All PMP Terms Flashcards

1
Q

A Guide to the Project Management Body of Knowledge (PMBOK Guide)

A

The PMI publication that defines widely accepted project management practices. The CAPM and the PMP exam are based on this book.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Application Areas

A

The areas of expertise, industry, or function where a project is centered. Examples of application areas include architecture, IT, health care, and manufacturing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Business Value

A

A quantifiable return on investment. The return can be tangible, such as equipment, money, or market share. The return can also be intangible, such as brand recognition, trademarks, and reputation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Certified Associate In Project Management (CAPM)

A

A person who has slightly less project management experience than a PMP, but who has qualified for and then passed the examination to be an associate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Cultural And Social Environment

A

Defines how a project affects people and how those people may affect the project. This includes the economic, educational, ethical, religious, demographic, and ethnic composition of the people affected by the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Deliverable

A

A product, service, or result created by a project. Projects can have multiple.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

General Management Skills

A

These include the application of accounting, procurement, sales and marketing, contracting, manufacturing, logistics, strategic planning, human resource management, standards and regulations, and information technology.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

International And Political Environment

A

The consideration of the local and international laws, languages, communication challenges, time zone differences, and other non-collocated issues that affect a project’s ability to progress.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Interpersonal Skills

A

The ability to interact, lead, motivate, and manage people.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Iron Triangle Of Project Management

A

A triangle with the characteristics of time, cost, and scope. Time, cost, and scope each constitute one side of the triangle; if any side is not in balance with the other sides, the project will suffer. This is also known as the Triple Constraints of Project Management, as all projects are constrained by time, cost, and scope.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Physical Environment

A

The physical structure and surroundings that affect a project’s work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Process Groups

A

A collection of related processes in project management. There are five process groups and 49 project management processes. The five process groups are Initiating, Planning, Executing, Monitoring and Controlling, and Closing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Program

A

A collection of related projects working in unison toward a common deliverable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Progressive Elaboration

A

The process of gathering project details. This process uses deductive reasoning, logic, and a series of information- gathering techniques to identify details about a project, product, or solution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Project

A

A temporary endeavor to create a unique product, service, or result. The end result of a project is also called a deliverable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Project Benefits Management Plan

A

A documented created and maintained by the project sponsor and the project manager. The project benefits management plan defines what benefits the project will create, when the benefits will be realized, and how the benefits will be measured.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Project Business Case

A

Created and maintained by the project sponsor and shows the financial validity of why a project is chartered and launched within the organization. Typically, the project business case is created before the launch of the project and may be used as a go/no-go decision point.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Project Environment

A

The location and culture of the environment where the project work will reside. This includes the social, economic, and environmental variables the project must work with or around.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Project Management Institute (PMI)

A

An organization of project management professionals from around the world, supporting and promoting the careers, values, and concerns of project managers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Project Life Cycle

A

The phases that make up the project. These are unique to the type of work being performed and are not universal to all projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Project Management Office (PMO)

A

A central office that oversees all projects within an organization or within a functional department. Supports the project manager through software, training, templates, policies, communication, dispute resolution, and other services.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Project Management Professional (PMP)

A

A person who has proven project management experience and has qualified for and then passed the PMP examination.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Project Portfolio Management

A

The management and selection of projects that support an organization’s vision and mission. It is the balance of project priority, risk, reward, and return on investment. This is a senior management process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Subprojects

A

A smaller project managed within a larger, parent project. These are often contracted work whose deliverable allows the larger project to progress.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Triple Constraints Of Project Management

A

Also known as the Iron Triangle. This theory posits that time, cost, and scope are three constraints that every project has.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Work Performance Data

A

Raw data, observations, and measurements about project components. This data is gathered and stored in the project management information system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Work Performance Information

A

The processed and analyzed data that will help the project manager make project decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Work Performance Reports

A

The formatted communication of work performance information. Work performance reports communicate what’s happening in the project through status reports, memos, dashboards, or other modalities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Balanced Matrix Structure

A

An organization where organizational resources are pooled into one project team, but the functional managers and the project managers share the project power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

Cultural Norms

A

The culture and the styles of an organization. ____ such as work ethics, hours, view of authority, and shared values, can affect how the project is managed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

Enterprise Environmental Factors

A

Conditions that affect how the project manager may manage the project. Enterprise environmental factors come from within the project, such as policy, or they be external to the organization, such as law or regulation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

Functional Structure

A

An organization that is divided into functions, and each employee has one clear functional manager. Each department acts independently of the other departments. A project manager in this structure has little to no power and may be called a project coordinator.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Governance Framework

A

Describes the rules, policies, and procedures that people within an organization abide by. Also addresses the organization, but also address portfolios, programs, and projects. Regarding portfolios, programs, and projects the governance framework addresses alignment with organizational vision, risk management, performance factors, and communication.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

Hybrid Structure

A

An organization that creates a blend of the functional, matrix, and project- oriented structures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

Multidivisional Structure

A

Describe organizations that have duplication of efforts within the organization, but not within each department or division of the organization. Project manager has little authority in this structure and the functional manager controls the project budget.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

Organic Or Simple

A

Describes a loosely organized business or organization. There likely aren’t big formal departments and people work alongside one another regardless of roles and titles. The project manager likely has little control over the project resources and may not be called a project manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

Organizational Process Assets

A

Includes organizational processes, policies, procedures, and items from a corporate knowledge base. These are grouped into two categories to consider: processes, policies and procedures, and organizational knowledge bases.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

Organizational Knowledge Repositories

A

The databases, files, and historical information that you can use to help better plan and manage your projects. This is an organizational process asset that is created internally to your organization through the ongoing work of operations and other projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

Organizational System

A

A system can create things by working with multiple components that the individual components could not create if they worked alone. The structure of the organization and the governance framework creates constraints that affect how the project manager makes decisions within the project. The organizational system directly affects how the project manager utilizes their power, influence, leadership, and even political capital, to get things done in the environment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

Project Management Office (PMO)

A

A business unit that centralizes the operations and procedures of all projects within the organization. Can be supportive, controlling, or directive.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Project-Oriented Structure

A

An organization that assigns a project team to one project for the duration of the project life cycle. The project manager has high-to-almost-complete project power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

Strong Matrix Structure

A

An organization where organizational resources are pooled into one project team, but the functional managers have less project power than the project manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

Virtual Organization

A

Uses a network structure to communicate and interact with other groups and departments. A point of contact exists for each department and these department point of contact receive and send all messages for the department.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

Weak Matrix Structure

A

An organization where organizational resources are pooled into one project team, but the functional managers have more project power than the project manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

Active Listening

A

The message receiver restates what’s been said to fully understand and confirm the message and it provides an opportunity for the sender to clarify the message if needed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
46
Q

Active Problem Solving

A

Begins with problem definition. Problem definition is the ability to discern between the cause and effect of the problem. Root-cause analysis looks beyond the immediate symptoms to the cause of the symptoms—which then affords opportunities for solutions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
47
Q

Avoiding Power

A

The project manager refuses to act, get involved, or make decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
48
Q

Charismatic Leadership

A

The leader is motivating, has high- energy, and inspires the team through strong convictions about what’s possible and what the team can achieve. Positive thinking and a can-do mentality are characteristics of a charismatic leader.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
49
Q

Expert Power

A

The project manager has deep skills and experience in a discipline (for example, years of working in IT helps an IT project manager better manage IT projects).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
50
Q

Ingratiating Power

A

The project manager aims to gain favor with the project team and stakeholders through flattery.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
51
Q

Informational Power

A

The individual has power and control of the data gathering and distribution of information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
52
Q

Interactional Leadership

A

The leader is a hybrid of transactional, transformational, and charismatic leaders. The interactional leader wants the team to act, is excited and inspired about the project work, yet still holds the team accountable for their results.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
53
Q

Guilt-Based Power

A

The project manager can make the team and stakeholders feel guilty to gain compliance in the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
54
Q

Leadership

A

This is about aligning, motivating, and inspiring the project team members to do the right thing, build trust, think creatively, and to challenge the status quo.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
55
Q

Laissez-Faire Leadership

A

The leader takes a “hands-off” approach to the project. This means the project team makes decisions, takes initiative in the actions, and creates goals. While this approach can provide autonomy, it can make the leader appear absent when it comes to project decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
56
Q

Management

A

Management utilizes positional power to maintain, administrate, control, and focus on getting things done without challenging the status quo of the project and organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
57
Q

Media Selection

A

Based on the audience and the message being sent, the media should be in alignment with the message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
58
Q

Meeting Management

A

Meetings are forms of communication. How the meeting is led, managed, and controlled all influence the message being delivered. Agendas, minutes, and order are mandatory for effective communications within a meeting.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
59
Q

Personal Or Charismatic Power

A

The project manager has a warm personality that others like.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
60
Q

Presentation

A

In formal presentations, the presenter’s oral and body language, visual aids, and handouts all influence the message being delivered.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
61
Q

Pressure-Based Power

A

The project manager can restrict choices to get the project team to perform and do the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
62
Q

Pmi Talent Triangle

A

Defines three areas of PDUs for PMI certified professionals to maintain their certification. The PMI Talent Triangle includes technical project management, leadership, and strategic and business management.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
63
Q

Positional Power

A

The project manager’s power is because of the position she has as the project manager. This is also known as formal, authoritative, and legitimate power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
64
Q

Professional Development Units (Pdus)

A

PDUs are earned after the PMP to maintain the PMP certification. PMPs are required to earn 60 PDUs per three-year certification cycle. Of the 60 PDUs, a minimum of 35 hours must come from educational opportunities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
65
Q

Project Manager

A

The role of leading the project team and managing the project resources to effectively achieve the objectives of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
66
Q

Punitive Or Coercive Power

A

The project manager can punish the project team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
67
Q

Referent Power

A

The project manager is respected or admired because of the team’s past experiences with the project manager. This is about the project manager’s credibility in the organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
68
Q

Reward Power

A

The project manager can reward the project team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
69
Q

Sender-Receiver Models

A

Communication requires a sender and a receiver. Within this model may be multiple avenues to complete the flow of communication, but barriers to effective communication may be present as well.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
70
Q

Servant Leadership

A

The leader puts others first and focuses on the needs of the people he serves. Servant leaders provide opportunity for growth, education, autonomy within the project, and the well-being of others. The primary focus of servant leadership is service to others.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
71
Q

Situational Power

A

The project manager has power because of certain situations in the organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
72
Q

Style

A

The tone, structure, and formality of the message being sent should be in alignment with the audience and the content of the message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
73
Q

Transactional Leadership

A

The leader emphasizes the goals of the project and rewards and disincentives for the project team. This is sometimes called management by exception as it’s the exception that is reward or punished.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
74
Q

Transformational Leadership

A

The leader inspires and motivates the project team to achieve the project goals. Transformational leaders aim to empower the project team to act, be innovative in the project work, and accomplish through ambition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
75
Q

Assumption Log

A

An assumption is something that is believed to be true or false, but it has not yet been proven to be true or false. Assumptions that prove wrong can become risks for the project. All identified project assumptions are recorded in the assumption log for testing and analysis, and the outcomes are recorded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
76
Q

Benefit/Cost Ratio (Bcr) Models

A

This is an example of a benefits comparison model. It examines the benefit-to-cost ratio.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
77
Q

Change Control Board (Ccb)

A

A committee that evaluates the worthiness of a proposed change and either approves or rejects the proposed change.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
78
Q

Change Control System (Ccs)

A

The change control system communicates the process for controlling changes to the project deliverables. This system works with the configuration management system and seeks to control and document proposals to change the project’s product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
79
Q

Change Log

A

All changes that enter into a project are recorded in the change log. The characteristics of the change, such as the time, cost, risk, and scope details, are also recorded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
80
Q

Change Management Plan

A

This plan details the project procedures for entertaining change requests: how change requests are managed, documented, approved, or declined.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
81
Q

Closure Processes

A

This final process group of the project management life cycle is responsible for closing the project phase or project. This is where project documentation is archived and project contracts are also closed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
82
Q

Communications Management Plan

A

This plan defines who will get what information, how they will receive it, and in what modality the communication will take place.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
83
Q

Configuration Identification

A

This includes the labeling of the components, how changes are made to the product, and the accountability of the changes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
84
Q

Configuration Management Plan

A

This plan is an input to the control scope process. It defines how changes to the features and functions of the project deliverable, the product scope, may enter the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
85
Q

Configuration Management System

A

This system defines how stakeholders are allowed to submit change requests, the conditions for approving a change request, and how approved change requests are validated in the project scope. Configuration management also documents the characteristics and functions of the project’s products and any changes to a product’s characteristics.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
86
Q

Configuration Status Accounting

A

The organization of the product materials, details, and prior product documentation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
87
Q

Configuration Verification And Auditing

A

The scope verification and completeness auditing of project or phase deliverables to ensure that they are in alignment with the project plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
88
Q

Contract Closure

A

The formal verification of the contract completeness by the vendor and the performing organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
89
Q

Cost Baseline

A

This is the aggregated costs of all of the work packages within the work breakdown structure (WBS).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
90
Q

Cost Management Plan

A

This plan details how the project costs will be planned for, estimated, budgeted, and then monitored and controlled.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
91
Q

Explicit Knowledge

A

Knowledge that can be quickly and easily expressed through conversations, documentation, figures, or numbers, is easily communicated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
92
Q

Future Value

A

A benefit comparison model to determine a future value of money. The formula to calculate future value is FV = PV(1 + I)n, where PV is present value, I is the given interest rate, and n is the number of periods.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
93
Q

Integrated Change Control

A

A process to consider and control the impact of a proposed change on the project’s knowledge areas.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
94
Q

Issue Log

A

Issues are points of contention where some question of the project’s direction needs to be resolved. All identified issues are documented in the issue log, along with an issue owner and a deadline to resolve the issue. The outcome of the issue is also recorded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
95
Q

Mathematical Model

A

A project selection method to determine the likelihood of success. These models include linear programming, nonlinear programming, dynamic programming, integer programming, and multiobjective programming.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
96
Q

Milestone

A

Milestones are significant points or events in the project’s progress that represent accomplishment in the project. Projects usually create milestones as the result of completing phases within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
97
Q

Milestone List

A

This list details the project milestones and their attributes. It is used for several areas of project planning, but also helps determine how quickly the project may be achieving its objectives.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
98
Q

Murder Boards

A

These are committees that ask every conceivable negative question about the proposed project. Their goals are to expose the project’s strengths and weaknesses, and to kill the project if it’s deemed unworthy for the organization to commit to. Also known as project steering committees or project selection committees.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
99
Q

Net Present Value

A

Evaluates the monies returned on a project for each period the project lasts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
100
Q

Payback Period

A

An estimate to predict how long it will take a project to pay back an organization for the project’s investment of capital.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
101
Q

Present Value

A

A benefit comparison model to determine the present value of a future amount of money. The formula to calculate present value is PV = FV ÷ (1 + i)n, where FV is future value, I is the given interest rate, and n is the number of periods.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
102
Q

Procurement Management Plan

A

The procurement management plan controls how the project will acquire goods and services.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
103
Q

Project Charter

A

This document authorizes the project. It defines the initial requirements of the project stakeholders. The project charter is endorsed by an entity outside of the project boundaries.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
104
Q

Project Management Plan

A

The documented approach of how a project will be planned, executed, monitored and controlled, and then closed. This document is a collection of subsidiary management plans and related documents.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
105
Q

Project Scope Management Plan

A

Defines how the project scope will be planned, managed, and controlled.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
106
Q

Quality Baseline

A

Documents the quality objectives for the project, including the metrics for stakeholder acceptance of the project deliverable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
107
Q

Quality Management Plan

A

This plan defines what quality means for the project, how the project will achieve quality, and how the project will map to organizational procedures pertaining to quality.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
108
Q

Regression Analysis

A

A mathematical model to examine the relationship among project variables, like cost, time, labor, and other project metrics.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
109
Q

Risk Management Plan

A

Risk is an uncertain event or condition that may affect the project outcome. The risk management plan defines how the project will manage risk.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
110
Q

Risk Register

A

The risk register is a centralized database consisting of the outcome of all the other risk management processes, such as the outcome of risk identification, qualitative analysis, and quantitative analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
111
Q

Risk Response Plan

A

This subsidiary plan defines the risk responses that are to be used in the project for both positive and negative risks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
112
Q

Schedule Baseline

A

This is the planned start and finish of the project. The comparison of what was planned and what was experienced is the schedule variance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
113
Q

Schedule Management Plan

A

Defines how the project schedule will be created and managed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
114
Q

Scope Baseline

A

The scope baseline is a combination of three project documents: the project scope statement, the work breakdown structure, and the WBS dictionary. The creation of the project deliverable will be measured against the scope baseline to show any variances from what was expected and what the project team has created.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
115
Q

Scoring Models

A

These models use a common set of values for all of the projects up for selection. For example, values can be profitability, complexity, customer demand, and so on.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
116
Q

Tacit Knowledge

A

Knowledge that’s more difficult to express because it’s personal beliefs, values, knowledge gain from experience, and “know-how” when doing a task.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
117
Q

8/80 Rule

A

A planning heuristic for creating the WBS. This rule states that the work package in a WBS must take no more than 80 hours of labor to create and no fewer than 8 hours of labor to create.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
118
Q

Active Observation

A

The observer interacts with the worker to ask questions and understand each step of the work being completed. In some instances, the observer could serve as an assistant in doing the work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
119
Q

Affinity Diagrams

A

When stakeholders create a large number of ideas, you can use an affinity diagram to cluster similar ideas together for further analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
120
Q

Alternatives Generation

A

A scope definition process of finding alternative solutions for the project customer while considering the customer’s satisfaction, the cost of the solution, and how the customer may use the product in operations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
121
Q

Autocratic

A

A decision method where only one individual makes the decision for the group.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
122
Q

Brainstorming

A

This approach encourages participants to generate as many ideas as possible about the project requirements. No idea is judged or dismissed during the brainstorming session.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
123
Q

Change Control System (Ccs)

A

Documented in the scope management plan, this system defines how changes to the project scope are managed and controlled.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
124
Q

Change Management Plan

A

This subsidiary plan defines how changes will be allowed and managed within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
125
Q

Code Of Accounts

A

A numbering system for each item in the WBS. The PMBOK is a good example of a code of accounts, as each chapter and its subheadings follow a logical numbering scheme. For example, PMBOK 5.3.3.2 identifies an exact paragraph in the PMBOK.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
126
Q

Configuration Management Plan

A

This subsidiary plan defines how changes to the features and functions of the project deliverables will be monitored and controlled within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
127
Q

Context Diagram

A

These diagrams show the relationship between elements of an environment. For example, a context diagram would illustrate the networks, servers, workstations, and people that interact with the elements of the environment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
128
Q

Focus Groups

A

A moderator-led requirements collection method to elicit requirements from stakeholders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
129
Q

Functional Analysis

A

This is the study of the functions within a system, project, or, what’s more likely in the project scope statement, the product the project will be creating. Functional analysis studies the goals of the product, how the product will be used, and the expectations the customer has of the product once it leaves the project and moves into operations. Functional analysis may also consider the cost of the product in operations, which is known as life-cycle costing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
130
Q

Funding Limit

A

Most projects have a determined budget in relation to the project scope. There may be a qualifier on this budget, such as plus or minus 10 percent based on the type of cost estimate created.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
131
Q

Interviews

A

A requirements collection method used to elicit requirements from stakeholders in a one-on-one conversation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
132
Q

Majority

A

A group decision method where more than 50 percent of the group must be in agreement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
133
Q

Mind Mapping

A

This approach maps ideas to show the relationship among requirements and the differences between requirements. The map can be reviewed to identify new solutions or to rank the identified requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
134
Q

Nominal Group Technique

A

As with brainstorming, participants are encouraged to generate as many ideas as possible, but the suggested ideas are ranked by a voting process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
135
Q

Passive Observation

A

The observer records information about the work being completed without interrupting the process; sometimes called the invisible observer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
136
Q

Plurality

A

A group-decision method where the largest part of the group makes the decision when it’s less than 50 percent of the total. (Consider three or four factions within the stakeholders.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
137
Q

Product Acceptance Criteria

A

This project scope statement component works with the project requirements, but focuses specifically on the product and what the conditions and processes are for formal acceptance of the product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
138
Q

Product Breakdown

A

A scope definition technique that breaks down a product into a hierarchical structure, much like a WBS breaks down a project scope.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
139
Q

