Case Study: The River Tees - Paper 1 Flashcards

1
Q

Where is the source of the river tees located

A

Cross fell, in the Pennines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where’s the mouth of the river tees located

A

Middlesbrough into the North Sea

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where is the river tees located

A

North east England

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How many people are at risk of flooding in the tees area

A

24,000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Since 2002 how much money was invested into flood management strategies

A

£11 million

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

4 types of hard engineering strategies

A

Flood gates
Embankments
The tees barrage
Cow green reservoir

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Describe the floodgates used as a hard engineering strategy

A

Concrete walls
A barrier between the town of yarm and rising waters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Describe the embankments used as a hard engineering strategy

A

Added along the river to raise the banks
Therefore the river can hold more water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When was the tees barrage constructed

A

1995

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How much did the tees barrage cost to make

A

£54 million

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What happens to the tees barrage now

A

Constantly kept at a high level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When was the cow green redevoir built

A

1970s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How long is the cow green reservoir

A

1/4 of a mile

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many litres of water does the cow green reservoir hold

A

40,000 million litres

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the 2 types of soft engineering strategies used

A

Flood warnings
Flood plain zoning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Describe the use of flood warnings

A

Direct system
Set up to give people early flood warnings

17
Q

Describe flood plain zoning

A

Discourage of building on low lying land to reduce future risk

18
Q

flood management issues - positive social

A

Reduce levels of anxiety
Reduce levels of depression

19
Q

flood management issues - negative social

A

Not all defences work e.g. there was a flash flood in Eston in 2017. This caused travel disruption.
Some people think sole of the defences are ugly

20
Q

Flood management issues - positive economic

A

Dozens of businesses are now protected

21
Q

Flood management issues - negative economic

A

Vast number of flood defences are £££ to maintain
Cost scheme about £54 million

22
Q

Flood management issues - positive environmental

A

Creation of reservoir created aquatic habitats
28 environmentally designated sites at risk from flooding which need protection

23
Q

Flood management issues - negative environmental

A

Flood walls are a barrier to some forms of wild life
People oppose cow green rés ovoid as it could damage habitats