ASTM C 1064, Temperature Flashcards

1
Q

When the nominal maximum size (NMS) of the coarse aggregate is greater than 3 inches, it may require up to_____ minutes for the transfer of heat between the aggregate and mortar.
A. 5
B. 10
C. 15
D. 20

A

20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A container used for the temperature test shall be large enough to provide at least _____ inch(es) or 3 times the NMS of the coarse aggregate as concrete cover in all directions around the sensing portion of the temperature measuring device.
A. 1
B. 1‐1/2
C. 2
D. 3

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A temperature measuring device shall have a capability of measuring the temperature of freshly mixed concrete in the range of
A. 60 to 80 F.
B. 30 to 120 F.
C. 0 to 120 F.
D. 30 to 80 F.

A

30 to 120 F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The temperature measuring device shall have a capability of measuring the temperature of freshly mixed concrete to _____ degree(s) F.
A. +/‐ 1
B. +/‐ 1.5
C. +/‐ 2
D. +/‐ 0.5

A

+/- 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature.
(T or F)

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Each temperature measuring device used for determining concrete temperature shall be verified _____ or whenever there is a question of accuracy.
A. once every six months
B. annually
C. prior to each use
D. when initially received

A

annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The temperature of freshly mixed concrete can be measured in
A. an adequately sized container.
B. transportation equipment.
C. forms.
D. all of the above.

A

all of the above
A: an adequately sized container
B: transportation equipment
C: forms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Submerge the sensing portion of the temperature measuring device a minimum of _____ inch(es) into the concrete.
A. 1
B. 1‐1/2
C. 2
D. 3

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Concrete is gently pressed up against the temperature measuring device to close the void created by inserting the TMD in the concrete and so that _____ does not affect the temperature reading.
A. bleed water
B. ambient (outside) air temperature
C. the sun
D. the wind

A

ambient (outside) air temperature

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Leave the temperature measuring device in the concrete for at least _____ minute(s) before taking a reading.
A. 1
B. 2
C. 3
D. 4

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Assuming the coarse aggregate size is less than 3 inches, read the temperature of the concrete within _____minutes
A. 2
B. 3
C. 4
D. 5

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The temperature of freshly mixed concrete is read and recorded to the nearest _____ degree(s) F.
A. 0.5
B. 1
C. 2
D. 5

A

1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

A certificate, or report, that verifies the accuracy of the reference temperature measuring device shall be available for inspection in the laboratory.
(T or F)

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The reference temperature measuring device shall be readable to _____ degree(s) F.
A. +/‐ 0.5
B. +/‐ 1
C. +/‐ 2
D. +/‐ 5

A

+/- 0.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The temperature measuring device must remain the concrete while a temperature reading is taken.
(T or F)

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The measured temperature represents the temperature at the time of testing and may not be an indication of the temperature at a later time.
(T or F)

A

True