.AR Admin Programs/Procedures: Welch's Highlighted Notes Flashcards
40DP-9OP15 Operator Challenges and Discrepancy Tracking:
- Operator Burden: An Operator Challenge that affects normal plant operations requiring operators to take contingency actions in order to prevent a plant transient.
- Operator Challenge: An equipment or program deficiency that provides an obstacle to safe plant operations by requiring operators to perform contingency actions, also, any activity or equipment or program deficiency that has a negative impact on reactivity control equipment.
- Operator Work Around: Operator Challenge that affects transient plant operations requiring operators to perform contingency actions in order to comply with an EOP or AOP.
Discrepancies:
- Indicators, Instruments and MCR or RSP operated devices which do NOT perform their intended design function.
- Includes local instruments used to control the plant and perform STs.
- Tracked in the CRDL (Control Room Discrepancy Log)
- Identified with a RED sticker (dot) with the CRDL number
Annunciator Discrepancies / Jumper Tracking:
- Any MCR alarm that is lit due to a non-justifiable reason or that will remain lit for > 14 days either through corrective, predictive, or preventive maintenance
- Annunciators associated with long term equipment maintenance (> 14 days) should be evaluated for Jumper Installation.
- Jumpered alarm windows identified with ORANGE stick (dot)
- Common alarms for all 3 units should NOT be jumpered.
40DP-9OP15 Operator Challenges and Discrepancy Tracking:
- Operator Burden: An Operator Challenge that affects normal plant operations requiring operators to take contingency actions in order to prevent a plant transient.
- Operator Challenge: An equipment or program deficiency that provides an obstacle to safe plant operations by requiring operators to perform contingency actions, also, any activity or equipment or program deficiency that has a negative impact on reactivity control equipment.
- Operator Work Around: Operator Challenge that affects transient plant operations requiring operators to perform contingency actions in order to comply with an EOP or AOP.
Discrepancies:
- Indicators, Instruments and MCR or RSP operated devices which do NOT perform their intended design function.
- Includes local instruments used to control the plant and perform STs.
- Tracked in the CRDL (Control Room Discrepancy Log)
- Identified with a RED sticker (dot) with the CRDL number
Annunciator Discrepancies / Jumper Tracking:
- Any MCR alarm that is lit due to a non-justifiable reason or that will remain lit for > 14 days either through corrective, predictive, or preventive maintenance
- Annunciators associated with long term equipment maintenance (> 14 days) should be evaluated for Jumper Installation.
- Jumpered alarm windows identified with ORANGE stick (dot)
- Common alarms for all 3 units should NOT be jumpered.
40OP-9ZZ11 Mode Change Checklist:
- Mode or condition change performed within 24 hours of starting the mode change checklist.
- Checklist must also be completed.
- STA and SM evaluate an extension if needed.
- Shift Manager can authorize extending this time.
- Entry into an Operational Mode/Specified Condition may be made in accordance with Action Requirements when conformance to the Action Requirements permits continued operation of the Unit for an unlimited period of time. (LCO 3.0.4.a)
- If not unlimited time, change can only be made if LCO 3.0.4.b or 3.0.4.c are applied. (not addressed by this procedure, only ODP-7 and Tech Specs)
RTBs closed & CEAs capable of withdrawal
- RPS operable
- Hi Log and Low SG Pressure trip operable
- SDM met (72ST-9RX14)
Checklists:
- Core Offload to Mode 6 entry
- Mode 6 To Mode 5
- Mode 5 To Mode 4
- Raising Pressure ≥ 385 psia (CSP & PZR/head vents applicability)
- Mode 4 To Mode 3
- Raising Pressure ≥ 1837 psia
- Mode 3 To Mode 2
- Mode 2 To Mode 1
- Raising power in Mode 1 > 15% Power (chemistry & I&C only, not a tech spec mode change)
- Raising power in Mode 1 > 20% Power
- Mode 5 to Mode 6
- Closing Reactor Trip Breakers
- Irradiated Fuel Movement
40OP-9ZZ11 Mode Change Checklist:
- Mode or condition change performed within 24 hours of starting the mode change checklist.
