Briefing Flashcards

1
Q

Apa yang harus dipahami di saat awal sesuai briefing?

A

> Job desk/ minimum requirement.
training minimum.
role responsibility.
emergency response.
technical manual book
design basis original
process safety information (PSI).
process upset
Audit dan finding
Top five risk
Mahar/MAE
Alarm system/Alarm Management.
Cause and Effect diagrams
Shutdown hierarchy (local, process, emergency).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

berapa POB yang perlu dokter dan berapa yang perlu paramedik saja?

A

> 100 dokter
< 100 paramedik

[info pak Mun saat handover]

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

berapa jarak pipa dari HT ke Singapore?

A

470 km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

berapa jarak HT ke Malay (Duyong)

A

90 km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

berapa kedalaman laut atau jangkah bawah HT?

A

90 km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

berapa pressure dari HT ke Malay yang di preservasi?

A

125 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

singkatan apa itu FRC? dan ini dipakai untuk apa?

A

Fast Rescue Craft | untuk menolong orang overboard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Consumables apa yang perlu dipastikan selalu tersedia di HT?

A

> freon
MEG
antifoam
deformer
water clarifier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Ada berapa stream metering di HT? dan sebutkan usage nya

A

ada 3.
Stream 1: spare
Stream 2: WNTS (West Natuna Transportation System).
Stream 3: Duyong / Malaysia

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Apa yang menjadi outstanding berat di instrumentasi untuk new GSA?

A

Mercury Analyzer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Apa yang dilakukan terkait sumur dekat HT yang bocor? berapa SITP well nya? | berapa jarak nya dari HT | berapa biaya untuk PA?

A

survailance tiap hari senin / weekly pakai chopper (visual saja). | 925 psig | 8 km | USD 20 juta.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Berapa POB HT max

A

44 orang

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Berapa POB Belida max

A

120 orang

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Siapa yang ngurusi attrition / atau zero based di offshore?

A

pak Taufik dan Endras Pribadi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Nama Lead Operation HT

A

Gunawan/Wawan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Nama Lead Maintenance

A

Endang/Darwin

17
Q

Nama Radio Op/Medic/HLO

A

Irwan/Bernardus Edith K

18
Q

Nama Production Operators

A

Azwandi/Budi Gunawan
Tri Wahyudi/Fatoni Nur H
Robby Setiawan/Hendra

19
Q

Nama Instrument Tech

A

Hari Kristato/Masruri

20
Q

Nama Metering Tech

A

Arif Rohman/Handanu Adiwidagdo

21
Q

Nama Crane Operator/Rigger/MM

A

M. Sobri/Ali Selamat
Saiful Anshori/Lut Ibrahim
Shafrizal/Adnan Mada’i
M. Karmi/Hairuddin
Tarmiza/Irwan Siswandi

22
Q

Nama Electrician Tech

A

Ayusta Poerbiyanto/Deden SA

23
Q

Nama Mech Tech

A

Rudy Y Bahori/ M Budi Fitriansyah
Yocky Fitra P/Pitoyo Edi N

24
Q

Nama platform di WHO

A

Belida (ada oil jadi ada juga FSO), HT

25
Q

Nama platform di EHO

A

Kerisi, Belanak, Belanak FPSO, South Belut, North Belut

26
Q

berapa gas compressor di HT, dan kapasitasnya

A

2; 2x75 MMscfd at 150 psig

27
Q

berapa gas turbine generator di HT dan kapasitasnya

A

3, 3x1 MW | 480 VAC

28
Q

berapa metering di HT, dan berapa kapasitasnya

A

3 stream; 3 x 300 MMscfd

29
Q

berapa slug catcher di HT, dan kapasitasnya

A

2; 250 MMscfd, 7500 BPD each

30
Q

berapa kapasitas produced water handling di HT

A

7500 BPD

31
Q

berapa refrigerant compressor di HT dan berapa kapasitasnya?

A

2, 73.92 MMBTUD each

32
Q

berapa condensate tank dan kapasitasnya di HT

A

1, 1000 bbls

33
Q

berapa slope tank dan kapasitasnya di HT

A

1, 1000 bbls

34
Q

berapa accommodation di HT

A

24 beds + 20 beds (portacamps)

35
Q

berapa kapasitas life boats di HT

A

2 x 24 person

36
Q

berapa kapasitas FRC

A

12 persons

37
Q

berapa jumlah crane dan kapasitasnya

A

2 x 22 tons

38
Q

apa merk DCS dan SIS?

A

DCS: rockwell plantpax ;
SIS: ABB xa800

39
Q

apa nama sumur yang bocor?

A

Buntal-5