Ch. 2- Priority Deployment Of First Alarm Assignment Flashcards
The difference between a successful emergency operation which is brought to an early conclusion and one that becomes a protracted effort, often heavily taxing a department’s resources, depends greatly on actions taken by who?
First arriving companies
Normal first alarm assignment for a reported fire in a high rise structure
- (5) fire companies
- Airborne engine company component (task force)
- BLS ambulance
- ALS ambulance
- EMS captain
- Battalion Chief
The five fire companies will consist of
- (2) truck companies
- (3) Engine companies
*may arrive in task force or light force configuration
Who will also respond on the first alarm assignments to incidents in specific first in districts
Squad
What are key to understanding and locating equipment in these buildings (High rise)
Pre-incident planning and fire prevention
Who shall be responsible for the overall personnel accountability at an emergency incident
Incident Commander
F-666
Accountability and inventory worksheet
Who shall be responsible for the accountability of resources and personnel assigned to their area of responsibility
Division or Group Supervisors
First-in company tactical objective
Fire Attack Team
Primary responsibility of First in company
Locate and identify the emergency and determine its scope
Minimum of how many members from the initial fire attack team shall ascend to the reported floor
Four members
Fire attack Team should check conditions two floors below the reported fire floor as to ascertain if it is suitable for ____
Staging
What’s the second in company responsibility
Establishes lobby control and the officer becomes IC
What does lobby control do?
- Controlling elevators
- Vertical access routes
- Activating the building’s communication systems
- Controls air handling system (initial pressurization of stairwells)
Who supplies water to the buildings standpipe system
First arriving 200 series Engineer or when the first arriving and second arriving companies are single engine companies the Engineer of the second arriving company has the responsibility for water supply