Product Scope Description

A

This is a narrative description of what the project is creating as a deliverable for the project customer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
140
Q

Product Scope

A

Defines the product or service that will come about as a result of completing the project. It defines the features and functions that characterize the product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
141
Q

Project Assumptions

A

A project assumption is a factor in the planning process that is held to be true but not proven to be true.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
142
Q

Project Boundaries

A

A project boundary clearly states what is included with the project and what’s excluded from the project. This helps to eliminate assumptions between the project management team and the project customer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
143
Q

Project Constraints

A

A constraint is anything that limits the project manager’s options. Consider a predetermined budget, deadline, resources, or materials the project manager must use within the project— these are all examples of project constraints.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
144
Q

Project Objectives

A

These are the measurable goals that determine a project’s acceptability to the project customer and the overall success of the project. Objectives often include the cost, schedule, technical requirements, and quality demands.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
145
Q

Project Requirements

A

These are the demands set by the customer, regulations, or the performing organization that must exist for the project deliverables to be acceptable. Requirements are often prioritized in a number of ways, from “must have” to “should have” to “would like to have.”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
146
Q

Project Scope

A

This defines all of the work, and only the required work, to complete the project objectives.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
147
Q

Project Scope Management Plan

A

This project management subsidiary plan controls how the scope will be defined, how the project scope statement will be created, how the WBS will be created, how scope validation will proceed, and how the project scope will be controlled throughout the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
148
Q

Requirements Documentation

A

This documentation of what the stakeholders expected in the project defines all of the requirements that must be present for the work to be accepted by the stakeholders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
149
Q

Requirements Management Plan

A

This subsidiary plan defines how changes to the project requirements will be permitted, how requirements will be tracked, and how changes to the requirements will be approved.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
150
Q

Requirements Traceability Matrix (Rtm)

A

This is a table that maps the requirements throughout the project all the way to their completion.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
151
Q

Schedule Milestones

A

The project customer may have specific dates when phases of the project should be completed. These milestones are often treated as project constraints.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
152
Q

Scope Creep

A

Undocumented, unapproved changes to the project scope.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
153
Q

Scope Validation

A

The formal inspection of the project deliverables, which leads to project acceptance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
154
Q

Stakeholder Analysis

A

A scope definition process where the project management team interviews the stakeholders and categorizes, prioritizes, and documents what the project customer wants and needs. The analysis is to determine, quantify, and prioritize the interests of the stakeholders. Stakeholder analysis demands quantification of stakeholder objectives; goals such as “good,” “satisfaction,” and “speedy” aren’t quantifiable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
155
Q

Systems Analysis

A

A scope definition approach that studies and analyzes a system, its components, and the relationship of the components within the system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
156
Q

Systems Engineering

A

This project scope statement creation process studies how a system should work, designs and creates a system model, and then enacts the working system based on the project’s goals and the customer’s expectations. Systems engineering aims to balance the time and cost of the project in relation to the scope of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
157
Q

Unanimity

A

A group decision method where everyone must be in agreement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
158
Q

Value Analysis

A

As with value engineering, this approach examines the functions of the project’s product in relation to the cost of the features and functions. This is where, to some extent, the grade of the product is in relationship to the cost of the product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
159
Q

Value Engineering

A

This approach to project scope statement creation attempts to find the correct level of quality in relation to a reasonable budget for the project deliverable while still achieving an acceptable level of performance of the product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
160
Q

Wbs Dictionary

A

A WBS companion document that defines all of the characteristics of each element within the WBS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
161
Q

Wbs Template

A

A prepopulated WBS for repetitive projects. Previous projects’ WBSs are often used as templates for current similar projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
162
Q

Work Breakdown Structure (Wbs)

A

A deliverables-oriented breakdown of the project scope.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
163
Q

Work Package

A

The smallest item in the WBS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
164
Q

Work Performance Information

A

Status of the deliverables: the work that’s been started, finished, or has yet to begin.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
165
Q

Activity List

A

The primary output of breaking down the WBS work packages.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
166
Q

Alternative Analysis

A

The identification of more than one solution. Consider roles, materials, tools, and approaches to the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
167
Q

Analogous Estimating

A

A somewhat unreliable estimating approach that relies on historical information to predict what current activity durations should be. Analogous estimating is more reliable, however, than team member recollections. Analogous estimating is also known as top-down estimating and is a form of expert judgment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
168
Q

Bottom-Up Estimating

A

The most accurate time-and-cost estimating approach a project manager can use. This estimating approach starts at “the bottom” of the project and considers every activity, its predecessor and successor activities, and the exact amount of resources needed to complete each activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
169
Q

Control Account

A

A WBS entry that considers the time, cost, and scope measurements for that deliverable within the WBS. The estimated performance is compared against the actual performance to measure overall performance for the deliverables within that control account. The specifics of a control account are documented in a control account plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
170
Q

Control Threshold

A

A predetermined range of acceptable variances, such as +/–10 percent off schedule. Should the variance exceed the threshold, then project control processes and corrected actions will be enacted.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
171
Q

Crashing

A

A schedule compression approach that adds more resources to activities on the critical path to complete the project earlier. When crashing a project, costs are added because the associated labor and sometimes resources (such as faster equipment) cause costs to increase.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
172
Q

Critical Path

A

The path in the project network diagram that cannot be delayed, otherwise the project completion date will be late. There can be more than one critical path. Activities in the critical path have no float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
173
Q

Discretionary Dependencies

A

These dependencies are the preferred order of activities. Project managers should use these relationships at their discretion and should document the logic behind the decision. Discretionary dependencies allow activities to happen in a preferred order because of best practices, conditions unique to the project work, or external events. Also known as preferential or soft logic.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
174
Q

Early Finish

A

The earliest a project activity can finish. Used in the forward pass procedure to discover the critical path and the project float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
175
Q

Early Start

A

The earliest a project activity can begin. Used in the forward pass procedure to discover the critical path and the project float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
176
Q

External Dependencies

A

As the name implies, these are dependencies outside of the project’s control. Examples include the delivery of equipment from a vendor, the deliverable of another project, or the decision of a committee, lawsuit, or expected new law.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
177
Q

Fast Tracking

A

A schedule compression method that changes the relationship of activities. With fast tracking, activities that would normally be done in sequence are allowed to be done in parallel or with some overlap. Fast tracking can be accomplished by changing the relation of activities from FS to SS or even FF or by adding lead time to downstream activities. However, fast tracking does add risk to the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
178
Q

Finish-To-Finish

A

An activity relationship type that requires the current activity to be finished before its successor can finish.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
179
Q

Finish-To-Start

A

An activity relationship type that requires the current activity to be finished before its successor can start.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
180
Q

Fragnet

A

A representation of a project network diagram that is often used for outsourced portions of a project, repetitive work within a project, or a subproject. Also called a subnet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
181
Q

Free Float

A

This is the total time a single activity can be delayed without affecting the early start of its immediately following successor activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
182
Q

Hard Logic

A

Logic that describes activities that must happen in a particular order. For example, the dirt must be excavated before the foundation can be built. The foundation must be in place before the framing can begin. Also known as a mandatory dependency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
183
Q

Internal Dependencies

A

Internal relationships to the project or the organization. For example, the project team must create the software as part of the project’s deliverable before the software can be tested for quality control.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
184
Q

Lag Time

A

Positive time that moves two or more activities further apart.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
185
Q

Late Finish

A

The latest a project activity can finish. Used in the backward pass procedure to discover the critical path and the project float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
186
Q

Late Start

A

The latest a project activity can begin. Used in the backward pass procedure to discover the critical path and the project float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
187
Q

Lead Time

A

Negative time that allows two or more activities to overlap where ordinarily these activities would be sequential.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
188
Q

Management Reserve

A

A percentage of the project duration to combat Parkinson’s Law. When project activities become late, their lateness is subtracted from the management reserve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
189
Q

Mandatory Dependencies

A

These dependencies are the natural order of activities. For example, you can’t begin building your house until your foundation is in place. These relationships are called hard logic.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
190
Q

Monte Carlo Analysis

A

A project simulation approach named after the world-famous gambling district in Monaco. This predicts how scenarios may work out, given any number of variables. The process doesn’t actually churn out a specific answer, but a range of possible answers. When Monte Carlo analysis is applied to a schedule, it can examine, for example, the optimistic completion date, the pessimistic completion date, and the most likely completion date for each activity in the project and then predict a mean for the project schedule.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
191
Q

Parametric Estimate

A

A quantitatively based duration estimate that uses mathematical formulas to predict how long an activity will take based on the quantities of work to be completed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
192
Q

Parkinson’S Law

A

A theory that states: “Work expands so as to fill the time available for its completion.” It is considered with time estimating, because bloated or padded activity estimates will fill the amount of time allotted to the activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
193
Q

Planning Package

A

A WBS entry located below a control account and above the work packages. A planning package signifies that there is more planning that needs to be completed for this specific deliverable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
194
Q

Precedence Diagramming Method

A

A network diagram that shows activities in nodes and the relationship between each activity. Predecessors come before the current activity, and successors come after the current activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
195
Q

Project Calendars

A

Calendars that identify when the project work will occur.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
196
Q

Project Float

A

This is the total time the project can be delayed without passing the customer- expected completion date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
197
Q

Project Network Diagram

A

A diagram that visualizes the flow of the project activities and their relationships to other project activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
198
Q

Refinement

A

An update to the work breakdown structure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
199
Q

Resource Breakdown Structure (Rbs)

A

This is a hierarchical breakdown of the project resources by category and resource type. For example, you could have a category of equipment, a category of human resources, and a category of materials. Within each category, you could identify the types of equipment your project will use, the types of human resources, and the types of materials.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
200
Q

Resource Calendars

A

Calendars that identify when project resources are available for the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
201
Q

Resource-Leveling Heuristic

A

A method to flatten the schedule when resources are overallocated. Resource leveling can be applied using different methods to accomplish different goals. One of the most common methods is to ensure that workers are not overextended on activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
202
Q

Rolling Wave Planning

A

The imminent work is planned in detail, while the work in the future is planned at a high level. This is a form of progressive elaboration.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
203
Q

Schedule Management Plan

A

A subsidiary plan in the project management plan. It defines how the project schedule will be created, estimated, controlled, and managed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
204
Q

Soft Logic

A

The activities don’t necessarily have to happen in a specific order. For example, you could install the light fixtures first, then the carpet, and then paint the room. The project manager could use soft logic to change the order of the activities if so desired.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
205
Q

Start-To-Finish

A

An activity relationship that requires an activity to start so that its successor can finish. This is the most unusual of all the activity relationship types.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
206
Q

Start-To-Start

A

An activity relationship type that requires the current activity to start before its successor can start.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
207
Q

Subnet

A

A representation of a project network diagram that is often used for outsourced portions of projects, repetitive work within a project, or a subproject. Also called a fragnet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
208
Q

Template

A

A previous project that can be adapted for the current project and forms that are pre-populated with organizational-specific information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
209
Q

Three-Point Estimate

A

An estimating technique for each activity that requires optimistic, most likely, and pessimistic estimates to be created. Based on these three estimates, an average can be created to predict how long the activity should take.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
210
Q

Total Float

A

This is the total time an activity can be delayed without delaying project completion.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
211
Q

Work Package

A

The smallest item in the work breakdown structure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
212
Q

Actual Cost (Ac)

A

The actual amount of monies the project has spent to date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
213
Q

Analogous Estimating

A

An approach that relies on historical information to predict the cost of the current project. It is also known as top- down estimating and is the least reliable of all the cost-estimating approaches.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
214
Q

Bottom-Up Estimating

A

An estimating approach that starts from zero, accounts for each component of the WBS, and arrives at a sum for the project. It is completed with the project team and can be one of the most time- consuming and most reliable methods to predict project costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
215
Q

Budget Estimate

A

This estimate is also somewhat broad and is used early in the planning processes and also in top-down estimates. The range of variance for the estimate can be from –10 percent to +25 percent.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
216
Q

Commercial Database

A

A cost-estimating approach that uses a database, typically software-driven, to create the cost estimate for a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
217
Q

Contingency Reserve

A

A contingency allowance to account for overruns in costs. Contingency allowances are used at the project manager’s discretion and with management’s approval to counteract cost overruns for scheduled activities and risk events.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
218
Q

Cost Aggregation

A

Costs are parallel to each WBS work package. The costs of each work package are aggregated to their corresponding control accounts. Each control account then is aggregated to the sum of the project costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
219
Q

Cost Baseline

A

A time-lapse exposure of when the project monies are to be spent in relation to cumulative values of the work completed in the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
220
Q

Cost Budgeting

A

The cost aggregation achieved by assigning specific dollar amounts for each of the scheduled activities or, more likely, for each of the work packages in the WBS. Cost budgeting applies the cost estimates over time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
221
Q

Cost Change Control System

A

A system that examines any changes associated with scope changes, the cost of materials, and the cost of any other resources, and the associated impact on the overall project cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
222
Q

Cost Management Plan

A

The cost management plan dictates how cost variances will be managed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
223
Q

Cost Of Poor Quality

A

The monies spent to recover from not adhering to the expected level of quality. Examples may include rework, defect repair, loss of life or limb because safety precautions were not taken, loss of sales, and loss of customers. This is also known as the cost of nonconformance to quality.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
224
Q

Cost Of Quality

A

The monies spent to attain the expected level of quality within a project. Examples include training, testing, and safety precautions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
225
Q

Cost Performance Index (Cpi)

A

Measures the project based on its financial performance. The formula is CPI = EV/AC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
226
Q

Cost Variance (Cv)

A

The difference of the earned value amount and the cumulative actual costs of the project. The formula is CV = EV – AC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
227
Q

Definitive Estimate

A

This estimate type is one of the most accurate. It’s used late in the planning processes and is associated with bottom- up estimating. You need the WBS in order to create the definitive estimate. The range of variance for the estimate can be from –5 percent to +10 percent.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
228
Q

Direct Costs

A

Costs are attributed directly to the project work and cannot be shared among projects (for example, airfare, hotels, long-distance phone charges, and so on).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
229
Q

Earned Value (Ev)

A

Earned value is the physical work completed to date and the authorized budget for that work. It is the percentage of the BAC that represents the actual work completed in the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
230
Q

Estimate At Completion (Eac)

A

These forecasting formulas predict the likely completed costs of the project based on current scenarios within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
231
Q

Estimate To Complete (Etc)

A

An earned value management formula that predicts how much funding the project will require to be completed. Three variations of this formula are based on conditions the project may be experiencing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
232
Q

Fixed Costs

A

Costs that remain constant throughout the life of the project (the cost of a piece of rented equipment for the project, the cost of a consultant brought on to the project, and so on).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
233
Q

Funding Limit Reconciliation

A

An organization’s approach to managing cash flow against the project deliverables based on a schedule, milestone accomplishment, or data constraints.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
234
Q

Indirect Costs

A

Costs that are representative of more than one project (for example, utilities for the performing organization, access to a training room, project management software license, and so on).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
235
Q

Known Unknown

A

An event that will likely happen within the project, but when it will happen and to what degree is unknown. These events, such as delays, are usually risk-related.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
236
Q

Learning Curve

A

An approach that assumes the cost per unit decreases the more units workers complete, because workers learn as they complete the required work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
237
Q

Oligopoly

A

A market condition where the market is so tight that the actions of one vendor affect the actions of all the others.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
238
Q

Opportunity Cost

A

The total cost of the opportunity that is refused to realize an opposing opportunity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
239
Q

Parametric Estimating

A

An approach using a parametric model to extrapolate what costs will be needed for a project (for example, cost per hour and cost per unit). It can include variables and points based on conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
240
Q

Planned Value (Pv)

A

Planned value is the work scheduled and the budget authorized to accomplish that work. It is the percentage of the BAC that reflects where the project should be at this point in time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
241
Q

Project Variance

A

The final variance, which is discovered only at the project’s completion. The formula is VAR = BAC – AC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
242
Q

Regression Analysis

A

This is a statistical approach to predicting what future values may be, based on historical values. Regression analysis creates quantitative predictions based on variables within one value to predict variables in another. This form of estimating relies solely on pure statistical math to reveal relationships between variables and to predict future values.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
243
Q

Reserve Analysis

A

Cost reserves are for unknown unknowns within a project. The management reserve is not part of the project cost baseline, but is included as part of the project budget.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
244
Q

Rough Order Of Magnitude

A

This rough estimate is used during the initiating processes and in top-down estimates. The range of variance for the estimate can be from –25 percent to +75 percent.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
245
Q

Schedule Performance Index (Spi)

A

Measures the project based on its schedule performance. The formula is SPI = EV/PV.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
246
Q

Schedule Variance (Sv)

A

The difference between the earned value and the planned value. The formulas is SV = EV – PV.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
247
Q

Single Source

A

Many vendors can provide what your project needs to purchase, but you prefer to work with a specific vendor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
248
Q

Sole Source

A

Only one vendor can provide what your project needs to purchase. Examples include a specific consultant, specialized service, or unique type of material.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
249
Q

Sunk Costs

A

Monies that have already been invested in a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
250
Q

To-Complete Performance Index

A

A formula to forecast the likelihood of a project to achieve its goals based on what’s happening in the project right now. There are two different flavors for the TCPI, depending on what you want to accomplish. If you want to see if your project can meet the budget at completion, you’ll use this formula: TCPI = (BAC – EV)/(BAC – AC). If you want to see if your project can meet the newly created estimate at completion, you’ll use this version of the formula: TCPI = (BAC – EV)/(EAC – AC).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
251
Q

Variable Costs

A

Costs that change based on the conditions applied in the project (the number of meeting participants, the supply of and demand for materials, and so on).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
252
Q

Variance

A

The difference between what was expected and what was experienced.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
253
Q

Variance At Completion (Vac)

A

A forecasting formula that predicts how much of a variance the project will likely have based on current conditions within the project. The formula is VAC = BAC – EAC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
254
Q

Activity Network Diagram

A

These diagrams, such as the project network diagram, show the flow of the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
255
Q

Affinity Diagram

A

This diagram breaks down ideas, solutions, causes, and project components and groups them together with other similar ideas and components.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
256
Q

Benchmarking

A

Comparing any two similar entities to measure their performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
257
Q

Cause-And-Effect Diagrams

A

Diagrams that show the relationship between variables within a process and how those relationships may contribute to inadequate quality. The diagrams can help organize both the process and team opinions, as well as generate discussion on finding a solution to ensure quality.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
258
Q

Checklist

A

A simple approach to ensure that work is completed according to the quality policy.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
259
Q

Control Chart

A

A quality control chart that maps the performance of project work over time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
260
Q

Control Quality

A

An inspection-driven process that measures work results to confirm that the project is meeting the relevant quality standards.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
261
Q

Cost Of Conformance

A

This is the cost associated with the monies spent to attain the expected level of quality. It is also known as the cost of quality.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
262
Q

Cost Of Nonconformance To Quality

A

The cost associated with not satisfying quality expectations. This is also known as the cost of poor quality.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
263
Q

Cost-Benefit Analysis

A

A process to study the trade-offs between costs and the benefits realized from those costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
264
Q

Design Of Experiments

A

An approach that relies on statistical scenarios to determine what variables within a project will result in the best outcome.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
265
Q

External Qa

A

Assurance provided to the external customers of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
266
Q

Flowchart

A

A diagram illustrating how components within a system are related. Flowcharts show the relation between components, as well as help the project team determine where quality issues may be present and, once done, plan accordingly.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
267
Q

Internal Qa

A

Assurance provided to management and the project team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
268
Q

Iso

A

The abbreviation for the International Organization for Standardization. ISO is Greek for “equal,” while “International Organization for Standardization” in a different language would be abbreviated differently. The organization elected to use “ISO” for all languages.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
269
Q

Matrix Diagram

A

A data analysis table that shows the strength between variables and relationships in the matrix.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
270
Q

Pareto Diagram

A

A histogram that illustrates and ranks categories of failure within a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
271
Q

Quality

A

According to ASQ, the degree to which a set of inherent characteristics fulfills requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
272
Q

Quality Assurance

A

A management process that defines the quality system or quality policy that a project must adhere to. QA aims to plan quality into the project rather than to inspect quality into a deliverable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
273
Q

Quality Management Plan

A

This plan defines how the project team will implement and fulfill the quality policy of the performing organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
274
Q

Quality Metrics

A

The operational definitions that specify the measurements within a project and the expected targets for quality and performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
275
Q

Quality Planning

A

The process of first determining which quality standards are relevant to your project and then finding out the best methods of adhering to those quality standards.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
276
Q

