CEC Content 23/24 Flashcards

1
Q

What is the base pump pressure required for a standpipe system once it’s determined that the fire pump has not activated at a hi rise fire?
a) 1000kpa
b) 1300kpa
c) 1400kpa
d) 900kpa

A

c) 1400kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What’s the pressure the gate and gauge is set to at a hi rise fire, you are hooked into a hose
cabinet on the floor of the fire? You are using 2 lengths of hose and 65mm nozzle.
a) 400kpa
b) 450kpa
c) 500kpa
d) 350kpa

A

b) 450kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Minimum residual pressure on the compound gauge (intake) at the pump panel is?
a) 200kpa
b) 150kpa
c) 100kpa
d) 50kpa

A

b) 150kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

P106 is dispatched to a confirmed working fire on the 10th floor. Upon investigation they determine the hallway is compromised with smoke. They hook into the hose cabinet on the 9th floor and have deployed 3 lengths of 65mm hose and Elkhart nozzle. What’s the pressure
the gate and gauge would be set to, to supply the 1000 litres per min?
a) 450kpa
b) 400kpa
c) 550kpa
d) 535kpa

A

d) 535kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A crew has determined there is no pressure from the hose cabinet at a confirmed working
fire at a hi rise. What is a method that could be used to get water from the ground floor to
the fire floor?
a) Improvised standpipe
b) Aerial waterway
c) 65mm dead bed up an aerial
d) All the above

A

d) All the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In a building that has hose cabinets that would discharge greater than ______kpa, a
PRV/PRD must be installed.
a) 1000kpa
b) 1100kpa
c) 1225kpa
d) 900kpa

A

c) 1225kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Two trucks working in tandem, pumping (relay pumping) at a hi rise is able to achieve higher
discharge pressures to reach taller buildings. The source pumper shouldn’t exceed
______kpa to prevent the pressure relief valve blowing off on the FDC pumper?
a) 1000kpa
b) 1200kpa
c) 900kpa
d) 1400kpa

A

a) 1000kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

As an operator at a hi rise fire, you determine the FDC swivel is inoperable, what can you
use to make the connection complete to provide water to the standpipe?
a) Spin the hose counterclockwise prior to hatching
b) Use a double male and female adapter
c) Pump into a main floor hose cabinet if there’s no PRV/PRD
d) All the above

A

d) All the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A “wet test” can be preformed at any hi rise providing the couplings are tight on the line from the truck to the FDC. What discharge pressure would you charge the line to prevent any
damage being done?
a) 100kpa
b) 200kpa
c) 400-500kpa
d) 1000kpa

A

c) 400-500kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If you and your officer are reconning a fire floor and encounter smoke in the hallway, a good practice is to?
a) Deploy a smoke curtain once a hose cabinet is secured
b) Hook into a hose cabinet on the floor below
c) Stretch the hose line in the stairwell, including up a flight of stairs, to use gravity to aid in
deploying the line into the hallway
d) All the above

A

d) All the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

S107 is supplying a horizontal standpipe at a fire. The hose lay is 60m of Hi vol to a triplex,
from the triplex there are 2 65mm lines each to a gated wye 30m in length. From the first gated wye is 60m of 45mm to 2 combination nozzles, and the 2 nd 65mm has a gated wye to 2 45mm hand lines of 90m, both having smooth bore nozzles. What is the pump pressure required to supply this hose lay?
a) 1375kpa
b) 1500kpa
c) 1325kpa
d) 1385kpa

A

c) 1325kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

S111 is supplying the following hose lay at fire protecting exposures. They have their ground deluge set up with a set of 44mm stacking tips that’s being supplied 90m of Hi vol, and they’ve deployed their 65mm pre-connect line and extended it to 120m with a smooth bore nozzle. What is the pump discharge pressure required to supply the ground deluge?
a) 995kpa
b) 750kpa
c) 1050kpa
d) 820kpa

A

a) 995kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

S111 is supplying the following hose lay at fire protecting exposures. They have their ground deluge set up with a set of 44mm stacking tips that’s being supplied 90m of Hi vol, and they’ve deployed their 65mm pre-connect line and extended it to 120m with a smooth bore nozzle. What pressure do you require for the 65mm hand line?
a) 900kpa
b) 550kpa
c) 700kpa
d) 750kpa

A

d) 750kpa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In fireground survival teachings, the Pneumonic GRABLIVES is used. What does the I stand for?
a) Initial
b) Illuminate
c) Inside
d) Isolate

A

b) Illuminate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

In fireground survival teachings, the Pneumonic GRABLIVES is used. What does the V stand for?
a) Volume
b) Vector
c) Velocity
d) Various

A

a) Volume

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

If you are in a zero-visibility setting, and you become disoriented, a good practice to self rescue is?
a) Locate a hose line
b) Call a MAYDAY
c) Control your breathing
d) All the above

A

d) All the above