- Checklist must also be completed.
- STA and SM evaluate an extension if needed.
- Shift Manager can authorize extending this time.
- Entry into an Operational Mode/Specified Condition may be made in accordance with Action Requirements when conformance to the Action Requirements permits continued operation of the Unit for an unlimited period of time. (LCO 3.0.4.a)
- If not unlimited time, change can only be made if LCO 3.0.4.b or 3.0.4.c are applied. (not addressed by this procedure, only ODP-7 and Tech Specs)
RTBs closed & CEAs capable of withdrawal
- RPS operable
- Hi Log and Low SG Pressure trip operable
- SDM met (72ST-9RX14)
Checklists:
- Core Offload to Mode 6 entry
- Mode 6 To Mode 5
- Mode 5 To Mode 4
- Raising Pressure ≥ 385 psia (CSP & PZR/head vents applicability)
- Mode 4 To Mode 3
- Raising Pressure ≥ 1837 psia
- Mode 3 To Mode 2
- Mode 2 To Mode 1
- Raising power in Mode 1 > 15% Power (chemistry & I&C only, not a tech spec mode change)
- Raising power in Mode 1 > 20% Power
- Mode 5 to Mode 6
- Closing Reactor Trip Breakers
- Irradiated Fuel Movement
40DP-9OP05 Control Room Data Sheet Instructions:
Contains various logs for the MCR
- Mode STs: Started by 0800 (2000) and completed / reviewed by 1100 (2300)
- Daily STs performed on night shift need to be completed and acceptance reviewed from 1900 to 2300.
Rated Thermal Power (RTP):
- Maintain ≤ 100% using COLSS hourly secondary calorimetric (JSCALORH).
- Monitor hourly and 12 hour average
- If hourly JSCALORH is > 100%
- Reduce power within 1 hour
- Monitor 10 min average until hourly is ≤ 100%
- If 12 hour average is > 100%
- Immediately reduce power
- Write a CR
- JSCALOR is not an accurate measure of instantaneous Reactor Power and will not be used to maintain licensed power limit.
- NKBDELT will be initialized to match JSCALOR prior to the start of High Rate SGBD flow and will be used.
- Use of NKBDELT is limited to 4 hours when Reactor Power is > 96.6%. (Only place 4 hours is listed is with high rate SGBD???)
- If JSCALOR is not available, use NKBDELTC
- Power level can be maintained at the current NKBDELTC value for 12 hour max.
- Monitor NKBDELTC every 10 minutes
- If power is lowered OR JSCALOR not restored in 12 hours: maintain or reduce power to < 96.6%
Power Dependent Insertion Limits (PDIL log):
- Use when going below PDIL to ensure compliance with LCO 3.1.7 / 3.1.8 Insertion Limits
40DP-9OP05 Control Room Data Sheet Instructions:
Contains various logs for the MCR
- Mode STs: Started by 0800 (2000) and completed / reviewed by 1100 (2300)
- Daily STs performed on night shift need to be completed and acceptance reviewed from 1900 to 2300.
Rated Thermal Power (RTP):
- Maintain ≤ 100% using COLSS hourly secondary calorimetric (JSCALORH).
- Monitor hourly and 12 hour average
- If hourly JSCALORH is > 100%
- Reduce power within 1 hour
- Monitor 10 min average until hourly is ≤ 100%
- If 12 hour average is > 100%
- Immediately reduce power
- Write a CR
- JSCALOR is not an accurate measure of instantaneous Reactor Power and will not be used to maintain licensed power limit.
- NKBDELT will be initialized to match JSCALOR prior to the start of High Rate SGBD flow and will be used.
- Use of NKBDELT is limited to 4 hours when Reactor Power is > 96.6%. (Only place 4 hours is listed is with high rate SGBD???)