Rule Of Seven

A

A component of a control chart that illustrates the results of seven measurements on one side of the mean, which is considered “out of control” in the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
277
Q

Run Chart

A

A quality control tool that shows the results of inspection in the order in which they’ve occurred. The goal of a run chart is first to demonstrate the results of a process over time and then to use trend analysis to predict when certain trends may reemerge.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
278
Q

Scatter Diagram

A

A quality control tool that tracks the relationship between two variables over time. The two variables are considered related the closer they track against a diagonal line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
279
Q

Seven Basic Quality Tools

A

These seven tools are used in quality planning and in quality control: cause-and-effect diagrams, flowcharts, check sheets, Pareto diagrams, histograms, control charts, and scatter diagrams.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
280
Q

Statistical Sampling

A

A process of choosing a percentage of results at random. For example, a project creating a medical device may have 20 percent of all units randomly selected to check for quality.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
281
Q

System Or Process Flowcharts

A

Flowcharts that illustrate the flow of a process through a system, such as a project change request through the change control system, or work authorization through a quality control process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
282
Q

Tree Diagram

A

Tree diagrams show the hierarchies and decomposition of a solution, an organization, or a project team. The WBS and an org chart are examples of tree diagrams.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
283
Q

Trend Analysis

A

The science of using past results to predict future performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
284
Q

Work Performance Information

A

The results of the project work as needed. This includes technical performance measures, project status, information on what the project has created to date, corrective actions, and performance reports.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
285
Q

Adjourning

A

Once the project is done, either the team moves onto other assignments as a unit, or the project team is disbanded and individual team members go on to other work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
286
Q

Authority Power

A

Project management team members may have authority over other project team members, may have the ability to make decisions, and perhaps even sign approvals for project work and purchases.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
287
Q

Coercive Power

A

The project manager has the authority to discipline the project team members. This is also known as penalty power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
288
Q

Collaborate/Problem Solving

A

This approach confronts the problem head-on and is the preferred method of conflict resolution. Multiple viewpoints and perspectives contribute to the solution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
289
Q

Collective Bargaining Agreement Constraints

A

Contracts and agreements with unions or other employee groups may serve as constraints on the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
290
Q

Competency

A

This attribute defines what talents, skills, and capabilities are needed to complete the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
291
Q

Compromising

A

This approach requires that both parties give up something.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
292
Q

Vroom’S Expectancy Theory

A

This theory states that people will behave based on what they expect as a result of their behavior. In other words, people will work in relation to the expected reward.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
293
Q

Expert Power

A

The project manager’s authority comes both from experience with the technology the project

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
294
Q

Forcing Power

A

The person with the power makes the decision.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
295
Q

Formal Power

A

The project manager has been assigned the role of project manager by senior management and is in charge of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
296
Q

Forming

A

The project team meets and learns about their roles and responsibilities on the project. Little interaction among the project team happens in this stage as the team is learning about the project and project manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
297
Q

Herzberg’S Theory Of Motivation

A

Frederick Herzberg’s theory of the motivating agents and hygiene agents that affect a person’s willingness to excel in his career.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
298
Q

Hierarchical Organizational Chart

A

A chart showing the relationship between superior and subordinate employees, groups, disciplines, and even departments.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
299
Q

Issue Log

A

A logbook of the issues the project team has identified and dates as to when the issues must be resolved by. The issue log may also include team members or stakeholders who are responsible for finding a solution to the identified issues.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
300
Q

Maslow’S Hierarchy Of Needs

A

Abraham Maslow’s theory of the five needs all humans have and work toward.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
301
Q

Mcclelland’S Theory Of Needs

A

David McClelland developed this theory, which states our needs are acquired and developed by our experiences over time. All people are, according to this theory, driven by one of three needs: achievement, affiliation, or power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
302
Q

Mcgregor’S Theory Of X And Y

A

Douglas McGregor’s theory that states management views workers in the Y category as competent and self-led and workers in the X category as incompetent and needing to be micromanaged.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
303
Q

Multicriteria Decision Analysis

A

A method to rate potential project team members based on criteria such as education, experience, skills, knowledge, and more.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
304
Q

Norming

A

Project team members go about getting the project work, begin to rely on one another, and generally complete their project assignments.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
305
Q

Organization Chart

A

Traditional chart that depicts how the organization is broken down by department and disciplines. This chart is sometimes called the organizational breakdown structure (OBS) and is arranged by departments, units, or teams.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
306
Q

Ouchi’S Theory Z

A

William Ouchi’s theory is based on the participative management style of the Japanese. This theory states that workers are motivated by a sense of commitment, opportunity, and advancement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
307
Q

Performing

A

If a project team can reach the performing stage of team development, they trust one another, work well together, and issues and problems get resolved quickly and effectively.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
308
Q

Political Interfaces

A

The hidden goals, personal agendas, and alliances among the project team members and the stakeholders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
309
Q

Raci Chart

A

A RACI chart is a matrix chart that only uses the activities of responsible, accountable, consult, and inform.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
310
Q

Referent Power

A

The project team personally knows the project manager. Referent can also mean that the project manager refers to the person who assigned him the position.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
311
Q

Resource Breakdown Structure (Rbs)

A

This hierarchical chart can decompose the project by the type of resources used throughout it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
312
Q

Responsibility Assignment Matrix (Ram)

A

A RAM chart shows the correlation between project team members and the work they’ve been assigned to complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
313
Q

Responsibility

A

A responsibility is the work that a role performs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
314
Q

Resource Management Plan

A

This plan defines staff acquisition, the timetable for staff acquisition, the staff release plan, training needs for the project team, any organizational compliance issues, rewards and

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
315
Q

Reward

A

The project manager has the authority to reward the project team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
316
Q

Role

A

This denotes what a person is specifically responsible for in a project. Roles are usually tied to job titles, such as network engineer, mechanical engineer, and electrician.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
317
Q

Smoothing

A

This approach smooths out the conflict by minimizing the perceived size of the problem. It is a temporary solution, but can calm team relations and boisterous discussions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
318
Q

Storming

A

The project team struggles for project positions, leadership, and project direction. The project team can become hostile toward the project leader, challenge ideas, and try to establish and claim positions about the project work. The amount of debate and fury can vary depending on if the project team is willing to work together, the nature of the project, and the control of the project manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
319
Q

Technical Interfaces

A

The project team identifies the disciplines and specialties that the project will require to complete the project scope statement. The technical interfaces are the resources that will be doing the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
320
Q

Withdrawal

A

This conflict resolution method sees one side of the argument walking away from the problem, usually in disgust.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
321
Q

Acknowledgment

A

The receiver signals that the message has been received. An acknowledgment shows receipt of the message, but not necessarily agreement with the message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
322
Q

Active Listening

A

The receiver confirms that the message is being received through feedback, questions, prompts for clarity, and other signs of confirmation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
323
Q

Choice Of Media

A

The best modality to use when communicating that is relevant to the information being communicated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
324
Q

Communication Assumptions

A

Anything that the project management team believes to be true but hasn’t proven to be true. For example, the project management team may assume that all of the project team can be reached via cell phone, but parts of the world, as of this writing, don’t have a cell signal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
325
Q

Communication Barrier

A

Anything that prohibits communication from occurring.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
326
Q

Communication Channels Formula

A

N(N – 1)/2, where N represents the number of identified stakeholders. This formula reveals the total number of communication channels within a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
327
Q

Communication Constraints

A

Anything that limits the project management team’s options. When it comes to communication constraints, geographical locales, incompatible communications software, and even limited communications technology can constrain the project team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
328
Q

Communications Management Plan

A

A project management subsidiary plan that defines the stakeholders who need specific information, the person who will supply the information, the schedule for the information to be supplied, and the approved modality to provide the information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
329
Q

Decoder

A

The device that decodes a message as it is being received.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
330
Q

Effective Listening

A

The receiver is involved in the listening experience by paying attention to visual cues from the speaker and paralingual characteristics, and by asking relevant questions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
331
Q

Encoder

A

The device that encodes the message being sent.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
332
Q

Feedback

A

The sender confirms that the receiver understands the message by directly asking for a response, questions for clarification, or other confirmation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
333
Q

Influence/Impact Grid

A

Stakeholders are mapped on a grid based on their influence over the project in relation to their influence over the project execution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
334
Q

Information Presentation Tools

A

A software package that allows the project management team to present the project’s health through graphics, spreadsheets, and text. (Think of Microsoft Project.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
335
Q

Information Retrieval System

A

A system to quickly and effectively store, archive, and access project information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
336
Q

Interactive Communication

A

This is the most common and most effective approach to communication. It’s where two or more people exchange information. Consider status meetings, ad-hoc meetings, phone calls, and videoconferences.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
337
Q

Lessons Learned

A

This is documentation of what did and did not work in the project implementation. Lessons learned documentation is created throughout the project by the entire project team. When lessons learned sessions are completed, they’re available to be used and applied by the entire organization. They are now part of the organizational process assets.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
338
Q

Medium

A

The device or technology that transports a message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
339
Q

Noise

A

Anything that interferes with or disrupts a message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
340
Q

Nonverbal

A

Facial expressions, hand gestures, and body language are nonverbal cues that contribute to a message. Approximately 55 percent of communication is nonverbal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
341
Q

Paralingual

A

The pitch, tone, and inflections in the sender’s voice affecting the message being sent.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
342
Q

Performance Report

A

A report that depicts how well a project is performing. Often, the performance report is based on earned value management and may include cost or schedule variance reports.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
343
Q

Project Presentations

A

Presentations are useful in providing information to customers, management, the project team, and other stakeholders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
344
Q

Project Records

A

All the business of the project communications is also part of the organizational process assets. This includes e-mails, memos, letters, and faxes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
345
Q

Project Reports

A

Reports are formal communications on project activities, their status, and conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
346
Q

Pull Communication

A

This approach pulls the information from a central repository, like a database of information. Pull communications are good for large groups of stakeholders who want to access project information at their discretion. Consider a project web site where stakeholders can periodically drop by for a quick update on the project status.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
347
Q

Push Communication

A

This approach pushes the information from the sender to the receiver without any real acknowledgment that the information was really received or understood. Consider letters, faxes, voicemail messages, e-mails, and other communications modalities that the sender packages and sends to receivers through some intermediary network.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
348
Q

Receiver

A

The person who receives the message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
349
Q

Sender

A

The person who is sending the message.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
350
Q

Sender–Receiver Models

A

Feedback loops and barriers to communications.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
351
Q

Stakeholder Notifications

A

Notices to the stakeholders about resolved issues, approved changes, and the overall health of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
352
Q

Status Review Meeting

A

A regularly scheduled meeting to discuss the status of the project and its progress toward completing the project scope statement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
353
Q

Time Reporting System

A

A system to record the actual time to complete project activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
354
Q

Acceptance

A

A risk response appropriate for both positive and negative risks, but often used for smaller risks within a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
355
Q

Ambiguity Risks

A

Risks that have an uncertain, unclear nature, such as new laws or regulations, the marketplace conditions, and other risks that are nearly impossible to predict.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
356
Q

Avoidance

A

A risk response to avoid the risk.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
357
Q

Brainstorming

A

The most common approach to risk identification; usually completed by a project team with subject matter experts to identify the risks within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
358
Q

Business Risks

A

These risks may have negative or positive outcomes. Examples include using a less experienced worker to complete a task, allowing phases or activities to overlap, or forgoing the expense of formal training for on-the-job education.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
359
Q

Cardinal Scales

A

A ranking approach to identify the probability and impact by using a numerical value, from .01 (very low) to 1.0 (certain).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
360
Q

Checklists

A

A quick and cost-effective risk identification approach.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
361
Q

Data Precision

A

The consideration of the risk ranking scores that takes into account any bias, the accuracy of the data submitted, and the reliability of the nature of the data submitted.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
362
Q

Decision Tree

A

A method to determine which of two or more decisions is the best one. The model examines the costs and benefits of each decision’s outcome and weighs the probability of success for each of the decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
363
Q

Delphi Technique

A

An anonymous method of querying experts about foreseeable risks within a project, phase, or component of a project. The results of the survey are analyzed by a third party, organized, and then circulated to the experts. There can be several rounds of anonymous discussion with the Delphi Technique, without fear of backlash or offending other participants in the process. The goal is to gain consensus on project risks within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
364
Q

Enhancing

A

A risk response that attempts to enhance the conditions to ensure that a positive risk event will likely happen.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
365
Q

Escalating

A

A risk response that is appropriate for both positive and negative risk events that may outside of the project manager’s authority to act upon.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
366
Q

Expected Monetary Value (Emv)

A

The monetary value of a risk exposure based on the risk’s probability and impact in the risk matrix. This approach is typically used in quantitative risk analysis because it quantifies the risk exposure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
367
Q

Exploit

A

A risk response that takes advantage of the positive risks within a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
368
Q

External Risks

A

These risks are outside of the project, but directly affect it—for example, legal issues, labor issues, a shift in project priorities, or weather. “Force majeure” risks call for disaster recovery rather than project management. These are risks caused by earthquakes, tornadoes, floods, civil unrest, and other disasters.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
369
Q

Flowcharts

A

System or process flowcharts show the relationship between components and how the overall process works. These are useful for identifying risks between system components.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
370
Q

Influence Diagrams

A

An influence diagram charts out a decision problem. It identifies all of the elements, variables, decisions, and objectives and also how each factor may influence another.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
371
Q

Ishikawa Diagrams

A

These cause-and-effect diagrams are also called fishbone diagrams and are used to find the root cause of factors that are causing risks within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
372
Q

Low-Priority Risk Watch List

A

Low-priority risks are identified and assigned to a watch list for periodic monitoring.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
373
Q

Mitigation

A

A risk response effort to reduce the probability and/or impact of an identified risk in the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
374
Q

Monte Carlo Technique

A

A simulation technique that got its name from the casinos of Monte Carlo, Monaco. The simulation is completed using a computer software program that can simulate a project, using values for all possible variables, to predict the most likely model.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
375
Q

Ordinal Scales

A

A ranking approach that identifies and ranks the risks from very high to very unlikely or to some other value.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
376
Q

Organizational Risks

A

The performing organization can contribute to the project’s risks through unreasonable cost, time, and scope expectations; poor project prioritization; inadequate funding or the disruption of funding; and competition with other projects for internal resources.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
377
Q

Pestle

A

A prompt list used for risk identification. PESTLE examines risks in the Political, Economic, Social, Technological, Legal, and Environmental domains.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
378
Q

Probability And Impact Matrix

A

A matrix that ranks the probability of a risk event occurring and its impact on the project if the event does happen; used in qualitative and quantitative risk analyses.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
379
Q

Project Management Risks

A

These risks deal with faults in the management of the project: the unsuccessful allocation of time, resources, and scheduling; unacceptable work results; and poor project management.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
380
Q

Pure Risks

A

These risks have only a negative outcome. Examples include loss of life or limb, fire, theft, natural disasters, and the like.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
381
Q

Qualitative Risk Analysis

A

This approach “qualifies” the risks that have been identified in the project. Specifically, qualitative risk analysis examines and prioritizes risks based on their probability of occurring and their impact on the project should they occur.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
382
Q

Quantitative Risk Analysis

A

This approach attempts to numerically assess the probability and impact of the identified risks. It also creates an overall risk score for the project. This method is more in-depth than qualitative risk analysis and relies on several different tools to accomplish its goal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
383
Q

Rag Rating

A

An ordinal scale that uses red, amber, and green (RAG) to capture the probability, impact, and risk score.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
384
Q

Residual Risks

A

Risks that are expected to remain after a risk response.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
385
Q

Risk

A

A project risk is an uncertain event or condition that can have a positive or negative impact on the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
386
Q

Risk Identification

A

The systematic process of combing through the project, the project plan, the work breakdown structure, and all supporting documentation to identify as many risks that may affect the project as possible.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
387
Q

Risk Management Plan

A

A project management subsidiary plan that defines how risks will be identified, analyzed, responded to, and monitored within the project. The plan also defines the iterative risk management process that the project is expected to adhere to.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
388
Q

Risk Management Planning

A

The agreed-upon approach to the management of the project risk processes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
389
Q

Risk Owners

A

The individuals or entities that are responsible for monitoring and responding to an identified risk within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
390
Q

Risk Register

A

The risk register is a project plan component that contains all of the information related to the risk management activities. It’s updated as risk management activities are conducted to reflect the status, progress, and nature of the project risks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
391
Q

Risk Report

A

The risk report explains the overall project risks and provides summaries about the individual project risks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
392
Q

Risk Response Audit

A

An audit to test the validity of the established risk responses.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
393
Q

Risk Responsibilities

A

The level of ownership an individual or entity has over a project risk.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
394
Q

Risk Score

A

The calculated score based on each risk’s probability and impact. The approach can be used in both qualitative and quantitative risk analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
395
Q

Root Cause Identification

A

Root cause identification aims to find out why a risk event may be occurring, the causal factors for the risk events, and then, eventually, how the events can be mitigated or eliminated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
396
Q

Secondary Risks

A

New risks that are created as a result of a risk response.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
397
Q

Sensitivity Analysis

A

A quantitative risk analysis tool that examines each risk to determine which one has the largest impact on the project’s success.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
398
Q

Sharing

A

A risk response that shares the advantages of a positive risk within a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
399
Q

Swot Analysis

A

SWOT analysis is the process of examining the project from the perspective of each characteristic: strengths, weaknesses, opportunities, and threats.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
400
Q

Tecop

A

A prompt list used in risk identification to examine the Technical, Environmental, Commercial, Operational, and Political factors of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
401
Q

Technical, Quality, Or Performance Risks

A

Technical risks are associated with new, unproven, or complex technologies being used on the project. Changes to the technology during the project implementation can also be a risk. Quality risks are the levels set for expectations of impractical quality and performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
402
Q

Transference

A

A risk response that transfers the ownership of the risk to another party. Insurance, licensed contractors, or other project teams are good examples of transference. A fee and contractual relationships are typically involved with the transference of a risk.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
403
Q

Variability Risks

A

A type of risk based on the variations that may occur in the project, such as production, number of quality errors, or even the weather.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
404
Q

Vuca

A

A prompt list used in risk identification that examines the Volatility, Uncertainty, Complexity, and Ambiguity of risk factors within the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
405
Q

Alternative Dispute Resolution

A

When there is an issue or claim that must be settled before the contract can be closed, the parties involved in the issue or claim will try to reach a settlement through mediation or arbitration.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
406
Q

Bid

A

From seller to buyer. Price is the determining factor in the decision-making process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
407
Q

Bidder Conference

A

A meeting of all the project’s potential vendors to clarify the contract statement of work and the details of the contracted work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
408
Q

Claims

A

These are disagreements between the buyer and the seller, usually centering on a change, who did the change, and even whether a change has occurred. Claims are also called disputes and appeals, and are monitored and controlled through the project in accordance with the contract terms.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
409
Q

Contract

A

A contract is a formal agreement between the buyer and the seller. Contracts can be oral or written—though written is preferred.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
410
Q

Contract Change Control System

A

This defines the procedures for how the contract may be changed. The process for changing the contract includes the forms; documented communications; tracking; conditions within the project, business, or marketplace that justify the needed change; dispute resolution procedures; and the procedures for getting the changes approved within the performing organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
411
Q

Contract Statement Of Work (Sow Also Csow)

A

This document requires that the seller fully describe the work to be completed and/or the product to be supplied. The SOW becomes part of the contract between the buyer and the seller.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
412
Q

Cost Plus Award Fee Contract

A

A contract that pays the vendor all costs for the project, but also includes a buyer- determined award fee for the project work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
413
Q

Cost Plus Fixed Fee Contract

A

A contract that requires the buyer to pay for the cost of the goods and services procured plus a fixed fee for the contracted work. The buyer assumes the risk of a cost overrun.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
414
Q

Cost Plus Incentive Fee

A

A contract type that requires the buyer to pay a cost for the procured work, plus an incentive fee, or a bonus, for the work if terms and conditions are met.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
415
Q

Cost Plus Percentage Of Costs

A

A contract that requires the buyer to pay for the costs of the goods and services procured plus a percentage of the costs. The buyer assumes all of the risks for cost overruns.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
416
Q

Direct Costs

A

These are costs incurred by the project in order for the project to exist. Examples include the equipment needed to complete the project work, salaries of the project team, and other expenses tied directly to the project’s existence.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
417
Q

