AUCs Flashcards
Sequential ventilation with positive pressure fans will be ineffective if CO levels are between ____ppm.
0-60ppm AUC 349 8.2
During a positive pressure fan operation the bulkhead door may be burped for approximately ____ seconds.
60 seconds. AUC 349 7.5
Department apparatus should be kept at a minimum of ____ feet from a leak in the Buckeye Pipeline System.
600 feet. AUC 149 6.5.7
How many turns to turn off the Buckeye Pipeline?
42 FULL turns CLOCKWISE
Members must have ___ years experience in the FDNY to be considered for chauffeur school.
3 years. AUC 254 3
Yellow parkway hydrant valves require ___ turns __________ to open.
18 turns clockwise. AUC 205 add 2 2.4
Units that are assigned portable dewatering pumps must ensure they are on the rig ____ hours before the storm hits land.
48 hours AUC 159
A PCB transformer contains ___ or more ppm of PCBs
500 ppm or more AUC 266 3.1
During Phase II “Water pressure emergency”, upon completion of assigned patrol duties what does the officer fax to Battalion?
LOSS is the acronym. Low Pressure, Open, Shut, Spray caps.
- Areas experiencing dangerously low pressure that could affect FF ops
- The number of illegally opened hydrants
- The number of hydrant shut down
- The number of spray caps placed
Conflict of interest does not require written notification to BITS
Req notification to the IG. AUC 268A 1.1, 4.1