- If JSCALOR is not available, use NKBDELTC
- Power level can be maintained at the current NKBDELTC value for 12 hour max.
- Monitor NKBDELTC every 10 minutes
- If power is lowered OR JSCALOR not restored in 12 hours: maintain or reduce power to < 96.6%
Power Dependent Insertion Limits (PDIL log):
- Use when going below PDIL to ensure compliance with LCO 3.1.7 / 3.1.8 Insertion Limits
40DP-9OP22 Operations Logkeeping:
Precise time required for:
- Entering or exiting Tech Specs
- Notifications
- Entering time limiting chemistry actions levels
- Accidents involving personnel or equipment
Area Operator Rounds:
- If Auto Tour is unavailable, 500 sets of rounds can be stored on the hand held and uploaded later.
- Use paper copy if electronic is unavailable.
- Make log entry if rounds completed late
- CRS notified if a reading is skipped
- SM approval required if reading skipped twice.
Late Entries:
- Significant Actions or events that are not logged in chronological sequence must be logged as a late entry.
- The correct completion time of the action or event should be recorded in the log entry. Check “late entry.”
- Late entries that correct/modify an earlier log entry shall be logged using the same date and time as the entry being corrected/modified.
40DP-9OP22 Operations Logkeeping:
Precise time required for:
- Entering or exiting Tech Specs
- Notifications
- Entering time limiting chemistry actions levels
- Accidents involving personnel or equipment
Area Operator Rounds:
- If Auto Tour is unavailable, 500 sets of rounds can be stored on the hand held and uploaded later.
- Use paper copy if electronic is unavailable.
- Make log entry if rounds completed late
- CRS notified if a reading is skipped
- SM approval required if reading skipped twice.
Late Entries:
- Significant Actions or events that are not logged in chronological sequence must be logged as a late entry.
- The correct completion time of the action or event should be recorded in the log entry. Check “late entry.”
- Late entries that correct/modify an earlier log entry shall be logged using the same date and time as the entry being corrected/modified.
40DP-9OP22 Operations Logkeeping:
Log entry responsibilities:
U1 SM:
- Medical restrictions for licensed operators.
SM / CRS:
- Protected equipment scheme / work
- LCO entry/exits and Required Action completion
- Cask loading
- Major equipment status changes
- Maintenance rule SSC functional status
- Tests that make an SSC inoperable
- TDs that affect SSCs
- Risk assessments (if WCSRO not available)
- RMAL assessments
- Entry/exit into RED RMALs
- Fire protection TR entry/exits
- Major system and equipment testing
- Unexpected alarms where cause is not determined
- Incapacitation of Licensed individuals
- Personnel injuries requiring off-site medical attention
- E-Plan (evaluations/implementation)
- Operability Determinations
- Notifications to government agencies, or VP or above
- Significant changes in radiological conditions.
- Chemistry Action Levels which adversely impact generation.
- Major transients or critical evolutions
- Mode changes
40DP-9OP22 Operations Logkeeping:
Log entry responsibilities:
U1 SM:
- Medical restrictions for licensed operators.
SM / CRS:
- Protected equipment scheme / work
- LCO entry/exits and Required Action completion
- Cask loading
- Major equipment status changes
- Maintenance rule SSC functional status
- Tests that make an SSC inoperable
- TDs that affect SSCs
- Risk assessments (if WCSRO not available)
- RMAL assessments
- Entry/exit into RED RMALs
- Fire protection TR entry/exits
- Major system and equipment testing
- Unexpected alarms where cause is not determined
- Incapacitation of Licensed individuals
- Personnel injuries requiring off-site medical attention
- E-Plan (evaluations/implementation)
- Operability Determinations
- Notifications to government agencies, or VP or above
- Significant changes in radiological conditions.
- Chemistry Action Levels which adversely impact generation.
- Major transients or critical evolutions
- Mode changes
40DP-9OP22 Operations Logkeeping:
Log entry responsibilities:
ROs
- Start/stop of ≥ 10% power changes
- Status changes / reason of operating equipment
- Significant equipment malfunctions, actuations, or other abnormal occurrences, unless previously logged and identified by an active corrective action document.
