AUC's Flashcards
What should be done if a missing street sign poses an exceptional problem for apparatus response?
A report noting the condition sent to Assistant Chief of design and construction copy and forward to bureau of operations
SPEED HUMPS or “vertical traffic calming device”, “pavement undulation”, or “sleeping policeman” are?
3-4” raised, slightly longer than avg auto and span the width of the street. When sign for speed humps missing, report shall be forwarded to bureau of operations.
Advisory speeds= 15 MPH for 4”
20 MPH for 3”
Speeds shall be adhered to at ALL times
Speed BUMPS are 3-6” high and 12” wide and are illegal in NYC
What form must SA officers fill out and forward to assigned Div each tour?
BP-82
Buckeye pipeline consists of….?
(2) 12” steel pipes
(1) gasoline (1) kerosene bases aviation fuel
Operates at 1,200 psig in Linden NJ
Max service pressure on terminal pipping and delivery to shippers line in LIC is 200 psig.
Control valves in Buckeye pipeline automatically limit pressure in main line to..?
1200 psig.
- pressure switches shut down pump if control valves fail
- Relief valves kick in in both fail
- Automatic valves normally require no FD action
Types of wrenches for Buckeye Pipeline?
(1) Short “T”, which is used to open hinged cover of valve
(2) 3 1/3’ YELLOW wrench with FEMALE fitting
(3) Combo wrench, also 3 1/2’ and YELLOW with fitting for opening cover on one end of “T” handle
How is manual shut off to Buckeye pipeline accomplished?
Shut off generally located below ground under hinged cover.
1/4 turn left or right to open cover
-3 1/2’ wrench with female coupling inserted and turned 42 FULL turns or 84 Half turns CLOCKWISE
-EXCEPTION are valves at SHIPPERS LINE LIC, these require 24 FULL or 48 HALF CLOCKWISE turns
-Above ground valves are located behind metal wire fence
-Div 8 has Buckeye Pipeline Coordinator.
Normally assigned units to Buckeye pipeline shall carry how many wrenches?
(1) set on rig and (1) permanently marked at H.W. with Alarm assignment cards and extra pipeline map.
- Additional foam shall be stored with spare wrenches
- Additional Engines responding from qtrs on 2nd alarm associated with leak shall place additional foam on apparatus
- If 10-8 when ticket received MUST NOT return to qtrs
When operating at verified leak (2nd Alarm), units assigned to closing a valve and patrolling to adjacent valve….?
Both functions will be carried out simultaneously
- foot patrols carried out by (2) HT equipped members
- If ignition occurs prior to FD arrival, ISOLATION of pipeline by closing valves is still of primary importance.
- closed valves ONLY opened by Buckeye personnel when directed to do so by IC
What is PRIMARY consideration at leak from Buckeye pipeline?
EVACUATION of area involved
-Avenues of Escape MUST remain open
-If strong wind blowing all ignition sources in the path of drifting vapors must be extinguished and then all ignition sources in the area
What type of day presents the greatest potential for explosion?
Hot, humid, calm day
Rig distance from leak at Buckeye pipeline?
Not closer than 600’
How to create a path for rescue at Buckeye pipeline fire?
SOLID hose stream held HORIZONTAL a few inches above the ground moved rapidly side to side will create a path for rescue
How far must flag persons be placed at a buckeye pipeline incident near a railroad?
1000’ on each side of incident
When are Buckeye pipeline valves inspected?
Inspect during hydrants and familiarization drills
- If critical need for repair noticed immediately contact Div 8 coordinator
- BOROUGH Drills (in Oct/Nov) ONLY drill when valves ARE shut
What is Iroquis Pipeline?
Single 24” high strength steel pipeline that interconnects w/ConEd, carrying Natural Gas under pressure.
Max operating pressure of 1,440 psig
Typical operating range between 400-1,100 psig
How many turns to shut off valve in hunts point (Iriquios pipeline) which is covered by flush mount valve box similar to Con Ed manhole cover?
213 Full turns
Special wrench stored inside entrance gate
Another at FDNY command post at 500 Food Center Drive
And R-3 carries a hydraulic wrench
When should Iriquois pipeline valve be shut?
Except when immediate threat to life or property, no valves should be opened or closed without approval of FD IC in consult with Con Ed
INITIAL action at Iriquios pipeline are?
Set perimeter and Eliminate ignition sources
If ignited consider shutting gas supply
What is PRIMARY consideration at Iriqouis pipeline?
Evacuation of Area involved
Avenues of escape MUST remain open for civilians and PD
Iriquois pipeline, how far for flag persons?
At least 1000’ on each side of leak, HT and flashlight equipped
When can Iriquios pipeline valves be operated for drill
Under NO circumstance shall valves be operated w/o consult of ConEd and Iriquios
-NEVER FULL closure during drills
Who shall perform patrol of pipeline to locate leak at Iriquios pipeline?
Squad or SSL
When are brush fires most common?
Spring and Fall
Weather is central factor affecting severity and incidence of Brush fires, what are main conditions that lead to brush fires?
