Case Study Specific Flashcards
What is the form of construction for the building?
Traditional half-timber frame revivalist front elevation with timber roof structure.
Traditional single-leaf brickwork to the side and rear elevations.
It wasn’t possible to confirm the material used for the infill, but this appears to have been rendered, likely with a lime mortar mixed with Portland cement.
What are some common issues with timber framed buildings?
Externally exposed timbers could be weak to weathering.
Decay to the timber structure.
Render defects can contribute to timber decay.
Structural problems due to failure in the joints.
Where a structure jetties out, inadequate restraint of the joists can cause failure.
How was the health and safety managed?
The Contractor was invited to view the site, prepare a risk assessment and method statement with consideration to access and fall arrest, they proposed the use of a scaffold tower and CAT ladder, which was reviewed by the principal designer, who was satisfied with their solution.
What is the legislative basis for listed buildings?
Planning (Listed Buildings and Conservation Areas) Act 1990
Where can you get guidance for working on listed/historic buildings?
National Trust
Historic England
RICS Guidance
SPAB
What are SPAB’s three principles for work on historic building?
Repair, not restoration.
Responsible Methods
Complement, not parody
Regular mainetance.
Respect of Age
Essential Works Only
Information
What considerations were there for prelims/method of work?
Prelim considerations included:
Access
Welfare Provision
Safe system of work
Material delivery and storage