- Installation/removal of T-mods.
- ECC Directives and any reason we cannot comply.
- Local operation of equipment that is normally operated from the MCR.
- Initiation and removal of all SESS manual inputs, stating why the input is required or removed (SM informed of all SESS panel changes).
- Procedures used to manipulate the plant.
AOs
- Abnormalities in alignment or alignment problems.
- Special valve lineups.
- Equipment failures or problems (list the CR# initiated).
- Significant changes to the radiological conditions pertinent to the specific watch station.
- Procedures used to manipulate the plant.
- “Skill of the craft” activities that result in a plant manipulation.
Radioactive releases
40DP-9OP22 Operations Logkeeping:
Log entry responsibilities:
ROs
- Start/stop of ≥ 10% power changes
- Status changes / reason of operating equipment
- Significant equipment malfunctions, actuations, or other abnormal occurrences, unless previously logged and identified by an active corrective action document.
- Installation/removal of T-mods.
- ECC Directives and any reason we cannot comply.
- Local operation of equipment that is normally operated from the MCR.
- Initiation and removal of all SESS manual inputs, stating why the input is required or removed (SM informed of all SESS panel changes).
- Procedures used to manipulate the plant.
AOs
- Abnormalities in alignment or alignment problems.
- Special valve lineups.
- Equipment failures or problems (list the CR# initiated).
- Significant changes to the radiological conditions pertinent to the specific watch station.
- Procedures used to manipulate the plant.
- “Skill of the craft” activities that result in a plant manipulation.
Radioactive releases
40DP-9OP33 Shift Turnover:
CRS prior to turnover:
- Unit logs (3 days or previous shift)
- Procedures in-progress
- RMS (GRID)
- SESS panels
- Night Orders
- Board walkdowns
- Turnover Checklist
- LCO Tracking Log / TSCCR
- Release permits
- Face to face turnover (work in-progress, testing, plant status, Plant Risk, LCO actions and planned work for the next shift)
CRS after turnover:
- Unit logs (7 days or previous shift)
- In-progress procedure book
- Clearance report
- T-mod log
- Auto Log turnover comments
- Daily status report
- Scheduled work
- Standing orders
40DP-9OP33 Shift Turnover:
CRS prior to turnover:
- Unit logs (3 days or previous shift)
- Procedures in-progress
- RMS (GRID)
- SESS panels
- Night Orders
- Board walkdowns
- Turnover Checklist
- LCO Tracking Log / TSCCR
- Release permits
- Face to face turnover (work in-progress, testing, plant status, Plant Risk, LCO actions and planned work for the next shift)
CRS after turnover:
- Unit logs (7 days or previous shift)
- In-progress procedure book
- Clearance report
- T-mod log
- Auto Log turnover comments
- Daily status report
- Scheduled work
- Standing orders
40DP-9OP33 Shift Turnover:
RO prior to turnover:
- Unit logs (3 days or previous shift)
- Procedures in-progress
- RMS (GRID)
- SESS panels
- Night Orders
- Board walkdowns
- Turnover Checklist
- Face to face turnover (procedures, work in-progress, testing, and plant status)
RO after turnover:
- LCO Tracking Log / TSCCR
- Release permits
- CCIs
- Unit logs (7 days or previous shift)
- Auto Log turnover comments
- Alarm status check
- T-mod log
Standing orders
40DP-9OP33 Shift Turnover:
RO prior to turnover:
- Unit logs (3 days or previous shift)
- Procedures in-progress
- RMS (GRID)
- SESS panels
- Night Orders
- Board walkdowns
- Turnover Checklist
- Face to face turnover (procedures, work in-progress, testing, and plant status)
RO after turnover:
- LCO Tracking Log / TSCCR
- Release permits
- CCIs
- Unit logs (7 days or previous shift)
- Auto Log turnover comments
- Alarm status check
- T-mod log
Standing orders
40DP-9OP33 Shift Turnover:
AOs prior to turnover:
- Unit Logs (3 days or previous shift)
- Night Orders
- Maintenance of Area Logs
- Procedures in-progress
- Completes Area Turnover Status Sheet (Cora)
- Face to face turnover (procedures, work in-progress, testing, and plant status)
All:
- Log reviews prior to turnover (to previous shift worked OR last 3 days, whichever is shorter)
- Log reviews after turnover (to previous shift worked OR last 7 days, whichever is shorter)
- RSRO and/or FHS shall report to the CRS/SM prior to manning the position.