Fixed-Price Contracts

A

Also known as firm fixed-price and lump- sum contracts, these are agreements that define a total price for the product the seller is to provide.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
418
Q

Fixed-Price Incentive Fee

A

A fixed-price contract with opportunities for bonuses for meeting goals on costs, schedule, and other objectives. These contracts usually have a price ceiling for costs and associated bonuses.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
419
Q

Fixed-Price With Economic Price Adjustments

A

A fixed-price contract with a special allowance for price increases based on economic reasons such as inflation or the cost of raw materials.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
420
Q

Force Majeure

A

An “act of God” that may have a negative impact on the project. Examples include fire, hurricanes, tornadoes, and earthquakes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
421
Q

Independent Estimates

A

These estimates are often referred to as “should cost” estimates. They are created by the performing organization or outside experts to predict what the cost of the procured product should be.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
422
Q

Indirect Costs

A

These are costs attributed to the cost of doing business. Examples include utilities, office space, and other overhead costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
423
Q

Invitation For Bid (Ifb)

A

From buyer to seller. Requests the seller to provide a price for the procured product or service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
424
Q

Letter Contract

A

A letter contract allows the vendor to begin working on the project immediately. It is often used as a stopgap solution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
425
Q

Letter Of Intent

A

A letter of intent is not a contract, but a letter stating that the buyer is intending to create a contractual relationship with the seller.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
426
Q

Make-Or-Buy Decision

A

A process in which the project management team determines the cost- effectiveness, benefits, and feasibility of making a product or buying it from a vendor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
427
Q

Privity

A

The contractual relationship between the buyer and the seller is often considered confidential and secret.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
428
Q

Procurement Management Plan

A

A project management subsidiary plan that documents the decisions made in the procurement planning processes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
429
Q

Procurement Planning

A

A process to identify which parts of the project warrant procurement from a vendor by the buyer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
430
Q

Proposal

A

A document the seller provides to the buyer. The proposal includes more than just a fee for the proposed work. It also includes information on the vendor’s skills, the vendor’s reputation, and ideas on how the vendor can complete the contracted work for the buyer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
431
Q

Purchase Order (Po)

A

A purchase order is a form of unilateral contract that the buyer provides to the vendor showing that the purchase has been approved by the buyer’s organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
432
Q

Quotation

A

From seller to buyer. Price is the determining factor in the decision-making process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
433
Q

Request For Proposal (Rfp)

A

From buyer to seller. Requests the seller to provide a proposal to complete the procured work or to provide the procured product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
434
Q

Request For Quote (Rfq)

A

From buyer to seller. Requests the seller to provide a price for the procured product or service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
435
Q

Risk-Related Contractual Agreements

A

When the project management team decides to use transference to respond to a risk, a risk-related contractual agreement is created between the buyer and the seller.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
436
Q

Screening System

A

A tool that filters or screens out vendors that don’t qualify for the contract.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
437
Q

Seller Rating Systems

A

These are used by organizations to rate prior experience with each vendor that they have worked with in the past. The seller rating system can track performance, quality ratings, delivery, and even contract compliance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
438
Q

Terms Of Reference

A

Defines the obligations for the seller, what the seller will provide, and all of the particulars of the contracted work. Terms of reference is similar to the statement of work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
439
Q

Time And Materials Contract

A

A contract type in which the buyer pays for the time and materials for the procured work. This is a simple contract, usually for smaller procurement conditions. These contract types require a not-to-exceed clause, or the buyer assumes the risk for cost overruns.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
440
Q

Weighting System

A

This takes out the personal preferences of the decision maker in the organization to ensure that the best seller is awarded the contract. Weights are assigned to the values of the proposals, and each proposal is scored.

441
Q

Interactive Communications

A

This type of communication means that information is happening among stakeholders, like in a forum. Examples of interactive communications are meetings, videoconferences, phone calls, and ad-hoc conversations. Interactive communications means that the participants are actively communicating with one another.

442
Q

Brain Writing

A

A data gathering technique that’s similar to brainstorming, but provides brainstorming meeting participants with the questions and topics for brainstorming before the stakeholder identification meeting.

443
Q

Key Stakeholder

A

Stakeholders—such as management, the project manager, program manager, or customers—that have the authority to make decisions in the project.

444
Q

Leading Stakeholder Status

A

Part of stakeholder analysis classification. A leading stakeholder is aware of your project, they want your project to be successful, and the stakeholder is working to make certain the project is a success.

445
Q

Negative Stakeholder

A

A stakeholder who does not want the project to exist and is opposed to the project.

446
Q

Neutral Stakeholder

A

A stakeholder who has neither a positive nor negative attitude about the project’s existence.

447
Q

Neutral Stakeholder Status

A

Part of stakeholder analysis classification. A neutral stakeholder is aware of your project and is not concerned if the project succeeds or fails.

448
Q

Positive Stakeholder

A

A stakeholder who sees the benefits of the project and is in favor of the change the project is to bring about.

449
Q

Profile Analysis Meeting

A

This is an analysis meeting to examine and document the roles in the project. The role’s interests, concerns, influence, project knowledge, and attitude are documented.

450
Q

Pull Communications

A

This type of communication pulls information from a central repository. Pull communications allow stakeholders to retrieve information from a central source as needed.

451
Q

Push Communications

A

This type of communication happens when the sender pushes the same message to multiple people. Good examples of push communications are broadcast text messages, faxes, press releases, and group e-mails.

452
Q

Reporting System

A

A reporting system is a software program to store and analyze project data for reporting. A common reporting system will take project data, allow the project manager to pass the data through earned value management, for example, and then create forecasting reports about the project costs and schedule.

453
Q

Resistant Stakeholder Status

A

Part of stakeholder analysis classification. A resistant stakeholder is aware of your project, but they do not support the changes your project will create.

454
Q

Stakeholder

A

Anyone who is affected by the existence of the project or who can affect the project’s existence. Stakeholders can enter and exit the project as conditions change within the project.

455
Q

Stakeholder Analysis

A

An activity that ranks stakeholders based on their influence, interests, and expectations of the project. Stakeholders are identified and ranked, and then their needs and expectations are documented and addressed.

456
Q

Stakeholder Classification Models

A

These are charts and diagrams that help the project manager determine the influence of stakeholders in relation to their interest in the project. Common classification models include the power/interest grid, the power/influence grid, the influence/impact grid, and the salience model.

457
Q

Stakeholder Engagement

A

The project manager works to keep the project stakeholders interested, involved, and supportive of the project. Through communication, management skills, and interpersonal skills, the project manager can work to keep the project stakeholders engaged and interested in the project.

458
Q

Stakeholder Identification

A

A project initiation activity to identify, document, and classify the project stakeholders as early as possible in the project.

459
Q

Stakeholder Management

A

The project management knowledge area that focuses on the management and engagement of the project stakeholders. There are four processes in this knowledge area: identify stakeholders, plan stakeholder management, manage stakeholder engagement, and Monitor Stakeholder Engagement.

460
Q

Stakeholder Engagement Plan

A

The stakeholder engagement plan documents a strategy for managing the engagement of project stakeholders. The stakeholder engagement plan establishes stakeholder engagement and defines how the project manager can increase and improve stakeholder engagement.

461
Q

Stakeholder Engagement Planning

A

The project manager works with the project team and subject matter experts to create a strategy to manage the project stakeholders.

462
Q

Stakeholder Register

A

A documentation of each stakeholder’s contact information, position, concerns, interests, and attitude toward the project. The project manager updates the register as new stakeholders are identified and when stakeholders leave the project.

463
Q

Supportive Stakeholder Status

A

This is part of stakeholder analysis classification. A supportive stakeholder is aware of your project and is supportive and hopeful that the project will be successful.

464
Q

Unaware Stakeholder Status

A

Part of stakeholder analysis classification. An unaware status means the stakeholder doesn’t know about the project and the effect the project may create on the stakeholder.

465
Q

The PMI publication that defines widely accepted project management practices. The CAPM and the PMP exam are based on this book.

A

A Guide to the Project Management Body of Knowledge (PMBOK Guide)

466
Q

The areas of expertise, industry, or function where a project is centered. Examples of application areas include architecture, IT, health care, and manufacturing.

A

Application Areas

467
Q

A quantifiable return on investment. The return can be tangible, such as equipment, money, or market share. The return can also be intangible, such as brand recognition, trademarks, and reputation.

A

Business Value

468
Q

A person who has slightly less project management experience than a PMP, but who has qualified for and then passed the examination to be an associate.

A

Certified Associate In Project Management (CAPM)

469
Q

Defines how a project affects people and how those people may affect the project. This includes the economic, educational, ethical, religious, demographic, and ethnic composition of the people affected by the project.

A

Cultural And Social Environment

470
Q

A product, service, or result created by a project. Projects can have multiple.

A

Deliverable

471
Q

These include the application of accounting, procurement, sales and marketing, contracting, manufacturing, logistics, strategic planning, human resource management, standards and regulations, and information technology.

A

General Management Skills

472
Q

The consideration of the local and international laws, languages, communication challenges, time zone differences, and other non-collocated issues that affect a project’s ability to progress.

A

International And Political Environment

473
Q

The ability to interact, lead, motivate, and manage people.

A

Interpersonal Skills

474
Q

A triangle with the characteristics of time, cost, and scope. Time, cost, and scope each constitute one side of the triangle; if any side is not in balance with the other sides, the project will suffer. This is also known as the Triple Constraints of Project Management, as all projects are constrained by time, cost, and scope.

A

Iron Triangle Of Project Management

475
Q

The physical structure and surroundings that affect a project’s work.

A

Physical Environment

476
Q

A collection of related processes in project management. There are five process groups and 49 project management processes. The five process groups are Initiating, Planning, Executing, Monitoring and Controlling, and Closing.

A

Process Groups

477
Q

A collection of related projects working in unison toward a common deliverable.

A

Program

478
Q

The process of gathering project details. This process uses deductive reasoning, logic, and a series of information- gathering techniques to identify details about a project, product, or solution.

A

Progressive Elaboration

479
Q

A temporary endeavor to create a unique product, service, or result. The end result of a project is also called a deliverable.

A

Project

480
Q

A documented created and maintained by the project sponsor and the project manager. The project benefits management plan defines what benefits the project will create, when the benefits will be realized, and how the benefits will be measured.

A

Project Benefits Management Plan

481
Q

Created and maintained by the project sponsor and shows the financial validity of why a project is chartered and launched within the organization. Typically, the project business case is created before the launch of the project and may be used as a go/no-go decision point.

A

Project Business Case

482
Q

The location and culture of the environment where the project work will reside. This includes the social, economic, and environmental variables the project must work with or around.

A

Project Environment

483
Q

An organization of project management professionals from around the world, supporting and promoting the careers, values, and concerns of project managers.

A

Project Management Institute (PMI)

484
Q

The phases that make up the project. These are unique to the type of work being performed and are not universal to all projects.

A

Project Life Cycle

485
Q

A central office that oversees all projects within an organization or within a functional department. Supports the project manager through software, training, templates, policies, communication, dispute resolution, and other services.

A

Project Management Office (PMO)

486
Q

A person who has proven project management experience and has qualified for and then passed the PMP examination.

A

Project Management Professional (PMP)

487
Q

The management and selection of projects that support an organization’s vision and mission. It is the balance of project priority, risk, reward, and return on investment. This is a senior management process.

A

Project Portfolio Management

488
Q

A smaller project managed within a larger, parent project. These are often contracted work whose deliverable allows the larger project to progress.

A

Subprojects

489
Q

Also known as the Iron Triangle. This theory posits that time, cost, and scope are three constraints that every project has.

A

Triple Constraints Of Project Management

490
Q

Raw data, observations, and measurements about project components. This data is gathered and stored in the project management information system.

A

Work Performance Data

491
Q

The processed and analyzed data that will help the project manager make project decisions.

A

Work Performance Information

492
Q

The formatted communication of work performance information. Work performance reports communicate what’s happening in the project through status reports, memos, dashboards, or other modalities.

A

Work Performance Reports

493
Q

An organization where organizational resources are pooled into one project team, but the functional managers and the project managers share the project power.

A

Balanced Matrix Structure

494
Q

The culture and the styles of an organization. ____ such as work ethics, hours, view of authority, and shared values, can affect how the project is managed.

A

Cultural Norms

495
Q

Conditions that affect how the project manager may manage the project. Enterprise environmental factors come from within the project, such as policy, or they be external to the organization, such as law or regulation.

A

Enterprise Environmental Factors

496
Q

An organization that is divided into functions, and each employee has one clear functional manager. Each department acts independently of the other departments. A project manager in this structure has little to no power and may be called a project coordinator.

A

Functional Structure

497
Q

Describes the rules, policies, and procedures that people within an organization abide by. Also addresses the organization, but also address portfolios, programs, and projects. Regarding portfolios, programs, and projects the governance framework addresses alignment with organizational vision, risk management, performance factors, and communication.

A

Governance Framework

498
Q

An organization that creates a blend of the functional, matrix, and project- oriented structures.

A

Hybrid Structure

499
Q

Describe organizations that have duplication of efforts within the organization, but not within each department or division of the organization. Project manager has little authority in this structure and the functional manager controls the project budget.

A

Multidivisional Structure

500
Q

Describes a loosely organized business or organization. There likely aren’t big formal departments and people work alongside one another regardless of roles and titles. The project manager likely has little control over the project resources and may not be called a project manager.

A

Organic Or Simple

501
Q

Includes organizational processes, policies, procedures, and items from a corporate knowledge base. These are grouped into two categories to consider: processes, policies and procedures, and organizational knowledge bases.

A

Organizational Process Assets

502
Q

The databases, files, and historical information that you can use to help better plan and manage your projects. This is an organizational process asset that is created internally to your organization through the ongoing work of operations and other projects.

A

Organizational Knowledge Repositories

503
Q

A system can create things by working with multiple components that the individual components could not create if they worked alone. The structure of the organization and the governance framework creates constraints that affect how the project manager makes decisions within the project. The organizational system directly affects how the project manager utilizes their power, influence, leadership, and even political capital, to get things done in the environment.

A

Organizational System

504
Q

A business unit that centralizes the operations and procedures of all projects within the organization. Can be supportive, controlling, or directive.

A

Project Management Office (PMO)

505
Q

An organization that assigns a project team to one project for the duration of the project life cycle. The project manager has high-to-almost-complete project power.

A

Project-Oriented Structure

506
Q

An organization where organizational resources are pooled into one project team, but the functional managers have less project power than the project manager.

A

Strong Matrix Structure

507
Q

Uses a network structure to communicate and interact with other groups and departments. A point of contact exists for each department and these department point of contact receive and send all messages for the department.

A

Virtual Organization

508
Q

An organization where organizational resources are pooled into one project team, but the functional managers have more project power than the project manager.

A

Weak Matrix Structure

509
Q

The message receiver restates what’s been said to fully understand and confirm the message and it provides an opportunity for the sender to clarify the message if needed.

A

Active Listening

510
Q

Begins with problem definition. Problem definition is the ability to discern between the cause and effect of the problem. Root-cause analysis looks beyond the immediate symptoms to the cause of the symptoms—which then affords opportunities for solutions.

A

Active Problem Solving

511
Q

The project manager refuses to act, get involved, or make decisions.

A

Avoiding Power

512
Q

The leader is motivating, has high- energy, and inspires the team through strong convictions about what’s possible and what the team can achieve. Positive thinking and a can-do mentality are characteristics of a charismatic leader.

A

Charismatic Leadership

513
Q

The project manager has deep skills and experience in a discipline (for example, years of working in IT helps an IT project manager better manage IT projects).

A

Expert Power

514
Q

The project manager aims to gain favor with the project team and stakeholders through flattery.

A

Ingratiating Power

515
Q

The individual has power and control of the data gathering and distribution of information.

A

Informational Power

516
Q

The leader is a hybrid of transactional, transformational, and charismatic leaders. The interactional leader wants the team to act, is excited and inspired about the project work, yet still holds the team accountable for their results.

A

Interactional Leadership

517
Q

The project manager can make the team and stakeholders feel guilty to gain compliance in the project.

A

Guilt-Based Power

518
Q

This is about aligning, motivating, and inspiring the project team members to do the right thing, build trust, think creatively, and to challenge the status quo.

A

Leadership

519
Q

The leader takes a “hands-off” approach to the project. This means the project team makes decisions, takes initiative in the actions, and creates goals. While this approach can provide autonomy, it can make the leader appear absent when it comes to project decisions.

A

Laissez-Faire Leadership

520
Q

Management utilizes positional power to maintain, administrate, control, and focus on getting things done without challenging the status quo of the project and organization.

A

Management

521
Q

Based on the audience and the message being sent, the media should be in alignment with the message.

A

Media Selection

522
Q

Meetings are forms of communication. How the meeting is led, managed, and controlled all influence the message being delivered. Agendas, minutes, and order are mandatory for effective communications within a meeting.

A

Meeting Management

523
Q

The project manager has a warm personality that others like.

A

Personal Or Charismatic Power

524
Q

In formal presentations, the presenter’s oral and body language, visual aids, and handouts all influence the message being delivered.

A

Presentation

525
Q

The project manager can restrict choices to get the project team to perform and do the project work.

A

Pressure-Based Power

526
Q

Defines three areas of PDUs for PMI certified professionals to maintain their certification. The PMI Talent Triangle includes technical project management, leadership, and strategic and business management.

A

Pmi Talent Triangle

527
Q

The project manager’s power is because of the position she has as the project manager. This is also known as formal, authoritative, and legitimate power.

A

Positional Power

528
Q

PDUs are earned after the PMP to maintain the PMP certification. PMPs are required to earn 60 PDUs per three-year certification cycle. Of the 60 PDUs, a minimum of 35 hours must come from educational opportunities.

A

Professional Development Units (Pdus)

529
Q

The role of leading the project team and managing the project resources to effectively achieve the objectives of the project.

A

Project Manager

530
Q

The project manager can punish the project team.

A

Punitive Or Coercive Power

531
Q

The project manager is respected or admired because of the team’s past experiences with the project manager. This is about the project manager’s credibility in the organization.

A

Referent Power

532
Q

The project manager can reward the project team.

A

Reward Power

533
Q

Communication requires a sender and a receiver. Within this model may be multiple avenues to complete the flow of communication, but barriers to effective communication may be present as well.

A

Sender-Receiver Models

534
Q

The leader puts others first and focuses on the needs of the people he serves. Servant leaders provide opportunity for growth, education, autonomy within the project, and the well-being of others. The primary focus of servant leadership is service to others.

A

Servant Leadership

535
Q

The project manager has power because of certain situations in the organization.

A

Situational Power

536
Q

The tone, structure, and formality of the message being sent should be in alignment with the audience and the content of the message.

A

Style

537
Q

The leader emphasizes the goals of the project and rewards and disincentives for the project team. This is sometimes called management by exception as it’s the exception that is reward or punished.

A

Transactional Leadership

538
Q

The leader inspires and motivates the project team to achieve the project goals. Transformational leaders aim to empower the project team to act, be innovative in the project work, and accomplish through ambition.

A

Transformational Leadership

539
Q

An assumption is something that is believed to be true or false, but it has not yet been proven to be true or false. Assumptions that prove wrong can become risks for the project. All identified project assumptions are recorded in the assumption log for testing and analysis, and the outcomes are recorded.

A

Assumption Log

540
Q

This is an example of a benefits comparison model. It examines the benefit-to-cost ratio.

A

Benefit/Cost Ratio (Bcr) Models

541
Q

A committee that evaluates the worthiness of a proposed change and either approves or rejects the proposed change.

A

Change Control Board (Ccb)

542
Q

The change control system communicates the process for controlling changes to the project deliverables. This system works with the configuration management system and seeks to control and document proposals to change the project’s product.

A

Change Control System (Ccs)

543
Q

All changes that enter into a project are recorded in the change log. The characteristics of the change, such as the time, cost, risk, and scope details, are also recorded.

A

Change Log

544
Q

This plan details the project procedures for entertaining change requests: how change requests are managed, documented, approved, or declined.

A

Change Management Plan

545
Q

This final process group of the project management life cycle is responsible for closing the project phase or project. This is where project documentation is archived and project contracts are also closed.

A

Closure Processes

546
Q

This plan defines who will get what information, how they will receive it, and in what modality the communication will take place.

A

Communications Management Plan

547
Q

This includes the labeling of the components, how changes are made to the product, and the accountability of the changes.

A

Configuration Identification

548
Q

This plan is an input to the control scope process. It defines how changes to the features and functions of the project deliverable, the product scope, may enter the project.

