Air Refueling Visual Signals Flashcards
boom in trail- extended
ready for contact
boom in trail-fully extended
tanker in manual operation without tanker disconnect capability
OR
ack receiver’s manual boom latching signal
boom in trail-fully retracted
offload complete
boom stowed-fully retracted
tanker AR system inop
boom stowed- 0 deg elevation, extended 5 feet
system malfunction
tanker and receiver check air refueling systems
flashing PDI lights and/or lower rotating beacon ON (tanker)
BREAKAWAY
PDI lights extinguished during contact
tanker request for disconnect, receiver returns to pre-contact
receiver closing and opening receptacle door while in pre-contact position
emergency boom latch request
OR
ack tanker’s manual operation without tanker disconnect capability
steady light or rocking wings (receiver)
emergency fuel shortage exists
flashing light from receiver cockpit area
initiate toboggan maneuver
same receiver returns to pre-contact with receptacle door open
DAY: pilot signals closed fist, thumb to mouth plus hand signaling number
NIGHT: same receiver returns to pre-contact with receptacle door open, ready for contact
additional fuel required- EMCON 2-4