builder advanced ch6 Flashcards
NAVFAC has developed three quality management programs to ensure quality workmanship.
- construction contract quality management
- facilities support contract quality management
- construction quality control
What quality management program provides guidance to naval shore activities on how to obtain quality public works support services through quality assurance?
Facilities support contract quality management,
MO-327
TRUE/FALSE
The navy recognizes quality as individual contribution and team effort in an organization
True
Quality control checks should be conducted at what time intervals?
Daily
TRUE/FALSE
Quality control is a management system established to ensure a construction project is completed with a specified minimum quality.
True
Quality control measures are to be listed in plain language on what sheet?
CAS
TRUE/FALSE
The first step in ensuring quality is to establish a means for measuring QC progress.
True
TRUE/FALSE
The daily QC inspector’s report is used to document the completion of required checks, tests, and inspections.
True
What office can approve any battalion recommended field adjustment requests (FARs) or customer requested changes?
ROICC
Any changes to a project that requires 50 or more man-days of additional direct labor or cause an increase in the cost of the project by $500 or more must be approved by whom?
COMSECONDNCB OR COMTHIRDNCB
What staff provides direct liaison between the battalion and the ROICC?
QC
What agency publishes the Construction Inspector’s Guide, EP 415-1-261?
U.S Army Corps of Engineers
The primary function of an inspector is to make certain that the work is preformed in every aspect in accordance with.
drawings and specifications
Concrete construction must meet the requirements set by.
the American National Standards Institute
What type of concrete foundation is used when the subsoil is not considered well enough for spread footings?
Mat (raft or floating)
What is the lowest foundation of a concrete structure?
Spread footing