Ch 3 - Practice Exam Flashcards
C. The drainage system of the building or premises
A. True
B. Buildings with plumbing fixtures
C. Reamed to the full bore of the pipe or tube
B. Any lot other than the lot that is the site of the building served by such facilities
C. Relocated to avoid interference
A. Accepted engineering practices
B. 1/2
B. On an interior lot
A. 45 degrees
A. Each floor not to exceed 15 feet
10 feet
A. A firm bed
B. False
A. Metal insert or metal compression
B. 10 feet
B. 12
C. 10 feet
D. Horizontal movement
B. Code
D. Packed
A. Comply with approved applicable standards
C. Approved by the Authority Having Jurisdiction
B. Iron pipe size
A. True
B. The installations of approved metal collars or screens
B. False
D. All of the above
C. Concrete, masonry
A. 4
C. Medical gas piping
B. Thermally insulated
B. Twice the test pressure applied
B. The approval shall have no effect beyond that Authority Having Jurisdiction boundary
C. Except when designed to prevent water from entering or accumulating within components