Turnover documents that have changes that are tracked in the Unit Log are only required to be physically reviewed on the first day back following days off. On days following, a review of the Unit Log satisfies the requirement for these reviews. (T-Mods, clearance report, in-progress log, etc.)
40DP-9OP33 Shift Turnover:
AOs prior to turnover:
- Unit Logs (3 days or previous shift)
- Night Orders
- Maintenance of Area Logs
- Procedures in-progress
- Completes Area Turnover Status Sheet (Cora)
- Face to face turnover (procedures, work in-progress, testing, and plant status)
All:
- Log reviews prior to turnover (to previous shift worked OR last 3 days, whichever is shorter)
- Log reviews after turnover (to previous shift worked OR last 7 days, whichever is shorter)
- RSRO and/or FHS shall report to the CRS/SM prior to manning the position.
Turnover documents that have changes that are tracked in the Unit Log are only required to be physically reviewed on the first day back following days off. On days following, a review of the Unit Log satisfies the requirement for these reviews. (T-Mods, clearance report, in-progress log, etc.)
40DP-9AP21 Protected Equipment:
- On-line (Mode 1/2): maintain safety functions, prevent inadvertent plant trips, transients, reduced operating margin, or inadvertent LCO 3.0.3 entry.
- Shutdown: maintains shutdown risk / DID for key safety functions
Shift Manager:
- Final authority for protected equipment
- Authorizes all access to Protected Equipment
- Authorizes changes to and removal of protected equipment
- Pre-approves any non-routine activities in the area of, or near, Protected Equipment
- Unit 1 SM: requests SWYD protection through the Switchyard Coordinator during normal working hours and from SRP Power Dispatching Office (SRP PDO) through the ECC link during off-normal hours.
- Unit 1 SM: assigns an AO to post SWYD gate signage for Protected Equipment notification during off-normal hour Protected Equipment requests, after notification to PDO through the ECC link.
CRS:
- Controls access to Protected Equipment in the absence of the SM. (Still requires SM permission for non-emergencies)
- May allow access in emergencies.
40DP-9AP21 Protected Equipment:
- On-line (Mode 1/2): maintain safety functions, prevent inadvertent plant trips, transients, reduced operating margin, or inadvertent LCO 3.0.3 entry.
- Shutdown: maintains shutdown risk / DID for key safety functions
Shift Manager:
- Final authority for protected equipment
- Authorizes all access to Protected Equipment
- Authorizes changes to and removal of protected equipment
- Pre-approves any non-routine activities in the area of, or near, Protected Equipment
- Unit 1 SM: requests SWYD protection through the Switchyard Coordinator during normal working hours and from SRP Power Dispatching Office (SRP PDO) through the ECC link during off-normal hours.
- Unit 1 SM: assigns an AO to post SWYD gate signage for Protected Equipment notification during off-normal hour Protected Equipment requests, after notification to PDO through the ECC link.
CRS:
- Controls access to Protected Equipment in the absence of the SM. (Still requires SM permission for non-emergencies)
- May allow access in emergencies.
40DP-9AP21 Protected Equipment:
On Line Protected Equipment:
- Posting NOT required for short duration equipment unavailability (ST during the current shift)
- Emergent conditions: hang protection within 4 hours
- Planned maintenance: hang protection prior to removing from service
- If one train of SFP Cooling is OOS OR if the time to reach 200°F in the SFP is < 72 hours: protect operating SFP cooling.