A

Configuration Management Plan

549
Q

This system defines how stakeholders are allowed to submit change requests, the conditions for approving a change request, and how approved change requests are validated in the project scope. Configuration management also documents the characteristics and functions of the project’s products and any changes to a product’s characteristics.

A

Configuration Management System

550
Q

The organization of the product materials, details, and prior product documentation.

A

Configuration Status Accounting

551
Q

The scope verification and completeness auditing of project or phase deliverables to ensure that they are in alignment with the project plan.

A

Configuration Verification And Auditing

552
Q

The formal verification of the contract completeness by the vendor and the performing organization.

A

Contract Closure

553
Q

This is the aggregated costs of all of the work packages within the work breakdown structure (WBS).

A

Cost Baseline

554
Q

This plan details how the project costs will be planned for, estimated, budgeted, and then monitored and controlled.

A

Cost Management Plan

555
Q

Knowledge that can be quickly and easily expressed through conversations, documentation, figures, or numbers, is easily communicated.

A

Explicit Knowledge

556
Q

A benefit comparison model to determine a future value of money. The formula to calculate future value is FV = PV(1 + I)n, where PV is present value, I is the given interest rate, and n is the number of periods.

A

Future Value

557
Q

A process to consider and control the impact of a proposed change on the project’s knowledge areas.

A

Integrated Change Control

558
Q

Issues are points of contention where some question of the project’s direction needs to be resolved. All identified issues are documented in the issue log, along with an issue owner and a deadline to resolve the issue. The outcome of the issue is also recorded.

A

Issue Log

559
Q

A project selection method to determine the likelihood of success. These models include linear programming, nonlinear programming, dynamic programming, integer programming, and multiobjective programming.

A

Mathematical Model

560
Q

Milestones are significant points or events in the project’s progress that represent accomplishment in the project. Projects usually create milestones as the result of completing phases within the project.

A

Milestone

561
Q

This list details the project milestones and their attributes. It is used for several areas of project planning, but also helps determine how quickly the project may be achieving its objectives.

A

Milestone List

562
Q

These are committees that ask every conceivable negative question about the proposed project. Their goals are to expose the project’s strengths and weaknesses, and to kill the project if it’s deemed unworthy for the organization to commit to. Also known as project steering committees or project selection committees.

A

Murder Boards

563
Q

Evaluates the monies returned on a project for each period the project lasts.

A

Net Present Value

564
Q

An estimate to predict how long it will take a project to pay back an organization for the project’s investment of capital.

A

Payback Period

565
Q

A benefit comparison model to determine the present value of a future amount of money. The formula to calculate present value is PV = FV ÷ (1 + i)n, where FV is future value, I is the given interest rate, and n is the number of periods.

A

Present Value

566
Q

The procurement management plan controls how the project will acquire goods and services.

A

Procurement Management Plan

567
Q

This document authorizes the project. It defines the initial requirements of the project stakeholders. The project charter is endorsed by an entity outside of the project boundaries.

A

Project Charter

568
Q

The documented approach of how a project will be planned, executed, monitored and controlled, and then closed. This document is a collection of subsidiary management plans and related documents.

A

Project Management Plan

569
Q

Defines how the project scope will be planned, managed, and controlled.

A

Project Scope Management Plan

570
Q

Documents the quality objectives for the project, including the metrics for stakeholder acceptance of the project deliverable.

A

Quality Baseline

571
Q

This plan defines what quality means for the project, how the project will achieve quality, and how the project will map to organizational procedures pertaining to quality.

A

Quality Management Plan

572
Q

A mathematical model to examine the relationship among project variables, like cost, time, labor, and other project metrics.

A

Regression Analysis

573
Q

Risk is an uncertain event or condition that may affect the project outcome. The risk management plan defines how the project will manage risk.

A

Risk Management Plan

574
Q

The risk register is a centralized database consisting of the outcome of all the other risk management processes, such as the outcome of risk identification, qualitative analysis, and quantitative analysis.

A

Risk Register

575
Q

This subsidiary plan defines the risk responses that are to be used in the project for both positive and negative risks.

A

Risk Response Plan

576
Q

This is the planned start and finish of the project. The comparison of what was planned and what was experienced is the schedule variance.

A

Schedule Baseline

577
Q

Defines how the project schedule will be created and managed.

A

Schedule Management Plan

578
Q

The scope baseline is a combination of three project documents: the project scope statement, the work breakdown structure, and the WBS dictionary. The creation of the project deliverable will be measured against the scope baseline to show any variances from what was expected and what the project team has created.

A

Scope Baseline

579
Q

These models use a common set of values for all of the projects up for selection. For example, values can be profitability, complexity, customer demand, and so on.

A

Scoring Models

580
Q

Knowledge that’s more difficult to express because it’s personal beliefs, values, knowledge gain from experience, and “know-how” when doing a task.

A

Tacit Knowledge

581
Q

A planning heuristic for creating the WBS. This rule states that the work package in a WBS must take no more than 80 hours of labor to create and no fewer than 8 hours of labor to create.

A

8/80 Rule

582
Q

The observer interacts with the worker to ask questions and understand each step of the work being completed. In some instances, the observer could serve as an assistant in doing the work.

A

Active Observation

583
Q

When stakeholders create a large number of ideas, you can use an affinity diagram to cluster similar ideas together for further analysis.

A

Affinity Diagrams

584
Q

A scope definition process of finding alternative solutions for the project customer while considering the customer’s satisfaction, the cost of the solution, and how the customer may use the product in operations.

A

Alternatives Generation

585
Q

A decision method where only one individual makes the decision for the group.

A

Autocratic

586
Q

This approach encourages participants to generate as many ideas as possible about the project requirements. No idea is judged or dismissed during the brainstorming session.

A

Brainstorming

587
Q

Documented in the scope management plan, this system defines how changes to the project scope are managed and controlled.

A

Change Control System (Ccs)

588
Q

This subsidiary plan defines how changes will be allowed and managed within the project.

A

Change Management Plan

589
Q

A numbering system for each item in the WBS. The PMBOK is a good example of a code of accounts, as each chapter and its subheadings follow a logical numbering scheme. For example, PMBOK 5.3.3.2 identifies an exact paragraph in the PMBOK.

A

Code Of Accounts

590
Q

This subsidiary plan defines how changes to the features and functions of the project deliverables will be monitored and controlled within the project.

A

Configuration Management Plan

591
Q

These diagrams show the relationship between elements of an environment. For example, a context diagram would illustrate the networks, servers, workstations, and people that interact with the elements of the environment.

A

Context Diagram

592
Q

A moderator-led requirements collection method to elicit requirements from stakeholders.

A

Focus Groups

593
Q

This is the study of the functions within a system, project, or, what’s more likely in the project scope statement, the product the project will be creating. Functional analysis studies the goals of the product, how the product will be used, and the expectations the customer has of the product once it leaves the project and moves into operations. Functional analysis may also consider the cost of the product in operations, which is known as life-cycle costing.

A

Functional Analysis

594
Q

Most projects have a determined budget in relation to the project scope. There may be a qualifier on this budget, such as plus or minus 10 percent based on the type of cost estimate created.

A

Funding Limit

595
Q

A requirements collection method used to elicit requirements from stakeholders in a one-on-one conversation.

A

Interviews

596
Q

A group decision method where more than 50 percent of the group must be in agreement.

A

Majority

597
Q

This approach maps ideas to show the relationship among requirements and the differences between requirements. The map can be reviewed to identify new solutions or to rank the identified requirements.

A

Mind Mapping

598
Q

As with brainstorming, participants are encouraged to generate as many ideas as possible, but the suggested ideas are ranked by a voting process.

A

Nominal Group Technique

599
Q

The observer records information about the work being completed without interrupting the process; sometimes called the invisible observer.

A

Passive Observation

600
Q

A group-decision method where the largest part of the group makes the decision when it’s less than 50 percent of the total. (Consider three or four factions within the stakeholders.)

A

Plurality

601
Q

This project scope statement component works with the project requirements, but focuses specifically on the product and what the conditions and processes are for formal acceptance of the product.

A

Product Acceptance Criteria

602
Q

A scope definition technique that breaks down a product into a hierarchical structure, much like a WBS breaks down a project scope.

A

Product Breakdown

603
Q

This is a narrative description of what the project is creating as a deliverable for the project customer.

A

Product Scope Description

604
Q

Defines the product or service that will come about as a result of completing the project. It defines the features and functions that characterize the product.

A

Product Scope

605
Q

A project assumption is a factor in the planning process that is held to be true but not proven to be true.

A

Project Assumptions

606
Q

A project boundary clearly states what is included with the project and what’s excluded from the project. This helps to eliminate assumptions between the project management team and the project customer.

A

Project Boundaries

607
Q

A constraint is anything that limits the project manager’s options. Consider a predetermined budget, deadline, resources, or materials the project manager must use within the project— these are all examples of project constraints.

A

Project Constraints

608
Q

These are the measurable goals that determine a project’s acceptability to the project customer and the overall success of the project. Objectives often include the cost, schedule, technical requirements, and quality demands.

A

Project Objectives

609
Q

These are the demands set by the customer, regulations, or the performing organization that must exist for the project deliverables to be acceptable. Requirements are often prioritized in a number of ways, from “must have” to “should have” to “would like to have.”

A

Project Requirements

610
Q

This defines all of the work, and only the required work, to complete the project objectives.

A

Project Scope

611
Q

This project management subsidiary plan controls how the scope will be defined, how the project scope statement will be created, how the WBS will be created, how scope validation will proceed, and how the project scope will be controlled throughout the project.

A

Project Scope Management Plan

612
Q

This documentation of what the stakeholders expected in the project defines all of the requirements that must be present for the work to be accepted by the stakeholders.

A

Requirements Documentation

613
Q

This subsidiary plan defines how changes to the project requirements will be permitted, how requirements will be tracked, and how changes to the requirements will be approved.

A

Requirements Management Plan

614
Q

This is a table that maps the requirements throughout the project all the way to their completion.

A

Requirements Traceability Matrix (Rtm)

615
Q

The project customer may have specific dates when phases of the project should be completed. These milestones are often treated as project constraints.

A

Schedule Milestones

616
Q

Undocumented, unapproved changes to the project scope.

A

Scope Creep

617
Q

The formal inspection of the project deliverables, which leads to project acceptance.

A

Scope Validation

618
Q

A scope definition process where the project management team interviews the stakeholders and categorizes, prioritizes, and documents what the project customer wants and needs. The analysis is to determine, quantify, and prioritize the interests of the stakeholders. Stakeholder analysis demands quantification of stakeholder objectives; goals such as “good,” “satisfaction,” and “speedy” aren’t quantifiable.

A

Stakeholder Analysis

619
Q

A scope definition approach that studies and analyzes a system, its components, and the relationship of the components within the system.

A

Systems Analysis

620
Q

This project scope statement creation process studies how a system should work, designs and creates a system model, and then enacts the working system based on the project’s goals and the customer’s expectations. Systems engineering aims to balance the time and cost of the project in relation to the scope of the project.

A

Systems Engineering

621
Q

A group decision method where everyone must be in agreement.

A

Unanimity

622
Q

As with value engineering, this approach examines the functions of the project’s product in relation to the cost of the features and functions. This is where, to some extent, the grade of the product is in relationship to the cost of the product.

A

Value Analysis

623
Q

This approach to project scope statement creation attempts to find the correct level of quality in relation to a reasonable budget for the project deliverable while still achieving an acceptable level of performance of the product.

A

Value Engineering

624
Q

A WBS companion document that defines all of the characteristics of each element within the WBS.

A

Wbs Dictionary

625
Q

A prepopulated WBS for repetitive projects. Previous projects’ WBSs are often used as templates for current similar projects.

A

Wbs Template

626
Q

A deliverables-oriented breakdown of the project scope.

A

Work Breakdown Structure (Wbs)

627
Q

The smallest item in the WBS.

A

Work Package

628
Q

Status of the deliverables: the work that’s been started, finished, or has yet to begin.

A

Work Performance Information

629
Q

The primary output of breaking down the WBS work packages.

A

Activity List

630
Q

The identification of more than one solution. Consider roles, materials, tools, and approaches to the project work.

A

Alternative Analysis

631
Q

A somewhat unreliable estimating approach that relies on historical information to predict what current activity durations should be. Analogous estimating is more reliable, however, than team member recollections. Analogous estimating is also known as top-down estimating and is a form of expert judgment.

A

Analogous Estimating

632
Q

The most accurate time-and-cost estimating approach a project manager can use. This estimating approach starts at “the bottom” of the project and considers every activity, its predecessor and successor activities, and the exact amount of resources needed to complete each activity.

A

Bottom-Up Estimating

633
Q

A WBS entry that considers the time, cost, and scope measurements for that deliverable within the WBS. The estimated performance is compared against the actual performance to measure overall performance for the deliverables within that control account. The specifics of a control account are documented in a control account plan.

A

Control Account

634
Q

A predetermined range of acceptable variances, such as +/–10 percent off schedule. Should the variance exceed the threshold, then project control processes and corrected actions will be enacted.

A

Control Threshold

635
Q

A schedule compression approach that adds more resources to activities on the critical path to complete the project earlier. When crashing a project, costs are added because the associated labor and sometimes resources (such as faster equipment) cause costs to increase.

A

Crashing

636
Q

The path in the project network diagram that cannot be delayed, otherwise the project completion date will be late. There can be more than one critical path. Activities in the critical path have no float.

A

Critical Path

637
Q

These dependencies are the preferred order of activities. Project managers should use these relationships at their discretion and should document the logic behind the decision. Discretionary dependencies allow activities to happen in a preferred order because of best practices, conditions unique to the project work, or external events. Also known as preferential or soft logic.

A

Discretionary Dependencies

638
Q

The earliest a project activity can finish. Used in the forward pass procedure to discover the critical path and the project float.

A

Early Finish

639
Q

The earliest a project activity can begin. Used in the forward pass procedure to discover the critical path and the project float.

A

Early Start

640
Q

As the name implies, these are dependencies outside of the project’s control. Examples include the delivery of equipment from a vendor, the deliverable of another project, or the decision of a committee, lawsuit, or expected new law.

A

External Dependencies

641
Q

A schedule compression method that changes the relationship of activities. With fast tracking, activities that would normally be done in sequence are allowed to be done in parallel or with some overlap. Fast tracking can be accomplished by changing the relation of activities from FS to SS or even FF or by adding lead time to downstream activities. However, fast tracking does add risk to the project.

A

Fast Tracking

642
Q

An activity relationship type that requires the current activity to be finished before its successor can finish.

A

Finish-To-Finish

643
Q

An activity relationship type that requires the current activity to be finished before its successor can start.

A

Finish-To-Start

644
Q

A representation of a project network diagram that is often used for outsourced portions of a project, repetitive work within a project, or a subproject. Also called a subnet.

A

Fragnet

645
Q

This is the total time a single activity can be delayed without affecting the early start of its immediately following successor activities.

A

Free Float

646
Q

Logic that describes activities that must happen in a particular order. For example, the dirt must be excavated before the foundation can be built. The foundation must be in place before the framing can begin. Also known as a mandatory dependency.

A

Hard Logic

647
Q

Internal relationships to the project or the organization. For example, the project team must create the software as part of the project’s deliverable before the software can be tested for quality control.

A

Internal Dependencies

648
Q

Positive time that moves two or more activities further apart.

A

Lag Time

649
Q

The latest a project activity can finish. Used in the backward pass procedure to discover the critical path and the project float.

A

Late Finish

650
Q

The latest a project activity can begin. Used in the backward pass procedure to discover the critical path and the project float.

A

Late Start

651
Q

Negative time that allows two or more activities to overlap where ordinarily these activities would be sequential.

A

Lead Time

652
Q

A percentage of the project duration to combat Parkinson’s Law. When project activities become late, their lateness is subtracted from the management reserve.

A

Management Reserve

653
Q

These dependencies are the natural order of activities. For example, you can’t begin building your house until your foundation is in place. These relationships are called hard logic.

A

Mandatory Dependencies

654
Q

A project simulation approach named after the world-famous gambling district in Monaco. This predicts how scenarios may work out, given any number of variables. The process doesn’t actually churn out a specific answer, but a range of possible answers. When Monte Carlo analysis is applied to a schedule, it can examine, for example, the optimistic completion date, the pessimistic completion date, and the most likely completion date for each activity in the project and then predict a mean for the project schedule.

A

Monte Carlo Analysis

655
Q

A quantitatively based duration estimate that uses mathematical formulas to predict how long an activity will take based on the quantities of work to be completed.

A

Parametric Estimate

656
Q

A theory that states: “Work expands so as to fill the time available for its completion.” It is considered with time estimating, because bloated or padded activity estimates will fill the amount of time allotted to the activity.

A

Parkinson’S Law

657
Q

A WBS entry located below a control account and above the work packages. A planning package signifies that there is more planning that needs to be completed for this specific deliverable.

A

Planning Package

658
Q

A network diagram that shows activities in nodes and the relationship between each activity. Predecessors come before the current activity, and successors come after the current activity.

A

Precedence Diagramming Method

659
Q

Calendars that identify when the project work will occur.

A

Project Calendars

660
Q

This is the total time the project can be delayed without passing the customer- expected completion date.

A

Project Float

661
Q

A diagram that visualizes the flow of the project activities and their relationships to other project activities.

A

Project Network Diagram

662
Q

An update to the work breakdown structure.

A

Refinement

663
Q

This is a hierarchical breakdown of the project resources by category and resource type. For example, you could have a category of equipment, a category of human resources, and a category of materials. Within each category, you could identify the types of equipment your project will use, the types of human resources, and the types of materials.

A

Resource Breakdown Structure (Rbs)

664
Q

Calendars that identify when project resources are available for the project work.

A

Resource Calendars

665
Q

A method to flatten the schedule when resources are overallocated. Resource leveling can be applied using different methods to accomplish different goals. One of the most common methods is to ensure that workers are not overextended on activities.

A

Resource-Leveling Heuristic

666
Q

The imminent work is planned in detail, while the work in the future is planned at a high level. This is a form of progressive elaboration.

A

Rolling Wave Planning

667
Q

A subsidiary plan in the project management plan. It defines how the project schedule will be created, estimated, controlled, and managed.

A

Schedule Management Plan

668
Q

The activities don’t necessarily have to happen in a specific order. For example, you could install the light fixtures first, then the carpet, and then paint the room. The project manager could use soft logic to change the order of the activities if so desired.

A

Soft Logic

669
Q

An activity relationship that requires an activity to start so that its successor can finish. This is the most unusual of all the activity relationship types.

A

Start-To-Finish

670
Q

An activity relationship type that requires the current activity to start before its successor can start.

A

Start-To-Start

671
Q

A representation of a project network diagram that is often used for outsourced portions of projects, repetitive work within a project, or a subproject. Also called a fragnet.

A

Subnet

672
Q

A previous project that can be adapted for the current project and forms that are pre-populated with organizational-specific information.

A

Template

673
Q

An estimating technique for each activity that requires optimistic, most likely, and pessimistic estimates to be created. Based on these three estimates, an average can be created to predict how long the activity should take.

A

Three-Point Estimate

674
Q

This is the total time an activity can be delayed without delaying project completion.

A

Total Float

675
Q

The smallest item in the work breakdown structure.

A

Work Package

676
Q

The actual amount of monies the project has spent to date.

A

Actual Cost (Ac)

677
Q

An approach that relies on historical information to predict the cost of the current project. It is also known as top- down estimating and is the least reliable of all the cost-estimating approaches.

A

Analogous Estimating

678
Q

An estimating approach that starts from zero, accounts for each component of the WBS, and arrives at a sum for the project. It is completed with the project team and can be one of the most time- consuming and most reliable methods to predict project costs.

A

Bottom-Up Estimating

679
Q

This estimate is also somewhat broad and is used early in the planning processes and also in top-down estimates. The range of variance for the estimate can be from –10 percent to +25 percent.

A

Budget Estimate

680
Q

A cost-estimating approach that uses a database, typically software-driven, to create the cost estimate for a project.

A

Commercial Database

681
Q

A contingency allowance to account for overruns in costs. Contingency allowances are used at the project manager’s discretion and with management’s approval to counteract cost overruns for scheduled activities and risk events.

A

Contingency Reserve

682
Q

Costs are parallel to each WBS work package. The costs of each work package are aggregated to their corresponding control accounts. Each control account then is aggregated to the sum of the project costs.

