CHAP 13 Flashcards
1
Q
- Quality control includes all of the following EXCEPT:
a. following standardized procedures
b. using standards and controls
c. Six Sigma methodologies
d. instrument calibration
A
c. Six Sigma methodologies
2
Q
- Documentation required in a phlebotomy department includes a/an:
a. procedure manual
b. evaluation of turnaround times
c. reference manual
d. both a and c
A
d. both a and c
3
Q
- The principle and purpose of each test is
included:
a. on the requisition form
b. in the laboratory report
c. on the patient’s wristband barcode
d. in the procedure manual
A
d. in the procedure manual
4
Q
- When developing policies and procedures it is important to identify:
a. qualifications of the persons performing the tests
b. areas where the test is being performed
c. variables that may affect the procedure
d. the primary purpose of the procedure
A
c. variables that may affect the procedure
5
Q
- An error in correctly reporting a patient’s test result is considered a/an:
a. pre-examination variable
b. examination variable
c. post-examination variable
d. all of the above
A
c. post-examination variable
6
Q
- An error in properly identifying a patient whose hemoglobin is being monitored every 4 hours might be detected by:
a. a delta check
b. autoverification
c. the chemistry supervisor
d. both a and b
A
b. autoverification
7
Q
- The primary goal of a QMS is to:
a. increase laboratory efficiency
b. reduce medical errors
c. monitor laboratory productivity
d. increase employee satisfaction
A
d. increase employee satisfaction
8
Q
- Documentation of the laboratory’s overall quality of work is provided in the laboratory:
a. quality control records
b. quality essentials
c. quality management system
d. quality indicators
A
c. quality management system
9
Q
- A recommended way to measure and assess the phlebotomy QSEs is to establish and monitor:
a. quality indicators
b. quality improvement
c. quality control
d. quality management
A
a. quality indicators
10
Q
- The basic principle of the Lean system is to increase efficiency and proficiency by:
a. continuous quality improvement
b. documentation of quality essentials
c. elimination of waste
d. rotation of duties
A
c. elimination of waste
11
Q
- Which of the following does NOT pertain to the Lean system?
a. sort
b. sustain
c. stabilize
d. scrub
A
c. stabilize
12
Q
- Six Sigma methodology is a:
a. departmental assessment of variables
b. statistical determination of variable and
error reduction
c. quality assessment method to control variables
d. departmental assessment of errors and quality
A
b. statistical determination of variable and
error reduction