvement report is submitted, changes need to be made to alleviate the issue within
A

A. 48 hours
*B. 30 days
C. 45 days
D. 180 days

23
Q
  1. (212) An organization receiving equipment from the Air Logistics Center must
A

*A. accomplish an acceptance inspection on all items.
B. perform programmed depot maintenance.
C. establish a product improvement group.
D. initiate a deficiency investigation.

24
Q
  1. (212) Which deficiency report classification would be appropriate if the reported defect is likely to result in a hazardous condition?
A

A. Minor
B. Major
*C. Critical
D. Significant

25
Q
  1. (212) What type of deficiency is assigned when a component is installed and fails right away or within its warranty service period?
A

A. Design
*B. Quality
C. Material
D. Procurement

26
Q
  1. (212) What step in the deficiency reporting process reviews deficiency reports for proper categorization, validity, correctness of entries, and accuracy?
A

A. Action point
B. Support point
*C. Screening point
D. Originating point

27
Q
  1. (213) Which of the following is not an objective of the integrated maintenance data system (IMDS)?
A

A. Eliminate and/or reduce nonproductive administrative tasks
B. Provide more accurate maintenance data to develop concepts
*C. Eliminate and/or reduce maintenance related accident reporting
D. Ensure material is serviceable, operable, and properly configured

28
Q
  1. (213) What IMDS function allows the user to view historical data?
A

A. Reporting
B. Database updates
C. Real-time retrievals
*D. Background retrievals

29
Q
  1. (213) What IMDS subsystem allows the user to track maintenance actions and has both maintenance and supply data?
A

A. Operational events
*B. Maintenance events
C. Maintenance personnel
D. Job data documentation

30
Q
  1. (213) What IMDS operational event phase provides the capability for periodic reports of mission accomplishment?
A

*A. Analysis phase
B. Mission recording
C. Automated debriefing
D. Mission accomplishment

31
Q
  1. (213) What IMDS subsystem provides the capability to order parts for unscheduled discrepancies?
A

A. Training management
B. Maintenance personnel
C. Job data documentation
*D. Base supply system interface

32
Q
  1. (214) What role does HQ USAF have in NWRM?
A

*A. Manage and publish the master NWRM listing
B. Exercise security over NWRM asset in their possession
C. Ensure unit compliance with NWRM discrepancy reporting
D. Appoint an inventory officer to conduct periodic inventories

33
Q
  1. (214) Who is responsible for developing a QA program that focuses attention on NWRM?
A

A. Unit commanders
B. Wing commanders
*C. Group commanders
D. Major command commanders

34
Q
  1. (214) NWRM responsibility officers are responsible for
A

A. publishing logistics requirements on the NWRM SharePoint website.
B. executing inventories and audits and briefing commanders on the results.
*C. maintaining a list of NWRM components not installed in the weapon system.
D. designating personnel trained and qulaified to ship and receive components.

35
Q
  1. (214) What statement about NWRM semi-annual inventories is true?
A

A. Missiles will be taken off alert in order to verify components.
*B. Packaged containers showing signs of tampering need to be opened.
C. If an NWRM item is signed out, the item is considered accounted for.
D. Line replaceable items need to be disassembled in order to be inventoried.

36
Q
  1. (214) How often are those performing NWRM related duties required to complete the NWRM Fundamentals Course?
A

A. Only once
B. Every 6 months
*C. Every 12 months
D. Every 24 months