A

Cost Aggregation

683
Q

A time-lapse exposure of when the project monies are to be spent in relation to cumulative values of the work completed in the project.

A

Cost Baseline

684
Q

The cost aggregation achieved by assigning specific dollar amounts for each of the scheduled activities or, more likely, for each of the work packages in the WBS. Cost budgeting applies the cost estimates over time.

A

Cost Budgeting

685
Q

A system that examines any changes associated with scope changes, the cost of materials, and the cost of any other resources, and the associated impact on the overall project cost.

A

Cost Change Control System

686
Q

The cost management plan dictates how cost variances will be managed.

A

Cost Management Plan

687
Q

The monies spent to recover from not adhering to the expected level of quality. Examples may include rework, defect repair, loss of life or limb because safety precautions were not taken, loss of sales, and loss of customers. This is also known as the cost of nonconformance to quality.

A

Cost Of Poor Quality

688
Q

The monies spent to attain the expected level of quality within a project. Examples include training, testing, and safety precautions.

A

Cost Of Quality

689
Q

Measures the project based on its financial performance. The formula is CPI = EV/AC.

A

Cost Performance Index (Cpi)

690
Q

The difference of the earned value amount and the cumulative actual costs of the project. The formula is CV = EV – AC.

A

Cost Variance (Cv)

691
Q

This estimate type is one of the most accurate. It’s used late in the planning processes and is associated with bottom- up estimating. You need the WBS in order to create the definitive estimate. The range of variance for the estimate can be from –5 percent to +10 percent.

A

Definitive Estimate

692
Q

Costs are attributed directly to the project work and cannot be shared among projects (for example, airfare, hotels, long-distance phone charges, and so on).

A

Direct Costs

693
Q

Earned value is the physical work completed to date and the authorized budget for that work. It is the percentage of the BAC that represents the actual work completed in the project.

A

Earned Value (Ev)

694
Q

These forecasting formulas predict the likely completed costs of the project based on current scenarios within the project.

A

Estimate At Completion (Eac)

695
Q

An earned value management formula that predicts how much funding the project will require to be completed. Three variations of this formula are based on conditions the project may be experiencing.

A

Estimate To Complete (Etc)

696
Q

Costs that remain constant throughout the life of the project (the cost of a piece of rented equipment for the project, the cost of a consultant brought on to the project, and so on).

A

Fixed Costs

697
Q

An organization’s approach to managing cash flow against the project deliverables based on a schedule, milestone accomplishment, or data constraints.

A

Funding Limit Reconciliation

698
Q

Costs that are representative of more than one project (for example, utilities for the performing organization, access to a training room, project management software license, and so on).

A

Indirect Costs

699
Q

An event that will likely happen within the project, but when it will happen and to what degree is unknown. These events, such as delays, are usually risk-related.

A

Known Unknown

700
Q

An approach that assumes the cost per unit decreases the more units workers complete, because workers learn as they complete the required work.

A

Learning Curve

701
Q

A market condition where the market is so tight that the actions of one vendor affect the actions of all the others.

A

Oligopoly

702
Q

The total cost of the opportunity that is refused to realize an opposing opportunity.

A

Opportunity Cost

703
Q

An approach using a parametric model to extrapolate what costs will be needed for a project (for example, cost per hour and cost per unit). It can include variables and points based on conditions.

A

Parametric Estimating

704
Q

Planned value is the work scheduled and the budget authorized to accomplish that work. It is the percentage of the BAC that reflects where the project should be at this point in time.

A

Planned Value (Pv)

705
Q

The final variance, which is discovered only at the project’s completion. The formula is VAR = BAC – AC.

A

Project Variance

706
Q

This is a statistical approach to predicting what future values may be, based on historical values. Regression analysis creates quantitative predictions based on variables within one value to predict variables in another. This form of estimating relies solely on pure statistical math to reveal relationships between variables and to predict future values.

A

Regression Analysis

707
Q

Cost reserves are for unknown unknowns within a project. The management reserve is not part of the project cost baseline, but is included as part of the project budget.

A

Reserve Analysis

708
Q

This rough estimate is used during the initiating processes and in top-down estimates. The range of variance for the estimate can be from –25 percent to +75 percent.

A

Rough Order Of Magnitude

709
Q

Measures the project based on its schedule performance. The formula is SPI = EV/PV.

A

Schedule Performance Index (Spi)

710
Q

The difference between the earned value and the planned value. The formulas is SV = EV – PV.

A

Schedule Variance (Sv)

711
Q

Many vendors can provide what your project needs to purchase, but you prefer to work with a specific vendor.

A

Single Source

712
Q

Only one vendor can provide what your project needs to purchase. Examples include a specific consultant, specialized service, or unique type of material.

A

Sole Source

713
Q

Monies that have already been invested in a project.

A

Sunk Costs

714
Q

A formula to forecast the likelihood of a project to achieve its goals based on what’s happening in the project right now. There are two different flavors for the TCPI, depending on what you want to accomplish. If you want to see if your project can meet the budget at completion, you’ll use this formula: TCPI = (BAC – EV)/(BAC – AC). If you want to see if your project can meet the newly created estimate at completion, you’ll use this version of the formula: TCPI = (BAC – EV)/(EAC – AC).

A

To-Complete Performance Index

715
Q

Costs that change based on the conditions applied in the project (the number of meeting participants, the supply of and demand for materials, and so on).

A

Variable Costs

716
Q

The difference between what was expected and what was experienced.

A

Variance

717
Q

A forecasting formula that predicts how much of a variance the project will likely have based on current conditions within the project. The formula is VAC = BAC – EAC.

A

Variance At Completion (Vac)

718
Q

These diagrams, such as the project network diagram, show the flow of the project work.

A

Activity Network Diagram

719
Q

This diagram breaks down ideas, solutions, causes, and project components and groups them together with other similar ideas and components.

A

Affinity Diagram

720
Q

Comparing any two similar entities to measure their performance.

A

Benchmarking

721
Q

Diagrams that show the relationship between variables within a process and how those relationships may contribute to inadequate quality. The diagrams can help organize both the process and team opinions, as well as generate discussion on finding a solution to ensure quality.

A

Cause-And-Effect Diagrams

722
Q

A simple approach to ensure that work is completed according to the quality policy.

A

Checklist

723
Q

A quality control chart that maps the performance of project work over time.

A

Control Chart

724
Q

An inspection-driven process that measures work results to confirm that the project is meeting the relevant quality standards.

A

Control Quality

725
Q

This is the cost associated with the monies spent to attain the expected level of quality. It is also known as the cost of quality.

A

Cost Of Conformance

726
Q

The cost associated with not satisfying quality expectations. This is also known as the cost of poor quality.

A

Cost Of Nonconformance To Quality

727
Q

A process to study the trade-offs between costs and the benefits realized from those costs.

A

Cost-Benefit Analysis

728
Q

An approach that relies on statistical scenarios to determine what variables within a project will result in the best outcome.

A

Design Of Experiments

729
Q

Assurance provided to the external customers of the project.

A

External Qa

730
Q

A diagram illustrating how components within a system are related. Flowcharts show the relation between components, as well as help the project team determine where quality issues may be present and, once done, plan accordingly.

A

Flowchart

731
Q

Assurance provided to management and the project team.

A

Internal Qa

732
Q

The abbreviation for the International Organization for Standardization. ISO is Greek for “equal,” while “International Organization for Standardization” in a different language would be abbreviated differently. The organization elected to use “ISO” for all languages.

A

Iso

733
Q

A data analysis table that shows the strength between variables and relationships in the matrix.

A

Matrix Diagram

734
Q

A histogram that illustrates and ranks categories of failure within a project.

A

Pareto Diagram

735
Q

According to ASQ, the degree to which a set of inherent characteristics fulfills requirements.

A

Quality

736
Q

A management process that defines the quality system or quality policy that a project must adhere to. QA aims to plan quality into the project rather than to inspect quality into a deliverable.

A

Quality Assurance

737
Q

This plan defines how the project team will implement and fulfill the quality policy of the performing organization.

A

Quality Management Plan

738
Q

The operational definitions that specify the measurements within a project and the expected targets for quality and performance.

A

Quality Metrics

739
Q

The process of first determining which quality standards are relevant to your project and then finding out the best methods of adhering to those quality standards.

A

Quality Planning

740
Q

A component of a control chart that illustrates the results of seven measurements on one side of the mean, which is considered “out of control” in the project.

A

Rule Of Seven

740
Q

A component of a control chart that illustrates the results of seven measurements on one side of the mean, which is considered “out of control” in the project.

A

Rule Of Seven

741
Q

A quality control tool that shows the results of inspection in the order in which they’ve occurred. The goal of a run chart is first to demonstrate the results of a process over time and then to use trend analysis to predict when certain trends may reemerge.

A

Run Chart

741
Q

A quality control tool that shows the results of inspection in the order in which they’ve occurred. The goal of a run chart is first to demonstrate the results of a process over time and then to use trend analysis to predict when certain trends may reemerge.

A

Run Chart

742
Q

A quality control tool that tracks the relationship between two variables over time. The two variables are considered related the closer they track against a diagonal line.

A

Scatter Diagram

742
Q

A quality control tool that tracks the relationship between two variables over time. The two variables are considered related the closer they track against a diagonal line.

A

Scatter Diagram

743
Q

These seven tools are used in quality planning and in quality control: cause-and-effect diagrams, flowcharts, check sheets, Pareto diagrams, histograms, control charts, and scatter diagrams.

A

Seven Basic Quality Tools

744
Q

A process of choosing a percentage of results at random. For example, a project creating a medical device may have 20 percent of all units randomly selected to check for quality.

A

Statistical Sampling

744
Q

A process of choosing a percentage of results at random. For example, a project creating a medical device may have 20 percent of all units randomly selected to check for quality.

A

Statistical Sampling

745
Q

Flowcharts that illustrate the flow of a process through a system, such as a project change request through the change control system, or work authorization through a quality control process.

A

System Or Process Flowcharts

745
Q

Flowcharts that illustrate the flow of a process through a system, such as a project change request through the change control system, or work authorization through a quality control process.

A

System Or Process Flowcharts

746
Q

Tree diagrams show the hierarchies and decomposition of a solution, an organization, or a project team. The WBS and an org chart are examples of tree diagrams.

A

Tree Diagram

746
Q

Tree diagrams show the hierarchies and decomposition of a solution, an organization, or a project team. The WBS and an org chart are examples of tree diagrams.

A

Tree Diagram

747
Q

The science of using past results to predict future performance.

A

Trend Analysis

747
Q

The science of using past results to predict future performance.

A

Trend Analysis

748
Q

The results of the project work as needed. This includes technical performance measures, project status, information on what the project has created to date, corrective actions, and performance reports.

A

Work Performance Information

748
Q

The results of the project work as needed. This includes technical performance measures, project status, information on what the project has created to date, corrective actions, and performance reports.

A

Work Performance Information

749
Q

Once the project is done, either the team moves onto other assignments as a unit, or the project team is disbanded and individual team members go on to other work.

A

Adjourning

749
Q

Once the project is done, either the team moves onto other assignments as a unit, or the project team is disbanded and individual team members go on to other work.

A

Adjourning

750
Q

Project management team members may have authority over other project team members, may have the ability to make decisions, and perhaps even sign approvals for project work and purchases.

A

Authority Power

750
Q

Project management team members may have authority over other project team members, may have the ability to make decisions, and perhaps even sign approvals for project work and purchases.

A

Authority Power

751
Q

The project manager has the authority to discipline the project team members. This is also known as penalty power.

A

Coercive Power

751
Q

The project manager has the authority to discipline the project team members. This is also known as penalty power.

A

Coercive Power

752
Q

This approach confronts the problem head-on and is the preferred method of conflict resolution. Multiple viewpoints and perspectives contribute to the solution.

A

Collaborate/Problem Solving

752
Q

This approach confronts the problem head-on and is the preferred method of conflict resolution. Multiple viewpoints and perspectives contribute to the solution.

A

Collaborate/Problem Solving

753
Q

Contracts and agreements with unions or other employee groups may serve as constraints on the project.

A

Collective Bargaining Agreement Constraints

753
Q

Contracts and agreements with unions or other employee groups may serve as constraints on the project.

A

Collective Bargaining Agreement Constraints

754
Q

This attribute defines what talents, skills, and capabilities are needed to complete the project work.

A

Competency

754
Q

This attribute defines what talents, skills, and capabilities are needed to complete the project work.

A

Competency

755
Q

This approach requires that both parties give up something.

A

Compromising

755
Q

This approach requires that both parties give up something.

A

Compromising

756
Q

This theory states that people will behave based on what they expect as a result of their behavior. In other words, people will work in relation to the expected reward.

A

Vroom’S Expectancy Theory

756
Q

This theory states that people will behave based on what they expect as a result of their behavior. In other words, people will work in relation to the expected reward.

A

Vroom’S Expectancy Theory

757
Q

The project manager’s authority comes both from experience with the technology the project

A

Expert Power

757
Q

The project manager’s authority comes both from experience with the technology the project

A

Expert Power

758
Q

The person with the power makes the decision.

A

Forcing Power

758
Q

The person with the power makes the decision.

A

Forcing Power

759
Q

The project manager has been assigned the role of project manager by senior management and is in charge of the project.

A

Formal Power

759
Q

The project manager has been assigned the role of project manager by senior management and is in charge of the project.

A

Formal Power

760
Q

The project team meets and learns about their roles and responsibilities on the project. Little interaction among the project team happens in this stage as the team is learning about the project and project manager.

A

Forming

760
Q

The project team meets and learns about their roles and responsibilities on the project. Little interaction among the project team happens in this stage as the team is learning about the project and project manager.

A

Forming

761
Q

Frederick Herzberg’s theory of the motivating agents and hygiene agents that affect a person’s willingness to excel in his career.

A

Herzberg’S Theory Of Motivation

761
Q

Frederick Herzberg’s theory of the motivating agents and hygiene agents that affect a person’s willingness to excel in his career.

A

Herzberg’S Theory Of Motivation

762
Q

A chart showing the relationship between superior and subordinate employees, groups, disciplines, and even departments.

A

Hierarchical Organizational Chart

762
Q

A chart showing the relationship between superior and subordinate employees, groups, disciplines, and even departments.

A

Hierarchical Organizational Chart

763
Q

A logbook of the issues the project team has identified and dates as to when the issues must be resolved by. The issue log may also include team members or stakeholders who are responsible for finding a solution to the identified issues.

A

Issue Log

763
Q

A logbook of the issues the project team has identified and dates as to when the issues must be resolved by. The issue log may also include team members or stakeholders who are responsible for finding a solution to the identified issues.

A

Issue Log

764
Q

Abraham Maslow’s theory of the five needs all humans have and work toward.

A

Maslow’S Hierarchy Of Needs

764
Q

Abraham Maslow’s theory of the five needs all humans have and work toward.

A

Maslow’S Hierarchy Of Needs

765
Q

David McClelland developed this theory, which states our needs are acquired and developed by our experiences over time. All people are, according to this theory, driven by one of three needs: achievement, affiliation, or power.

A

Mcclelland’S Theory Of Needs

765
Q

David McClelland developed this theory, which states our needs are acquired and developed by our experiences over time. All people are, according to this theory, driven by one of three needs: achievement, affiliation, or power.

A

Mcclelland’S Theory Of Needs

766
Q

Douglas McGregor’s theory that states management views workers in the Y category as competent and self-led and workers in the X category as incompetent and needing to be micromanaged.

A

Mcgregor’S Theory Of X And Y

767
Q

A method to rate potential project team members based on criteria such as education, experience, skills, knowledge, and more.

A

Multicriteria Decision Analysis

767
Q

A method to rate potential project team members based on criteria such as education, experience, skills, knowledge, and more.

A

Multicriteria Decision Analysis

768
Q

Project team members go about getting the project work, begin to rely on one another, and generally complete their project assignments.

A

Norming

769
Q

Traditional chart that depicts how the organization is broken down by department and disciplines. This chart is sometimes called the organizational breakdown structure (OBS) and is arranged by departments, units, or teams.

A

Organization Chart

769
Q

Traditional chart that depicts how the organization is broken down by department and disciplines. This chart is sometimes called the organizational breakdown structure (OBS) and is arranged by departments, units, or teams.

A

Organization Chart

770
Q

William Ouchi’s theory is based on the participative management style of the Japanese. This theory states that workers are motivated by a sense of commitment, opportunity, and advancement.

A

Ouchi’S Theory Z

770
Q

William Ouchi’s theory is based on the participative management style of the Japanese. This theory states that workers are motivated by a sense of commitment, opportunity, and advancement.

A

Ouchi’S Theory Z

771
Q

If a project team can reach the performing stage of team development, they trust one another, work well together, and issues and problems get resolved quickly and effectively.

A

Performing

772
Q

The hidden goals, personal agendas, and alliances among the project team members and the stakeholders.

A

Political Interfaces

772
Q

The hidden goals, personal agendas, and alliances among the project team members and the stakeholders.

A

Political Interfaces

773
Q

A RACI chart is a matrix chart that only uses the activities of responsible, accountable, consult, and inform.

A

Raci Chart

774
Q

The project team personally knows the project manager. Referent can also mean that the project manager refers to the person who assigned him the position.

A

Referent Power

774
Q

The project team personally knows the project manager. Referent can also mean that the project manager refers to the person who assigned him the position.

A

Referent Power

775
Q

This hierarchical chart can decompose the project by the type of resources used throughout it.

A

Resource Breakdown Structure (Rbs)

775
Q

This hierarchical chart can decompose the project by the type of resources used throughout it.

A

Resource Breakdown Structure (Rbs)

776
Q

A RAM chart shows the correlation between project team members and the work they’ve been assigned to complete.

A

Responsibility Assignment Matrix (Ram)

776
Q

A RAM chart shows the correlation between project team members and the work they’ve been assigned to complete.

A

Responsibility Assignment Matrix (Ram)

777
Q

A responsibility is the work that a role performs.

A

Responsibility

777
Q

A responsibility is the work that a role performs.

A

Responsibility

778
Q

This plan defines staff acquisition, the timetable for staff acquisition, the staff release plan, training needs for the project team, any organizational compliance issues, rewards and

A

Resource Management Plan

778
Q

This plan defines staff acquisition, the timetable for staff acquisition, the staff release plan, training needs for the project team, any organizational compliance issues, rewards and

A

Resource Management Plan

779
Q

The project manager has the authority to reward the project team.

A

Reward

779
Q

The project manager has the authority to reward the project team.

A

Reward

780
Q

This denotes what a person is specifically responsible for in a project. Roles are usually tied to job titles, such as network engineer, mechanical engineer, and electrician.

A

Role

780
Q

This denotes what a person is specifically responsible for in a project. Roles are usually tied to job titles, such as network engineer, mechanical engineer, and electrician.

A

Role

781
Q

This approach smooths out the conflict by minimizing the perceived size of the problem. It is a temporary solution, but can calm team relations and boisterous discussions.

A

Smoothing

781
Q

This approach smooths out the conflict by minimizing the perceived size of the problem. It is a temporary solution, but can calm team relations and boisterous discussions.

A

Smoothing

782
Q

The project team struggles for project positions, leadership, and project direction. The project team can become hostile toward the project leader, challenge ideas, and try to establish and claim positions about the project work. The amount of debate and fury can vary depending on if the project team is willing to work together, the nature of the project, and the control of the project manager.

A

Storming

782
Q

The project team struggles for project positions, leadership, and project direction. The project team can become hostile toward the project leader, challenge ideas, and try to establish and claim positions about the project work. The amount of debate and fury can vary depending on if the project team is willing to work together, the nature of the project, and the control of the project manager.

A

Storming

783
Q

The project team identifies the disciplines and specialties that the project will require to complete the project scope statement. The technical interfaces are the resources that will be doing the project work.

A

Technical Interfaces

784
Q

This conflict resolution method sees one side of the argument walking away from the problem, usually in disgust.

A

Withdrawal

784
Q

This conflict resolution method sees one side of the argument walking away from the problem, usually in disgust.

A

Withdrawal

785
Q

The receiver signals that the message has been received. An acknowledgment shows receipt of the message, but not necessarily agreement with the message.

A

Acknowledgment

786
Q

The receiver confirms that the message is being received through feedback, questions, prompts for clarity, and other signs of confirmation.

A

Active Listening

786
Q

The receiver confirms that the message is being received through feedback, questions, prompts for clarity, and other signs of confirmation.

A

Active Listening

787
Q

The best modality to use when communicating that is relevant to the information being communicated.

