ARE 5.0: PjM_1_Resource Management Flashcards
Name four criteria typically considered when assembling a project team.
The member criteria for this type of team are:
- experience
- availability
- billing rate
- personality
What is the primary criterion for consultant selection?
Past working relationship is the primary criterion. Other considerations are fee proposal and firm expertise for this.
Allocation of project resources within the office is dependent upon what?
Owner preferences for staff selection and the firm’s organizational structure are used to determine this.
What is the primary role of the project manager?
The role of this position is to coordinate all design and construction administration activities.
Who are the three participants, at minimum, that are involved in a construction project team?
The owner, the architect, and the consultant are included in this group.
What team member is added to the project team if
minimizing sound transmission is included in the scope of work?
An acoustical engineer is added to this group as a specialty consultant if this is included in the project.