Blueprint Letter Indentifiers Flashcards
G
(general) project phasing, contractor staging areas, schedules, fencing, photographs, code summary, symbol legends, and site maps
H
hazardous materials. Handling, removal and storage of hazardous materials.
V
survey/mapping surveyed and digitized points and features.
B
geotechnical. User defined
C
structure removal, site clearing, excavation, site grading, roads, water ways, sanitary and storm sewers , pavers, plot plans & details
L
Landscape, landscaping, planting, site hardscaping and irrigation
S
structural concrete, steel and wood structure and details
A
Architectural ~Floor plans, elevations, finishes, building sections, schedules and details
I
interiors. Interior demolition, furnishings, graphics,and interior design.
Q
equipment installed outside and inside of the building, such as athletic bank, dry cleaning, kitchen medical and playground equipment.
F
fire protection. Fire alarm and suppression systems
P
plumbing. Waste and water supply systems
D
process. Piping systems, equipment, and instrumentation
M
mechanical. Heating, ventilation and cooling systems
E
electrical. Power and lighting systems