ALPHABET OF PORT MANAGEMENT Flashcards
Science and art of applying the different processes of planning, organizing directing and
controlling to the basic resources such as men, machine, materials and method in order
to produce products or to provide services for the benefits of mankind
Management
More popularly known as ETA or Expected Time of Arrival.
Arrival
is usually with the representatives of the shipping lines, arrestee
and stevedoring contractors, the Harbor Master, a member of the Planning Office and the
representative of the operation including the Maintenance and the equipment division.
Berthing Meeting
These are the colony of the Receival Programs, all of which have
to be prepared to property service both imports and export.
Delivery Programs
Knowing the volume and tonnage of cargoes carried by vessel, provision
can be made for adequate equipment to be allocated so as to ensure the smooth
discharging cargoes and the loading of exports.
Equipment
The time of the ______ for working a vessel must be properly timeframed no to
go beyond the time of departure of the vessel. The Estimated Time of Finish computation
must include both loading and unloading of the cargoes.
Finish
Implied here is manpower allocation. The number and the compositions will
depend on the volume and tonnage of cargoes be unloaded. Labor productivity rate is
the vital concern.
Gangs
Is actually stevedoring work. Gangs are assigned lashing and
unlashing, shoring shifting and even palletizing of cargoes inside the hatches. A smooth
hatch operation enhances a smooth discharging operation. The ship’s productivity rate is
also another vital concern
Hatch Operation
Is the port such as physical plants, transit sheds, warehouse, offices
spaces, container yards freight station, ready-line equipment, operational areas, properly
dredged berths, clear and safe approaches and facility for workers such a bathroom and
comfort rooms on the quay must be undertaken if the port is to manage effectively and
efficiently.
Infrastructure
This kind or types of cargoes and their classification is necessary in
order to make the necessary provision for their handling transfer, storage and delivery.
Kind of Cargoes
A systematic location must be evolved to make the delivery
operations more productive. This will also help the clients to readily trace the where about
of their importations. In this case containers, location of the same is easy because
container operation are readily computerized
Location System
Makes unloading and loading operation more productive. In unloading
operation, especially if the shipper/ transtainer system is used, a marshaling yard is a
necessity
Marshalling
A port is a _____ of in the International network serving trade and commerce. A
port is a _____ that serves an entry point for materials, whether finished or raw, needed
by a nation and its people, but which are not produced locally and at the same time
Node
Overall operation have four major phases: Receiving of Cargoes; Transfer
Cargoes; Storage of Cargoes and Delivery of Cargoes. This is for imports in export, we
have the receiving of cargoes at the gate; the storage of cargoes at the sheds or even at
the leased areas of shipping companies within the port; transfer to the marshaling yard
or the loading area; and then the actual loading in board the vessel.
Operation
The Port Manager must see to it that the productivity rate not be
lower than 14 metric tons per gross gang hour in the case of conventional gang cargoes
and less than 22TEU per gross gang hour containerized cargo.
Productivity Rate