A

Choice Of Media

787
Q

The best modality to use when communicating that is relevant to the information being communicated.

A

Choice Of Media

788
Q

Anything that the project management team believes to be true but hasn’t proven to be true. For example, the project management team may assume that all of the project team can be reached via cell phone, but parts of the world, as of this writing, don’t have a cell signal.

A

Communication Assumptions

788
Q

Anything that the project management team believes to be true but hasn’t proven to be true. For example, the project management team may assume that all of the project team can be reached via cell phone, but parts of the world, as of this writing, don’t have a cell signal.

A

Communication Assumptions

789
Q

Anything that prohibits communication from occurring.

A

Communication Barrier

789
Q

Anything that prohibits communication from occurring.

A

Communication Barrier

790
Q

N(N – 1)/2, where N represents the number of identified stakeholders. This formula reveals the total number of communication channels within a project.

A

Communication Channels Formula

790
Q

N(N – 1)/2, where N represents the number of identified stakeholders. This formula reveals the total number of communication channels within a project.

A

Communication Channels Formula

791
Q

Anything that limits the project management team’s options. When it comes to communication constraints, geographical locales, incompatible communications software, and even limited communications technology can constrain the project team.

A

Communication Constraints

791
Q

Anything that limits the project management team’s options. When it comes to communication constraints, geographical locales, incompatible communications software, and even limited communications technology can constrain the project team.

A

Communication Constraints

792
Q

A project management subsidiary plan that defines the stakeholders who need specific information, the person who will supply the information, the schedule for the information to be supplied, and the approved modality to provide the information.

A

Communications Management Plan

792
Q

A project management subsidiary plan that defines the stakeholders who need specific information, the person who will supply the information, the schedule for the information to be supplied, and the approved modality to provide the information.

A

Communications Management Plan

793
Q

The device that decodes a message as it is being received.

A

Decoder

793
Q

The device that decodes a message as it is being received.

A

Decoder

794
Q

The receiver is involved in the listening experience by paying attention to visual cues from the speaker and paralingual characteristics, and by asking relevant questions.

A

Effective Listening

794
Q

The receiver is involved in the listening experience by paying attention to visual cues from the speaker and paralingual characteristics, and by asking relevant questions.

A

Effective Listening

795
Q

The device that encodes the message being sent.

A

Encoder

795
Q

The device that encodes the message being sent.

A

Encoder

796
Q

The sender confirms that the receiver understands the message by directly asking for a response, questions for clarification, or other confirmation.

A

Feedback

796
Q

The sender confirms that the receiver understands the message by directly asking for a response, questions for clarification, or other confirmation.

A

Feedback

797
Q

Stakeholders are mapped on a grid based on their influence over the project in relation to their influence over the project execution.

A

Influence/Impact Grid

797
Q

Stakeholders are mapped on a grid based on their influence over the project in relation to their influence over the project execution.

A

Influence/Impact Grid

798
Q

A software package that allows the project management team to present the project’s health through graphics, spreadsheets, and text. (Think of Microsoft Project.)

A

Information Presentation Tools

798
Q

A software package that allows the project management team to present the project’s health through graphics, spreadsheets, and text. (Think of Microsoft Project.)

A

Information Presentation Tools

799
Q

A system to quickly and effectively store, archive, and access project information.

A

Information Retrieval System

799
Q

A system to quickly and effectively store, archive, and access project information.

A

Information Retrieval System

800
Q

This is the most common and most effective approach to communication. It’s where two or more people exchange information. Consider status meetings, ad-hoc meetings, phone calls, and videoconferences.

A

Interactive Communication

800
Q

This is the most common and most effective approach to communication. It’s where two or more people exchange information. Consider status meetings, ad-hoc meetings, phone calls, and videoconferences.

A

Interactive Communication

801
Q

This is documentation of what did and did not work in the project implementation. Lessons learned documentation is created throughout the project by the entire project team. When lessons learned sessions are completed, they’re available to be used and applied by the entire organization. They are now part of the organizational process assets.

A

Lessons Learned

801
Q

This is documentation of what did and did not work in the project implementation. Lessons learned documentation is created throughout the project by the entire project team. When lessons learned sessions are completed, they’re available to be used and applied by the entire organization. They are now part of the organizational process assets.

A

Lessons Learned

802
Q

The device or technology that transports a message.

A

Medium

802
Q

The device or technology that transports a message.

A

Medium

803
Q

Anything that interferes with or disrupts a message.

A

Noise

804
Q

Facial expressions, hand gestures, and body language are nonverbal cues that contribute to a message. Approximately 55 percent of communication is nonverbal.

A

Nonverbal

805
Q

The pitch, tone, and inflections in the sender’s voice affecting the message being sent.

A

Paralingual

805
Q

The pitch, tone, and inflections in the sender’s voice affecting the message being sent.

A

Paralingual

806
Q

A report that depicts how well a project is performing. Often, the performance report is based on earned value management and may include cost or schedule variance reports.

A

Performance Report

806
Q

A report that depicts how well a project is performing. Often, the performance report is based on earned value management and may include cost or schedule variance reports.

A

Performance Report

807
Q

Presentations are useful in providing information to customers, management, the project team, and other stakeholders.

A

Project Presentations

808
Q

All the business of the project communications is also part of the organizational process assets. This includes e-mails, memos, letters, and faxes.

A

Project Records

808
Q

All the business of the project communications is also part of the organizational process assets. This includes e-mails, memos, letters, and faxes.

A

Project Records

809
Q

Reports are formal communications on project activities, their status, and conditions.

A

Project Reports

810
Q

This approach pulls the information from a central repository, like a database of information. Pull communications are good for large groups of stakeholders who want to access project information at their discretion. Consider a project web site where stakeholders can periodically drop by for a quick update on the project status.

A

Pull Communication

810
Q

This approach pulls the information from a central repository, like a database of information. Pull communications are good for large groups of stakeholders who want to access project information at their discretion. Consider a project web site where stakeholders can periodically drop by for a quick update on the project status.

A

Pull Communication

811
Q

This approach pushes the information from the sender to the receiver without any real acknowledgment that the information was really received or understood. Consider letters, faxes, voicemail messages, e-mails, and other communications modalities that the sender packages and sends to receivers through some intermediary network.

A

Push Communication

811
Q

This approach pushes the information from the sender to the receiver without any real acknowledgment that the information was really received or understood. Consider letters, faxes, voicemail messages, e-mails, and other communications modalities that the sender packages and sends to receivers through some intermediary network.

A

Push Communication

812
Q

The person who receives the message.

A

Receiver

812
Q

The person who receives the message.

A

Receiver

813
Q

The person who is sending the message.

A

Sender

813
Q

The person who is sending the message.

A

Sender

814
Q

Feedback loops and barriers to communications.

A

Sender–Receiver Models

814
Q

Feedback loops and barriers to communications.

A

Sender–Receiver Models

815
Q

Notices to the stakeholders about resolved issues, approved changes, and the overall health of the project.

A

Stakeholder Notifications

815
Q

Notices to the stakeholders about resolved issues, approved changes, and the overall health of the project.

A

Stakeholder Notifications

816
Q

A regularly scheduled meeting to discuss the status of the project and its progress toward completing the project scope statement.

A

Status Review Meeting

816
Q

A regularly scheduled meeting to discuss the status of the project and its progress toward completing the project scope statement.

A

Status Review Meeting

817
Q

A system to record the actual time to complete project activities.

A

Time Reporting System

817
Q

A system to record the actual time to complete project activities.

A

Time Reporting System

818
Q

A risk response appropriate for both positive and negative risks, but often used for smaller risks within a project.

A

Acceptance

818
Q

A risk response appropriate for both positive and negative risks, but often used for smaller risks within a project.

A

Acceptance

819
Q

Risks that have an uncertain, unclear nature, such as new laws or regulations, the marketplace conditions, and other risks that are nearly impossible to predict.

A

Ambiguity Risks

819
Q

Risks that have an uncertain, unclear nature, such as new laws or regulations, the marketplace conditions, and other risks that are nearly impossible to predict.

A

Ambiguity Risks

820
Q

A risk response to avoid the risk.

A

Avoidance

820
Q

A risk response to avoid the risk.

A

Avoidance

821
Q

The most common approach to risk identification; usually completed by a project team with subject matter experts to identify the risks within the project.

A

Brainstorming

822
Q

These risks may have negative or positive outcomes. Examples include using a less experienced worker to complete a task, allowing phases or activities to overlap, or forgoing the expense of formal training for on-the-job education.

A

Business Risks

822
Q

These risks may have negative or positive outcomes. Examples include using a less experienced worker to complete a task, allowing phases or activities to overlap, or forgoing the expense of formal training for on-the-job education.

A

Business Risks

823
Q

A ranking approach to identify the probability and impact by using a numerical value, from .01 (very low) to 1.0 (certain).

A

Cardinal Scales

824
Q

A quick and cost-effective risk identification approach.

A

Checklists

824
Q

A quick and cost-effective risk identification approach.

A

Checklists

825
Q

The consideration of the risk ranking scores that takes into account any bias, the accuracy of the data submitted, and the reliability of the nature of the data submitted.

A

Data Precision

825
Q

The consideration of the risk ranking scores that takes into account any bias, the accuracy of the data submitted, and the reliability of the nature of the data submitted.

A

Data Precision

826
Q

A method to determine which of two or more decisions is the best one. The model examines the costs and benefits of each decision’s outcome and weighs the probability of success for each of the decisions.

A

Decision Tree

826
Q

A method to determine which of two or more decisions is the best one. The model examines the costs and benefits of each decision’s outcome and weighs the probability of success for each of the decisions.

A

Decision Tree

827
Q

An anonymous method of querying experts about foreseeable risks within a project, phase, or component of a project. The results of the survey are analyzed by a third party, organized, and then circulated to the experts. There can be several rounds of anonymous discussion with the Delphi Technique, without fear of backlash or offending other participants in the process. The goal is to gain consensus on project risks within the project.

A

Delphi Technique

827
Q

An anonymous method of querying experts about foreseeable risks within a project, phase, or component of a project. The results of the survey are analyzed by a third party, organized, and then circulated to the experts. There can be several rounds of anonymous discussion with the Delphi Technique, without fear of backlash or offending other participants in the process. The goal is to gain consensus on project risks within the project.

A

Delphi Technique

828
Q

A risk response that attempts to enhance the conditions to ensure that a positive risk event will likely happen.

A

Enhancing

828
Q

A risk response that attempts to enhance the conditions to ensure that a positive risk event will likely happen.

A

Enhancing

829
Q

A risk response that is appropriate for both positive and negative risk events that may outside of the project manager’s authority to act upon.

A

Escalating

829
Q

A risk response that is appropriate for both positive and negative risk events that may outside of the project manager’s authority to act upon.

A

Escalating

830
Q

The monetary value of a risk exposure based on the risk’s probability and impact in the risk matrix. This approach is typically used in quantitative risk analysis because it quantifies the risk exposure.

A

Expected Monetary Value (Emv)

830
Q

The monetary value of a risk exposure based on the risk’s probability and impact in the risk matrix. This approach is typically used in quantitative risk analysis because it quantifies the risk exposure.

A

Expected Monetary Value (Emv)

831
Q

A risk response that takes advantage of the positive risks within a project.

A

Exploit

831
Q

A risk response that takes advantage of the positive risks within a project.

A

Exploit

832
Q

These risks are outside of the project, but directly affect it—for example, legal issues, labor issues, a shift in project priorities, or weather. “Force majeure” risks call for disaster recovery rather than project management. These are risks caused by earthquakes, tornadoes, floods, civil unrest, and other disasters.

A

External Risks

832
Q

These risks are outside of the project, but directly affect it—for example, legal issues, labor issues, a shift in project priorities, or weather. “Force majeure” risks call for disaster recovery rather than project management. These are risks caused by earthquakes, tornadoes, floods, civil unrest, and other disasters.

A

External Risks

833
Q

System or process flowcharts show the relationship between components and how the overall process works. These are useful for identifying risks between system components.

A

Flowcharts

833
Q

System or process flowcharts show the relationship between components and how the overall process works. These are useful for identifying risks between system components.

A

Flowcharts

834
Q

An influence diagram charts out a decision problem. It identifies all of the elements, variables, decisions, and objectives and also how each factor may influence another.

A

Influence Diagrams

834
Q

An influence diagram charts out a decision problem. It identifies all of the elements, variables, decisions, and objectives and also how each factor may influence another.

A

Influence Diagrams

835
Q

These cause-and-effect diagrams are also called fishbone diagrams and are used to find the root cause of factors that are causing risks within the project.

A

Ishikawa Diagrams

835
Q

These cause-and-effect diagrams are also called fishbone diagrams and are used to find the root cause of factors that are causing risks within the project.

A

Ishikawa Diagrams

836
Q

Low-priority risks are identified and assigned to a watch list for periodic monitoring.

A

Low-Priority Risk Watch List

836
Q

Low-priority risks are identified and assigned to a watch list for periodic monitoring.

A

Low-Priority Risk Watch List

837
Q

A risk response effort to reduce the probability and/or impact of an identified risk in the project.

A

Mitigation

837
Q

A risk response effort to reduce the probability and/or impact of an identified risk in the project.

A

Mitigation

838
Q

A simulation technique that got its name from the casinos of Monte Carlo, Monaco. The simulation is completed using a computer software program that can simulate a project, using values for all possible variables, to predict the most likely model.

A

Monte Carlo Technique

838
Q

A simulation technique that got its name from the casinos of Monte Carlo, Monaco. The simulation is completed using a computer software program that can simulate a project, using values for all possible variables, to predict the most likely model.

A

Monte Carlo Technique

839
Q

A ranking approach that identifies and ranks the risks from very high to very unlikely or to some other value.

A

Ordinal Scales

839
Q

A ranking approach that identifies and ranks the risks from very high to very unlikely or to some other value.

A

Ordinal Scales

840
Q

The performing organization can contribute to the project’s risks through unreasonable cost, time, and scope expectations; poor project prioritization; inadequate funding or the disruption of funding; and competition with other projects for internal resources.

A

Organizational Risks

840
Q

The performing organization can contribute to the project’s risks through unreasonable cost, time, and scope expectations; poor project prioritization; inadequate funding or the disruption of funding; and competition with other projects for internal resources.

A

Organizational Risks

841
Q

A prompt list used for risk identification. PESTLE examines risks in the Political, Economic, Social, Technological, Legal, and Environmental domains.

A

Pestle

841
Q

A prompt list used for risk identification. PESTLE examines risks in the Political, Economic, Social, Technological, Legal, and Environmental domains.

A

Pestle

842
Q

A matrix that ranks the probability of a risk event occurring and its impact on the project if the event does happen; used in qualitative and quantitative risk analyses.

A

Probability And Impact Matrix

842
Q

A matrix that ranks the probability of a risk event occurring and its impact on the project if the event does happen; used in qualitative and quantitative risk analyses.

A

Probability And Impact Matrix

843
Q

These risks deal with faults in the management of the project: the unsuccessful allocation of time, resources, and scheduling; unacceptable work results; and poor project management.

A

Project Management Risks

843
Q

These risks deal with faults in the management of the project: the unsuccessful allocation of time, resources, and scheduling; unacceptable work results; and poor project management.

A

Project Management Risks

844
Q

These risks have only a negative outcome. Examples include loss of life or limb, fire, theft, natural disasters, and the like.

A

Pure Risks

844
Q

These risks have only a negative outcome. Examples include loss of life or limb, fire, theft, natural disasters, and the like.

A

Pure Risks

845
Q

This approach “qualifies” the risks that have been identified in the project. Specifically, qualitative risk analysis examines and prioritizes risks based on their probability of occurring and their impact on the project should they occur.

A

Qualitative Risk Analysis

845
Q

This approach “qualifies” the risks that have been identified in the project. Specifically, qualitative risk analysis examines and prioritizes risks based on their probability of occurring and their impact on the project should they occur.

A

Qualitative Risk Analysis

846
Q

This approach attempts to numerically assess the probability and impact of the identified risks. It also creates an overall risk score for the project. This method is more in-depth than qualitative risk analysis and relies on several different tools to accomplish its goal.

A

Quantitative Risk Analysis

846
Q

This approach attempts to numerically assess the probability and impact of the identified risks. It also creates an overall risk score for the project. This method is more in-depth than qualitative risk analysis and relies on several different tools to accomplish its goal.

A

Quantitative Risk Analysis

847
Q

An ordinal scale that uses red, amber, and green (RAG) to capture the probability, impact, and risk score.

A

Rag Rating

847
Q

An ordinal scale that uses red, amber, and green (RAG) to capture the probability, impact, and risk score.

A

Rag Rating

848
Q

Risks that are expected to remain after a risk response.

A

Residual Risks

848
Q

Risks that are expected to remain after a risk response.

A

Residual Risks

849
Q

A project risk is an uncertain event or condition that can have a positive or negative impact on the project.

A

Risk

850
Q

The systematic process of combing through the project, the project plan, the work breakdown structure, and all supporting documentation to identify as many risks that may affect the project as possible.

A

Risk Identification

850
Q

The systematic process of combing through the project, the project plan, the work breakdown structure, and all supporting documentation to identify as many risks that may affect the project as possible.

A

Risk Identification

851
Q

A project management subsidiary plan that defines how risks will be identified, analyzed, responded to, and monitored within the project. The plan also defines the iterative risk management process that the project is expected to adhere to.

A

Risk Management Plan

852
Q

The agreed-upon approach to the management of the project risk processes.

A

Risk Management Planning

852
Q

The agreed-upon approach to the management of the project risk processes.

A

Risk Management Planning

853
Q

The individuals or entities that are responsible for monitoring and responding to an identified risk within the project.

A

Risk Owners

853
Q

The individuals or entities that are responsible for monitoring and responding to an identified risk within the project.

A

Risk Owners

854
Q

The risk register is a project plan component that contains all of the information related to the risk management activities. It’s updated as risk management activities are conducted to reflect the status, progress, and nature of the project risks.

A

Risk Register

854
Q

The risk register is a project plan component that contains all of the information related to the risk management activities. It’s updated as risk management activities are conducted to reflect the status, progress, and nature of the project risks.

A

Risk Register

855
Q

The risk report explains the overall project risks and provides summaries about the individual project risks.

A

Risk Report

855
Q

The risk report explains the overall project risks and provides summaries about the individual project risks.

A

Risk Report

856
Q

An audit to test the validity of the established risk responses.

A

Risk Response Audit

856
Q

An audit to test the validity of the established risk responses.

A

Risk Response Audit

857
Q

The level of ownership an individual or entity has over a project risk.

A

Risk Responsibilities

857
Q

The level of ownership an individual or entity has over a project risk.

A

Risk Responsibilities

858
Q

The calculated score based on each risk’s probability and impact. The approach can be used in both qualitative and quantitative risk analysis.

A

Risk Score

858
Q

The calculated score based on each risk’s probability and impact. The approach can be used in both qualitative and quantitative risk analysis.

A

Risk Score

859
Q

Root cause identification aims to find out why a risk event may be occurring, the causal factors for the risk events, and then, eventually, how the events can be mitigated or eliminated.

A

Root Cause Identification

859
Q

Root cause identification aims to find out why a risk event may be occurring, the causal factors for the risk events, and then, eventually, how the events can be mitigated or eliminated.

A

Root Cause Identification

860
Q

New risks that are created as a result of a risk response.

A

Secondary Risks

860
Q

New risks that are created as a result of a risk response.

A

Secondary Risks

861
Q

A quantitative risk analysis tool that examines each risk to determine which one has the largest impact on the project’s success.

A

Sensitivity Analysis

861
Q

A quantitative risk analysis tool that examines each risk to determine which one has the largest impact on the project’s success.

A

Sensitivity Analysis

862
Q

A risk response that shares the advantages of a positive risk within a project.

A

Sharing

862
Q

A risk response that shares the advantages of a positive risk within a project.

A

Sharing

863
Q

SWOT analysis is the process of examining the project from the perspective of each characteristic: strengths, weaknesses, opportunities, and threats.

A

Swot Analysis

863
Q

SWOT analysis is the process of examining the project from the perspective of each characteristic: strengths, weaknesses, opportunities, and threats.

A

Swot Analysis

864
Q

A prompt list used in risk identification to examine the Technical, Environmental, Commercial, Operational, and Political factors of the project.

A

Tecop

864
Q

A prompt list used in risk identification to examine the Technical, Environmental, Commercial, Operational, and Political factors of the project.

