Chapter 2: Prefire Planning Flashcards
Incident commanders should be trained and knowledgeable in?
Pre-incident planning
The process of gathering and evaluating information, developing initial actions based on that information, And ensuring that the information remains current.
Pre-incident planning
Assessment of a facility or location maybe for an emergency occurs.
Pre-incident survey
What comes first the pre-incident planning or the pre incident survey?
Pre-incident survey
The amount of content in a structure determine what?
Fuel load
Skylights with_______panels or ordinary windows glass act as automatic vents when the fires he melts the plastic or breaks the glass.
Thermal plastic
Stadium pompous ass strategic intervals within the supply line lay can boost pressure and help overall friction loss that distance can cause.
Relay pumping
A formal written agreement between jurisdictions that share a common boundary
Automatic aid
A reciprocal agreement between two or more fire and emergency services organization
Mutual aid
__________ are similar to mutual aid, except that payment rather than reciprocal aid is made by one agency to the other.
Additional resources
These codes defines the type of construction materials and techniques use for particular purposes.
Building code
Company officers should survey buildings while they are under _________.
Construction
How many types of construction is there?
5
Every structure is composed of basic building elements.
Structural frame Load bearing walls Non-loadbearing walls Floor construction Roof construction
Type of construction were all structural members are composed of only non-combustible materials that possess a high fire resistance rating.
Type 1 construction