Low humidity
Winds in excess of 15 mph
Little or no rain in preceding 3 or more days
Types of brush fires?
Surface=grass/weed/small trees/fast moving MOST COMMON
Bog=start at surface and burn down
Crown=Burn along tree tops, Rare in NYC
What should Initial attack operations at a brush fire be?
- Concentrate on MOBILITY, avoid hooking up to a hydrant except to protect exposures
- ONLY operate IFO fire to protect LIFE
- attack from flanks
- fire attack can begin once exposures are covered
Indian pump and Bambi bucket carry?
Indian pump=5 gallons
Bambi bucket=150 gallons
When is hurricane season?
June 1-Nov 30
Highest risk for NYC between Aug-Oct
Category 3 or higher considered MAJOR storm
When does requisition of supplies for Hurricane season commence?
March 1
Items not received by April 1 shall be called to attn of Div storm coordinator.
Review preparation plans for qtrs on April 1 also
Recon teams during storms consist of?
2-4 members inconspicuous to public
- Should Not engage in extrication/rescue operations
- Bunker Gear Should Not be worn in flooded areas
Depth of water to be crossed should not exceed?
18” for 1st line apparatus
50” for Hi Axle vehicles
Swift water is defined as?
Greater than 1.85 km/hr, 1 knot, slow walking pace
Operational duration of swift water search team?
12hrs
Water Rescue companies carry?
(1) 14’ flat bottom boat (140 lbs) w/o motor or oars
(1) set of wheels
(3) cold water suits
(9) waders
(15) PDFs
* **An Engine Co. will transport the boat
Where should still water rescue victim be removed to?
Water Rescue Co’s (Point of Entry)
-the assisting Engine will NOT enter the water. They will remain at the point of entry w/CFRD equip and assist victims removal from flat bottom boat
What is the PRIMARY means of communication for RRV Task Force?
DARS Radio
- 800 MHz can be used when DARS is (OOS)
- cell phones can be used when both DARS and 800 (OOS)
- Department radio can be utilized when an emergency exists and direct comm w/dispatch is necessary or other systems not operable
Codes for Manhole emergencies?
10-25
- w/o code =cond other than code 1-4
- code (1)=Extended to Bldg
- code (2)=1 or more covers blown or smoke under pressure
- code (3)=smoke seeping
- code (4)=Transformer, any location
- ***Utility Emergency crew dispatched for Code (1) or (4)
Who is notified if an odor of gas is noticed at a manhole?
Dispatch MUST be notified to have BOTH (gas) and (electric) crew respond
Area of a manhole should be taped off marking a danger zone for?
Both civilians and FD
**Members SHALL NOT attempt to move vehicles in danger area
When should a hose line be operated into a manhole?
When requested by Con Ed.
Use FOG nozzle and let water flow/pour into manhole, NO DIRECT stream into manhole
If ETA is more than 30 min for Emergency Crew response, Officer may?
- Have unit respond to alarms leaving one member behind
- Unit return to qtrs leaving one member behind
- Cone and tape off area
What is Iroquis Pipeline?
Single 24” high strength steel pipeline that interconnects w/ConEd, carrying Natural Gas under pressure.
Max operating pressure of 1,440 psig
Typical operating range between 400-1,100 psig
How many turns to shut off valve in hunts point (Iriquios pipeline) which is covered by flush mount valve box similar to Con Ed manhole cover?
213 Full turns
Special wrench stored inside entrance gate
Another at FDNY command post at 500 Food Center Drive
And R-3 carries a hydraulic wrench
When should Iriquois pipeline valve be shut?
Except when immediate threat to life or property, no valves should be opened or closed without approval of FD IC in consult with Con Ed
INITIAL action at Iriquios pipeline are?
Set perimeter and Eliminate ignition sources
If ignited consider shutting gas supply
What is PRIMARY consideration at Iriqouis pipeline?
Evacuation of Area involved
Avenues of escape MUST remain open for civilians and PD
Iriquois pipeline, how far for flag persons?
At least 1000’ on each side of leak, HT and flashlight equipped
When can Iriquios pipeline valves be operated for drill
Under NO circumstance shall valves be operated w/o consult of ConEd and Iriquios
-NEVER FULL closure during drills
Who shall perform patrol of pipeline to locate leak at Iriquios pipeline?
Squad or SSL
When are brush fires most common?
Spring and Fall
Weather is central factor affecting severity and incidence of Brush fires, what are main conditions that lead to brush fires?
Low humidity
Winds in excess of 15 mph
Little or no rain in preceding 3 or more days
Types of brush fires?
Surface=grass/weed/small trees/fast moving MOST COMMON
Bog=start at surface and burn down
Crown=Burn along tree tops, Rare in NYC
What should Initial attack operations at a brush fire be?
- Concentrate on MOBILITY, avoid hooking up to a hydrant except to protect exposures
- ONLY operate IFO fire to protect LIFE
- attack from flanks
- fire attack can begin once exposures are covered