- Any EDG or SBOG OOS: protect remaining EDGs / SBOGs
40DP-9AP21 Protected Equipment:
On Line Protected Equipment:
- Posting NOT required for short duration equipment unavailability (ST during the current shift)
- Emergent conditions: hang protection within 4 hours
- Planned maintenance: hang protection prior to removing from service
- If one train of SFP Cooling is OOS OR if the time to reach 200°F in the SFP is < 72 hours: protect operating SFP cooling.
- Any EDG or SBOG OOS: protect remaining EDGs / SBOGs
40DP-9AP21 Protected Equipment:
Shutdown Protected Equipment
- STA performs Shutdown Safety Function Assessment and gives to the OCC
- Shutdown Risk Manager develops the protected equipment scheme / SM still approves it.
-
Safety Functions:
- Reactivity Control
- Maintenance of Vital Auxiliaries (electrical power)
- RCS/SFP Inventory Control and Heat Removal
- RCS Pressure Control
- Core Heat Removal
- Containment Isolation / Press Control / Temperature Control / Combustible Gas Control
- Hang protection if:
- Significant degradation in SSC performance is indicated
- Redundant equipment unavailability or manipulation would result in an unplanned outage risk assessment change
- Outage risk for a key safety function results in an actual orange risk or higher
- Protect the following during outages:
-
One in-service DHR train and RCS inventory make-up train with fuel in the reactor vessel.
- May be secured prior to Mode 4 when both SI trains are operable / aligned, except for one pump on SDC.
- One SFP train during core off-load and on-load
- CTMT closure equipment if RCS is NOT intact and fuel is in CTMT and equipment hatch or airlocks are open
-
One in-service DHR train and RCS inventory make-up train with fuel in the reactor vessel.
40DP-9AP21 Protected Equipment:
Shutdown Protected Equipment
- STA performs Shutdown Safety Function Assessment and gives to the OCC
- Shutdown Risk Manager develops the protected equipment scheme / SM still approves it.
-
Safety Functions:
- Reactivity Control
- Maintenance of Vital Auxiliaries (electrical power)
- RCS/SFP Inventory Control and Heat Removal
- RCS Pressure Control
- Core Heat Removal
- Containment Isolation / Press Control / Temperature Control / Combustible Gas Control
- Hang protection if:
- Significant degradation in SSC performance is indicated
- Redundant equipment unavailability or manipulation would result in an unplanned outage risk assessment change
- Outage risk for a key safety function results in an actual orange risk or higher
- Protect the following during outages:
-
One in-service DHR train and RCS inventory make-up train with fuel in the reactor vessel.
- May be secured prior to Mode 4 when both SI trains are operable / aligned, except for one pump on SDC.
- One SFP train during core off-load and on-load
- CTMT closure equipment if RCS is NOT intact and fuel is in CTMT and equipment hatch or airlocks are open
-
One in-service DHR train and RCS inventory make-up train with fuel in the reactor vessel.
40DP-9AP21 Protected Equipment:
General Requirements:
- Active Protected Equipment Schemes placed in the In-Progress Book
- Site Wide P/A required:
- Emergent condition result in a change to Protected Equipment
- Changes made to published Protected Equipment/Protected Equipment Schemes
Working On or Near (< 2 feet) Protected Equipment:
- Authorized / briefed by the SM
- Continuous work group supervisory oversite
- Routine tours/tasks are pre-approved (Ops, RP, Chemistry, Security, Fire Ops, SD Risk Manager, SRP)
40DP-9AP21 Protected Equipment:
General Requirements:
- Active Protected Equipment Schemes placed in the In-Progress Book
- Site Wide P/A required:
- Emergent condition result in a change to Protected Equipment
- Changes made to published Protected Equipment/Protected Equipment Schemes
Working On or Near (< 2 feet) Protected Equipment:
- Authorized / briefed by the SM
- Continuous work group supervisory oversite
- Routine tours/tasks are pre-approved (Ops, RP, Chemistry, Security, Fire Ops, SD Risk Manager, SRP)
73DP-9ZZ14 Surveillance Testing:
SM/CRS:
- Approves start or restart of tests prior to steps that impact plant equipment.
