C9 - CDM Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

Scope of works under CDM

A
  • Building
  • Renovation
  • Alterations
  • Maintenance of premises
  • Civil engineering works
  • Demolition
  • Engineering construction
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Duties under CDM

A
  • Appointment and competence of relevant parties
  • Notification of projects
  • Preparation of pre-construction information
  • Preparation of the construction phase plan
  • Provision of appropriate and relevant information to all parties
  • Preparation of the health and safety file
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Notification criteria

A

Must be over 30 days and have more than 20 workers

Or

Involve more than 500 person days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Precautions for ladders

A
  • Erected on firm, level ground
  • Supported by stiles
  • Top of ladder rest on firm, solid surface
  • slope 1:4
  • Secured at top, or near base by guide ropes
  • One person at a time
  • Metal not used where electricity hazards exist
  • Painted ladders not permitted
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Tower scaffolds

A
  • Light duty, inspections and painting
  • Mounted on 4 wheels so unit can be moved
  • Limited to 12m typically
  • Internal use not exceed 3.5 times the shortest base dimension [externally reduced to 3]
  • Outriggers used
  • Scaffold set up on ground lv
  • Wheels turned outwards
  • Only moved by pushing/ pulling base
  • Not moved while staff on scaffold
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Types of demolition

A
  • by hand
  • Demolition ball from crane
  • Pusher arm
  • ## Deliberate collapse
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Duties of a principal contractor under a notifiable CDM project

A
  • Ensure client aware of their duties
  • Ensure CDM coordinator is appointed
  • Ensure HSE notified before works start
  • Ensure all other contractors aware of planning scheduling
  • Ensure competent and adequately rescored designers are used
  • Develop and update construction plan
  • Plan, monitor and manage construction phase
  • Liaise with CDM coordinator regarding on going design
  • Ensure welfare facilities are provided and suitable
  • Enforce site rules
  • Provide suitable access to contractors when required for their phase
  • Prevent access to site to unauthorised persons
  • Provide induction to those required for site
How well did you know this?
1
Not at all
2
3
4
5
Perfectly