A

Tecop

865
Q

Technical risks are associated with new, unproven, or complex technologies being used on the project. Changes to the technology during the project implementation can also be a risk. Quality risks are the levels set for expectations of impractical quality and performance.

A

Technical, Quality, Or Performance Risks

865
Q

Technical risks are associated with new, unproven, or complex technologies being used on the project. Changes to the technology during the project implementation can also be a risk. Quality risks are the levels set for expectations of impractical quality and performance.

A

Technical, Quality, Or Performance Risks

866
Q

A risk response that transfers the ownership of the risk to another party. Insurance, licensed contractors, or other project teams are good examples of transference. A fee and contractual relationships are typically involved with the transference of a risk.

A

Transference

866
Q

A risk response that transfers the ownership of the risk to another party. Insurance, licensed contractors, or other project teams are good examples of transference. A fee and contractual relationships are typically involved with the transference of a risk.

A

Transference

867
Q

A type of risk based on the variations that may occur in the project, such as production, number of quality errors, or even the weather.

A

Variability Risks

867
Q

A type of risk based on the variations that may occur in the project, such as production, number of quality errors, or even the weather.

A

Variability Risks

868
Q

A prompt list used in risk identification that examines the Volatility, Uncertainty, Complexity, and Ambiguity of risk factors within the project.

A

Vuca

868
Q

A prompt list used in risk identification that examines the Volatility, Uncertainty, Complexity, and Ambiguity of risk factors within the project.

A

Vuca

869
Q

When there is an issue or claim that must be settled before the contract can be closed, the parties involved in the issue or claim will try to reach a settlement through mediation or arbitration.

A

Alternative Dispute Resolution

870
Q

From seller to buyer. Price is the determining factor in the decision-making process.

A

Bid

870
Q

From seller to buyer. Price is the determining factor in the decision-making process.

A

Bid

871
Q

A meeting of all the project’s potential vendors to clarify the contract statement of work and the details of the contracted work.

A

Bidder Conference

871
Q

A meeting of all the project’s potential vendors to clarify the contract statement of work and the details of the contracted work.

A

Bidder Conference

872
Q

These are disagreements between the buyer and the seller, usually centering on a change, who did the change, and even whether a change has occurred. Claims are also called disputes and appeals, and are monitored and controlled through the project in accordance with the contract terms.

A

Claims

872
Q

These are disagreements between the buyer and the seller, usually centering on a change, who did the change, and even whether a change has occurred. Claims are also called disputes and appeals, and are monitored and controlled through the project in accordance with the contract terms.

A

Claims

873
Q

A contract is a formal agreement between the buyer and the seller. Contracts can be oral or written—though written is preferred.

A

Contract

874
Q

This defines the procedures for how the contract may be changed. The process for changing the contract includes the forms; documented communications; tracking; conditions within the project, business, or marketplace that justify the needed change; dispute resolution procedures; and the procedures for getting the changes approved within the performing organization.

A

Contract Change Control System

874
Q

This defines the procedures for how the contract may be changed. The process for changing the contract includes the forms; documented communications; tracking; conditions within the project, business, or marketplace that justify the needed change; dispute resolution procedures; and the procedures for getting the changes approved within the performing organization.

A

Contract Change Control System

875
Q

This document requires that the seller fully describe the work to be completed and/or the product to be supplied. The SOW becomes part of the contract between the buyer and the seller.

A

Contract Statement Of Work (Sow Also Csow)

875
Q

This document requires that the seller fully describe the work to be completed and/or the product to be supplied. The SOW becomes part of the contract between the buyer and the seller.

A

Contract Statement Of Work (Sow Also Csow)

876
Q

A contract that pays the vendor all costs for the project, but also includes a buyer- determined award fee for the project work.

A

Cost Plus Award Fee Contract

876
Q

A contract that pays the vendor all costs for the project, but also includes a buyer- determined award fee for the project work.

A

Cost Plus Award Fee Contract

877
Q

A contract that requires the buyer to pay for the cost of the goods and services procured plus a fixed fee for the contracted work. The buyer assumes the risk of a cost overrun.

A

Cost Plus Fixed Fee Contract

877
Q

A contract that requires the buyer to pay for the cost of the goods and services procured plus a fixed fee for the contracted work. The buyer assumes the risk of a cost overrun.

A

Cost Plus Fixed Fee Contract

878
Q

A contract type that requires the buyer to pay a cost for the procured work, plus an incentive fee, or a bonus, for the work if terms and conditions are met.

A

Cost Plus Incentive Fee

878
Q

A contract type that requires the buyer to pay a cost for the procured work, plus an incentive fee, or a bonus, for the work if terms and conditions are met.

A

Cost Plus Incentive Fee

879
Q

A contract that requires the buyer to pay for the costs of the goods and services procured plus a percentage of the costs. The buyer assumes all of the risks for cost overruns.

A

Cost Plus Percentage Of Costs

879
Q

A contract that requires the buyer to pay for the costs of the goods and services procured plus a percentage of the costs. The buyer assumes all of the risks for cost overruns.

A

Cost Plus Percentage Of Costs

880
Q

These are costs incurred by the project in order for the project to exist. Examples include the equipment needed to complete the project work, salaries of the project team, and other expenses tied directly to the project’s existence.

A

Direct Costs

880
Q

These are costs incurred by the project in order for the project to exist. Examples include the equipment needed to complete the project work, salaries of the project team, and other expenses tied directly to the project’s existence.

A

Direct Costs

881
Q

Also known as firm fixed-price and lump- sum contracts, these are agreements that define a total price for the product the seller is to provide.

A

Fixed-Price Contracts

881
Q

Also known as firm fixed-price and lump- sum contracts, these are agreements that define a total price for the product the seller is to provide.

A

Fixed-Price Contracts

882
Q

A fixed-price contract with opportunities for bonuses for meeting goals on costs, schedule, and other objectives. These contracts usually have a price ceiling for costs and associated bonuses.

A

Fixed-Price Incentive Fee

882
Q

A fixed-price contract with opportunities for bonuses for meeting goals on costs, schedule, and other objectives. These contracts usually have a price ceiling for costs and associated bonuses.

A

Fixed-Price Incentive Fee

883
Q

A fixed-price contract with a special allowance for price increases based on economic reasons such as inflation or the cost of raw materials.

A

Fixed-Price With Economic Price Adjustments

883
Q

A fixed-price contract with a special allowance for price increases based on economic reasons such as inflation or the cost of raw materials.

A

Fixed-Price With Economic Price Adjustments

884
Q

An “act of God” that may have a negative impact on the project. Examples include fire, hurricanes, tornadoes, and earthquakes.

A

Force Majeure

884
Q

An “act of God” that may have a negative impact on the project. Examples include fire, hurricanes, tornadoes, and earthquakes.

A

Force Majeure

885
Q

These estimates are often referred to as “should cost” estimates. They are created by the performing organization or outside experts to predict what the cost of the procured product should be.

A

Independent Estimates

885
Q

These estimates are often referred to as “should cost” estimates. They are created by the performing organization or outside experts to predict what the cost of the procured product should be.

A

Independent Estimates

886
Q

These are costs attributed to the cost of doing business. Examples include utilities, office space, and other overhead costs.

A

Indirect Costs

886
Q

These are costs attributed to the cost of doing business. Examples include utilities, office space, and other overhead costs.

A

Indirect Costs

887
Q

From buyer to seller. Requests the seller to provide a price for the procured product or service.

A

Invitation For Bid (Ifb)

887
Q

From buyer to seller. Requests the seller to provide a price for the procured product or service.

A

Invitation For Bid (Ifb)

888
Q

A letter contract allows the vendor to begin working on the project immediately. It is often used as a stopgap solution.

A

Letter Contract

888
Q

A letter contract allows the vendor to begin working on the project immediately. It is often used as a stopgap solution.

A

Letter Contract

889
Q

A letter of intent is not a contract, but a letter stating that the buyer is intending to create a contractual relationship with the seller.

A

Letter Of Intent

889
Q

A letter of intent is not a contract, but a letter stating that the buyer is intending to create a contractual relationship with the seller.

A

Letter Of Intent

890
Q

A process in which the project management team determines the cost- effectiveness, benefits, and feasibility of making a product or buying it from a vendor.

A

Make-Or-Buy Decision

890
Q

A process in which the project management team determines the cost- effectiveness, benefits, and feasibility of making a product or buying it from a vendor.

A

Make-Or-Buy Decision

891
Q

The contractual relationship between the buyer and the seller is often considered confidential and secret.

A

Privity

891
Q

The contractual relationship between the buyer and the seller is often considered confidential and secret.

A

Privity

892
Q

A project management subsidiary plan that documents the decisions made in the procurement planning processes.

A

Procurement Management Plan

892
Q

A project management subsidiary plan that documents the decisions made in the procurement planning processes.

A

Procurement Management Plan

893
Q

A process to identify which parts of the project warrant procurement from a vendor by the buyer.

A

Procurement Planning

893
Q

A process to identify which parts of the project warrant procurement from a vendor by the buyer.

A

Procurement Planning

894
Q

A document the seller provides to the buyer. The proposal includes more than just a fee for the proposed work. It also includes information on the vendor’s skills, the vendor’s reputation, and ideas on how the vendor can complete the contracted work for the buyer.

A

Proposal

894
Q

A document the seller provides to the buyer. The proposal includes more than just a fee for the proposed work. It also includes information on the vendor’s skills, the vendor’s reputation, and ideas on how the vendor can complete the contracted work for the buyer.

A

Proposal

895
Q

A purchase order is a form of unilateral contract that the buyer provides to the vendor showing that the purchase has been approved by the buyer’s organization.

A

Purchase Order (Po)

895
Q

A purchase order is a form of unilateral contract that the buyer provides to the vendor showing that the purchase has been approved by the buyer’s organization.

A

Purchase Order (Po)

896
Q

From seller to buyer. Price is the determining factor in the decision-making process.

A

Quotation

896
Q

From seller to buyer. Price is the determining factor in the decision-making process.

A

Quotation

897
Q

From buyer to seller. Requests the seller to provide a proposal to complete the procured work or to provide the procured product.

A

Request For Proposal (Rfp)

897
Q

From buyer to seller. Requests the seller to provide a proposal to complete the procured work or to provide the procured product.

A

Request For Proposal (Rfp)

898
Q

From buyer to seller. Requests the seller to provide a price for the procured product or service.

A

Request For Quote (Rfq)

898
Q

From buyer to seller. Requests the seller to provide a price for the procured product or service.

A

Request For Quote (Rfq)

899
Q

When the project management team decides to use transference to respond to a risk, a risk-related contractual agreement is created between the buyer and the seller.

A

Risk-Related Contractual Agreements

899
Q

When the project management team decides to use transference to respond to a risk, a risk-related contractual agreement is created between the buyer and the seller.

A

Risk-Related Contractual Agreements

900
Q

A tool that filters or screens out vendors that don’t qualify for the contract.

A

Screening System

900
Q

A tool that filters or screens out vendors that don’t qualify for the contract.

A

Screening System

901
Q

These are used by organizations to rate prior experience with each vendor that they have worked with in the past. The seller rating system can track performance, quality ratings, delivery, and even contract compliance.

A

Seller Rating Systems

901
Q

These are used by organizations to rate prior experience with each vendor that they have worked with in the past. The seller rating system can track performance, quality ratings, delivery, and even contract compliance.

A

Seller Rating Systems

902
Q

Defines the obligations for the seller, what the seller will provide, and all of the particulars of the contracted work. Terms of reference is similar to the statement of work.

A

Terms Of Reference

902
Q

Defines the obligations for the seller, what the seller will provide, and all of the particulars of the contracted work. Terms of reference is similar to the statement of work.

A

Terms Of Reference

903
Q

A contract type in which the buyer pays for the time and materials for the procured work. This is a simple contract, usually for smaller procurement conditions. These contract types require a not-to-exceed clause, or the buyer assumes the risk for cost overruns.

A

Time And Materials Contract

903
Q

A contract type in which the buyer pays for the time and materials for the procured work. This is a simple contract, usually for smaller procurement conditions. These contract types require a not-to-exceed clause, or the buyer assumes the risk for cost overruns.

A

Time And Materials Contract

904
Q

This takes out the personal preferences of the decision maker in the organization to ensure that the best seller is awarded the contract. Weights are assigned to the values of the proposals, and each proposal is scored.

A

Weighting System

904
Q

This takes out the personal preferences of the decision maker in the organization to ensure that the best seller is awarded the contract. Weights are assigned to the values of the proposals, and each proposal is scored.

A

Weighting System

905
Q

This type of communication means that information is happening among stakeholders, like in a forum. Examples of interactive communications are meetings, videoconferences, phone calls, and ad-hoc conversations. Interactive communications means that the participants are actively communicating with one another.

A

Interactive Communications

905
Q

This type of communication means that information is happening among stakeholders, like in a forum. Examples of interactive communications are meetings, videoconferences, phone calls, and ad-hoc conversations. Interactive communications means that the participants are actively communicating with one another.

A

Interactive Communications

906
Q

A data gathering technique that’s similar to brainstorming, but provides brainstorming meeting participants with the questions and topics for brainstorming before the stakeholder identification meeting.

A

Brain Writing

906
Q

A data gathering technique that’s similar to brainstorming, but provides brainstorming meeting participants with the questions and topics for brainstorming before the stakeholder identification meeting.

A

Brain Writing

907
Q

Stakeholders—such as management, the project manager, program manager, or customers—that have the authority to make decisions in the project.

A

Key Stakeholder

907
Q

Stakeholders—such as management, the project manager, program manager, or customers—that have the authority to make decisions in the project.

A

Key Stakeholder

908
Q

Part of stakeholder analysis classification. A leading stakeholder is aware of your project, they want your project to be successful, and the stakeholder is working to make certain the project is a success.

A

Leading Stakeholder Status

908
Q

Part of stakeholder analysis classification. A leading stakeholder is aware of your project, they want your project to be successful, and the stakeholder is working to make certain the project is a success.

A

Leading Stakeholder Status

909
Q

A stakeholder who does not want the project to exist and is opposed to the project.

A

Negative Stakeholder

909
Q

A stakeholder who does not want the project to exist and is opposed to the project.

A

Negative Stakeholder

910
Q

A stakeholder who has neither a positive nor negative attitude about the project’s existence.

A

Neutral Stakeholder

910
Q

A stakeholder who has neither a positive nor negative attitude about the project’s existence.

A

Neutral Stakeholder

911
Q

Part of stakeholder analysis classification. A neutral stakeholder is aware of your project and is not concerned if the project succeeds or fails.

A

Neutral Stakeholder Status

911
Q

Part of stakeholder analysis classification. A neutral stakeholder is aware of your project and is not concerned if the project succeeds or fails.

A

Neutral Stakeholder Status

912
Q

A stakeholder who sees the benefits of the project and is in favor of the change the project is to bring about.

A

Positive Stakeholder

912
Q

A stakeholder who sees the benefits of the project and is in favor of the change the project is to bring about.

A

Positive Stakeholder

913
Q

This is an analysis meeting to examine and document the roles in the project. The role’s interests, concerns, influence, project knowledge, and attitude are documented.

A

Profile Analysis Meeting

913
Q

This is an analysis meeting to examine and document the roles in the project. The role’s interests, concerns, influence, project knowledge, and attitude are documented.

A

Profile Analysis Meeting

914
Q

This type of communication pulls information from a central repository. Pull communications allow stakeholders to retrieve information from a central source as needed.

A

Pull Communications

914
Q

This type of communication pulls information from a central repository. Pull communications allow stakeholders to retrieve information from a central source as needed.

A

Pull Communications

915
Q

This type of communication happens when the sender pushes the same message to multiple people. Good examples of push communications are broadcast text messages, faxes, press releases, and group e-mails.

A

Push Communications

915
Q

This type of communication happens when the sender pushes the same message to multiple people. Good examples of push communications are broadcast text messages, faxes, press releases, and group e-mails.

A

Push Communications

916
Q

A reporting system is a software program to store and analyze project data for reporting. A common reporting system will take project data, allow the project manager to pass the data through earned value management, for example, and then create forecasting reports about the project costs and schedule.

A

Reporting System

916
Q

A reporting system is a software program to store and analyze project data for reporting. A common reporting system will take project data, allow the project manager to pass the data through earned value management, for example, and then create forecasting reports about the project costs and schedule.

A

Reporting System

917
Q

Part of stakeholder analysis classification. A resistant stakeholder is aware of your project, but they do not support the changes your project will create.

A

Resistant Stakeholder Status

917
Q

Part of stakeholder analysis classification. A resistant stakeholder is aware of your project, but they do not support the changes your project will create.

A

Resistant Stakeholder Status

918
Q

Anyone who is affected by the existence of the project or who can affect the project’s existence. Stakeholders can enter and exit the project as conditions change within the project.

A

Stakeholder

919
Q

An activity that ranks stakeholders based on their influence, interests, and expectations of the project. Stakeholders are identified and ranked, and then their needs and expectations are documented and addressed.

A

Stakeholder Analysis

919
Q

An activity that ranks stakeholders based on their influence, interests, and expectations of the project. Stakeholders are identified and ranked, and then their needs and expectations are documented and addressed.

A

Stakeholder Analysis

920
Q

These are charts and diagrams that help the project manager determine the influence of stakeholders in relation to their interest in the project. Common classification models include the power/interest grid, the power/influence grid, the influence/impact grid, and the salience model.

A

Stakeholder Classification Models

920
Q

These are charts and diagrams that help the project manager determine the influence of stakeholders in relation to their interest in the project. Common classification models include the power/interest grid, the power/influence grid, the influence/impact grid, and the salience model.

A

Stakeholder Classification Models

921
Q

The project manager works to keep the project stakeholders interested, involved, and supportive of the project. Through communication, management skills, and interpersonal skills, the project manager can work to keep the project stakeholders engaged and interested in the project.

A

Stakeholder Engagement

922
Q

A project initiation activity to identify, document, and classify the project stakeholders as early as possible in the project.

A

Stakeholder Identification

922
Q

A project initiation activity to identify, document, and classify the project stakeholders as early as possible in the project.

A

Stakeholder Identification

923
Q

The project management knowledge area that focuses on the management and engagement of the project stakeholders. There are four processes in this knowledge area: identify stakeholders, plan stakeholder management, manage stakeholder engagement, and Monitor Stakeholder Engagement.

A

Stakeholder Management

923
Q

The project management knowledge area that focuses on the management and engagement of the project stakeholders. There are four processes in this knowledge area: identify stakeholders, plan stakeholder management, manage stakeholder engagement, and Monitor Stakeholder Engagement.

A

Stakeholder Management

924
Q

The stakeholder engagement plan documents a strategy for managing the engagement of project stakeholders. The stakeholder engagement plan establishes stakeholder engagement and defines how the project manager can increase and improve stakeholder engagement.

A

Stakeholder Engagement Plan

924
Q

The stakeholder engagement plan documents a strategy for managing the engagement of project stakeholders. The stakeholder engagement plan establishes stakeholder engagement and defines how the project manager can increase and improve stakeholder engagement.

A

Stakeholder Engagement Plan

925
Q

The project manager works with the project team and subject matter experts to create a strategy to manage the project stakeholders.

A

Stakeholder Engagement Planning

925
Q

The project manager works with the project team and subject matter experts to create a strategy to manage the project stakeholders.

A

Stakeholder Engagement Planning

926
Q

A documentation of each stakeholder’s contact information, position, concerns, interests, and attitude toward the project. The project manager updates the register as new stakeholders are identified and when stakeholders leave the project.

A

Stakeholder Register

926
Q

A documentation of each stakeholder’s contact information, position, concerns, interests, and attitude toward the project. The project manager updates the register as new stakeholders are identified and when stakeholders leave the project.

A

Stakeholder Register

927
Q

This is part of stakeholder analysis classification. A supportive stakeholder is aware of your project and is supportive and hopeful that the project will be successful.

A

Supportive Stakeholder Status

927
Q

This is part of stakeholder analysis classification. A supportive stakeholder is aware of your project and is supportive and hopeful that the project will be successful.

A

Supportive Stakeholder Status

928
Q

Part of stakeholder analysis classification. An unaware status means the stakeholder doesn’t know about the project and the effect the project may create on the stakeholder.

A

Unaware Stakeholder Status

928
Q

Part of stakeholder analysis classification. An unaware status means the stakeholder doesn’t know about the project and the effect the project may create on the stakeholder.

A

Unaware Stakeholder Status