The highest point of a swale should be at least _____ lower than the finish elevation of any paved area or structure.
6 Inches
From that high point, a minimum of 2% downstream slope should be maintained with grades up to ______ allowed for short distance.
3%-5%
Never connect storm drains to what?
Sanitary sewer lines
What is the average life of a trench drain?
5-10 years
Beginning at the outlet point, excavate a _______ wide trench along the entire length of the collective system.
8-12 Inch
The trench should be deep enough that the grade can fall at a ________% rate from the highest inlet to the outlet point.
1%
Excavating the trench ______ inches deeper will allow a sand setting bed to be added.
1 to 2
Water flows into clay or concrete piping and is typically laid at a minimum slope of _______% to maintain flow.
1
Treatment of a drain outlet with ______ riprap to prevent erosion.
4-8 Inches
Masonry paved bricks used for a walkways and patios are thinner than regular bricks by approximately _________?
1 Inch
What are the actual dimensions of a 4 x 4 post?
3 1/2 x 3 1/2
Which treatment would be the least effective for preserving wood?
Paint
What is the minimum slope on a concrete patio to allow for drainage?
1/8”
The greatest angle above the horizontal plane at which a material will lie without sliding is _______?
Angle of repose
What is the purpose of “as built” (Record) drawings?
To insure that changes and deviations from the plans are recorded so the contractor can charge the owner.
When routing the electrical supply to an exterior location, all components should be placed in what?
Conduit
How deep should the conduit be in the ground?
18 Inches
How many ways for transformer and wiring options for DC lighting?
2
Installing conduit will ensure what?
Longer-lasting installation with fewer maintenance issue.
Excavating an 18 inch deep by _______ wide trench for proper conduit installations?
4 Inches