- Approval not required if plant equipment not affected, equipment removed from the plant, or routine chemistry ST with NO impact on reactivity or GRW alarms.
- Reviews In-service Testing (IST) STs of safety related pumps within 96 hours of the acceptance review being completed.
- Verifies all required ST(s)/retest(s) are completed prior to declaring a system/component operable following maintenance.
- Ensures all applicable STs are current prior to mode change.
STA:
- Assists the SM in reviewing ST as-found data that is out of tolerance, unsat test results, or problems that were identified during testing as part of the OD/FA for the identified condition.
73DP-9ZZ14 Surveillance Testing:
SM/CRS:
- Approves start or restart of tests prior to steps that impact plant equipment.
- Approval not required if plant equipment not affected, equipment removed from the plant, or routine chemistry ST with NO impact on reactivity or GRW alarms.
- Reviews In-service Testing (IST) STs of safety related pumps within 96 hours of the acceptance review being completed.
- Verifies all required ST(s)/retest(s) are completed prior to declaring a system/component operable following maintenance.
- Ensures all applicable STs are current prior to mode change.
STA:
- Assists the SM in reviewing ST as-found data that is out of tolerance, unsat test results, or problems that were identified during testing as part of the OD/FA for the identified condition.
73DP-9ZZ14 Surveillance Testing:
ST Reviews:
-
Acceptance Reviewer (qualified to perform the ST):
- Checks technical and administrative accuracy
- Calculations verified correct.
- Data verified within its acceptance criteria. Failed data is circled.
- Failed steps are identified. (Circle steps with no data entry).
- Applicable procedure steps, sign-offs and data spaces completed.
- Log entries are complete and accurate for the test performed.
- CRs written if required and recorded in ST.
- Checks pre-conditioning
-
Team Leader Review:
- CRS / SM for Operations STs
- CRS / SM reviews pump ISTs within 96 hours of acceptance review.
- Admin review and ensure SWMS updated
Pre-Conditioning:
- Alteration, variation, manipulation, or adjustment of the physical condition of an SSC before testing.
- NOT allowed when it changes the “as-found” condition of a component.
- Examples:
- Quarterly valve stroke after an annual valve lube PM is allowed.
- If it always occurred at same time, not allowed.
- Pump venting prior to pump STs is NOT allowed.
- System venting prior to flow testing of check valves is allowed since the pumps are not being tested.
- Quarterly valve stroke after an annual valve lube PM is allowed.
73DP-9ZZ14 Surveillance Testing:
ST Reviews:
-
Acceptance Reviewer (qualified to perform the ST):
- Checks technical and administrative accuracy
- Calculations verified correct.
- Data verified within its acceptance criteria. Failed data is circled.
- Failed steps are identified. (Circle steps with no data entry).
- Applicable procedure steps, sign-offs and data spaces completed.
- Log entries are complete and accurate for the test performed.
- CRs written if required and recorded in ST.
- Checks pre-conditioning
-
Team Leader Review:
- CRS / SM for Operations STs
- CRS / SM reviews pump ISTs within 96 hours of acceptance review.
- Admin review and ensure SWMS updated
Pre-Conditioning:
- Alteration, variation, manipulation, or adjustment of the physical condition of an SSC before testing.
- NOT allowed when it changes the “as-found” condition of a component.
- Examples:
- Quarterly valve stroke after an annual valve lube PM is allowed.
- If it always occurred at same time, not allowed.
- Pump venting prior to pump STs is NOT allowed.
- System venting prior to flow testing of check valves is allowed since the pumps are not being tested.
- Quarterly valve stroke after an annual valve lube PM is allowed.