AIA Contracts Flashcards

1
Q

A101

A

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

This contract is used when project price is based on a 1sum (fixed price). It is suitable for large or complex commercial construction projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A102

A

Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

This contract between owner and contractor can be used on large projects requiring a guaranteed maximum price when the payment to the contractor is the cost of the work plus a fee.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A103

A

Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price

This contract is used on large projects when the basis of payment to the contractor is the cost of the work plus a fee, and the cost is not fully known at the commencement of construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A104

A

Standard Abbreviated Form of Agreement Between Owner and Contractor

This contract is used on construction projects of limited scope and complexity when there is a stipulated sum or cost plus.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A105

A

Standard Short Form of Agreement Between Owner and Contractor

This contract is appropriate for smaller, less complex commercial or residential projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A110

A

Standard Form of Agreement Between Owner and Contractor for a Custom Residential Project

This contact is a stand-alone agreement with its own internal general conditions and is intended for use on custom residential construction projects. A110 may be used for custom residential projects where payment is based on either a stipulated sum or the cost of the work plus a fee, with or without a guaranteed maximum price.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A111

A

Standard Form of Agreement Between Owner and Home Builder for Construction of a Single Family Home

This contract is a streamlined document developed to meet the needs of residential owners and home builders for a relatively straightforward home construction project. It is not intended to be used for remodeling or renovation projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A112

A

Standard Form of Agreement Between Owner and Home Builder for Design and Construction of a Single Family Home

This contract is intended to be used for a single family residential project when the owner hires a home builder to provide design services and construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A121

A

Standard Form of Master Agreement Between Owner and Contractor where Work is provided under multiple Work Orders

This contract is used when the contractor’s scope of work will subsequently be specified through the use of one or more work orders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A132

A

Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition

This contract is used on projects where the basis of payment is either a stipulated sum (fixed price) or cost of the work plus a fee, with or without a guaranteed maximum price where construction manager is the adviser.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A133

A

Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

This contract is used on projects where a construction manager, in addition to serving as adviser to the owner, assumes financial responsibility for construction of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A134

A

Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guarantee Maximum Price

This contract is used when the owner seeks a construction manager who will take on responsibility for providing the means and methods of construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

A141

A

Standard Form of Agreement Between Owner and Design-Builder

This contract is used on large design-build projects when the owner contracts with a single entity to provide both design and construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A142

A

Standard Form of Agreement Between Design-Builder and Contractor

This contract is used for large design-build projects when the design-builder hires a contractor for construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A145

A

Standard Form of Agreement Between Owner and Design-Builder for a One or Two Family Residential Project

This contract is used for a one or two family residential project and consists of the Agreement portion and Exhibit A, a Design-Build Amendment that is executed when the owner and design-builder have agreed on the Contract Sum.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A151

A

Standard Form of Agreement Between Owner and Vendor for Furniture, Furnishings, and Equipment (FF&E)

This contract is used between owner and vendor for furniture, furnishings and equipment (FF&E) where the basis of payment is a stipulated sum (fixed price) agreed to at the time of contracting.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

A152

A

Purchase Order

This purchase order agreement is intended for situations where a Purchaser will buy goods from a Vendor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

A195

A

Standard Form of Agreement Between Owner and Contractor for Integrated Project Delivery

This contract is used between owner and contractor for a large, transitional, and integrated project delivery, and provides business terms and conditions unique to the contract.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A201

A

General Conditions of the Contract for Construction

This sets the rights, responsibilities, and relationships of the owner, contractor, and architect. Various design-bid-build agreements incorporate and reference this “umbrella” document.

Not actually a contract. It’s attached to the contract.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

A221

A

Work Order for use with Master Agreement Between Owner and Contractor

This work order is used with the master agreement between owner and contractor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

A232

A

General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

This contract provides general conditions and rights, responsibilities, and relationships of the owner, contractor, construction manager, and architect when the construction manager is an adviser.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

A232SP

A

General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

This contract provides general conditions and rights, responsibilities, and relationships of the owner, contractor, construction manager, and architect when the construction manager is an adviser on a sustainable project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

A295

A

General Conditions of the Contract for Integrated Project Delivery

This contract provides general conditions for a transitional integrated project delivery.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

A305

A

Contractor’s Qualification Statement

This questionnaire is used to provide information about a contractor’s background.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

A310

A

Bid Bond

This bond ensures the selected bidder will execute the contract and provide performance and payment bonds.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

A312

A

Performance Bond and Payment Bond

This contract contains two bonds that cover the contractor’s performance and the contractor’s obligation to pay subcontractors and others for materials and labor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

A313

A

Warranty Bond

This contract is an assurance by the contractor and the contractor’s surety that the contractor’s warranty obligations will be performed and completed in accordance with the terms of the construction contract.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

A401

A

Standard Form of Agreement Between Contractor and Subcontractor

This contract is used to establish the responsibilities and obligations between the contractor and subcontractor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

A421

A

Standard Form of Master Agreement Between Contractor and Subcontractor where Work is provided under multiple Work Orders

This contract is used when the subcontractor’s scope of work will subsequently be specified through one or more work orders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

A422

A

Work Order for use with Master Agreement Between Contractor and Subcontractor

This work order is used when a contractor and subcontractor have entered, or will enter, into a master agreement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

A441

A

Standard Form of Agreement Between Contractor and Subcontractor for a Design-Build Project

This contract between contractor and subcontractor is used with any sized design-build project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

A503

A

Guide for Supplementary Conditions (for A201-2017, 2017 Owner-Contractor and 2019 CMc agreements)

This guide provides guidance to assist in preparing the Contract for Construction, and it provides model language that may be used to amend or supplement the Contract for Construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

A533

A

Guide for Supplementary Conditions, CMa Edition (for A232-2019, General Conditions and A132-2019, Owner-Contractor Agreement)

This guide provides guidance to assist in preparing the Contract for Construction, and it provides model language that may be used to amend or supplement the Contract for Construction when the construction manager is the advis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

A701

A

Instructions to Bidders

This contract is used when competitive bids are to be solicited for construction of a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

B101

A

Standard Form of Agreement Between Owner and Architect

Contract typically used with large projects in conjunction with A201-2017. Services listed are divided into basic, supplemental, and additional services. It may be used with a variety of compensation methods, including percentage of the budget for construction cost and stipulated sum.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

B102

A

Standard Form of Agreement Between Owner and Architect without a Predefined Scope of Architect’s Services

This contract is a flexible agreement where the parties attach architect’s scope of service and can be used on any size project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

B103

A

Standard Form of Agreement Between Owner and Architect for a Complex Project

This contract between owner and architect is used with a complex project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

B104

A

Standard Abbreviated Form of Agreement Between Owner and Architect

This contract between owner and architect is used with a medium project for a project of limited scope. B104 contains a compressed form of basic services with three phases: design, construction documents, and construction.

39
Q

B105

A

Standard Short Form of Agreement Between Owner and Architect

This contract between owner and architect is used with a small project for a residential or small commercial project.

40
Q

B106

A

Standard Form of Agreement Between Owner and Architect for Pro Bono Services

This contract between owner and architect is used with any sized project for pro bono services.

41
Q

B107

A

Standard Form of Agreement Between Developer-Builder and Architect for Prototype(s) for a One or Two Family Residential Project with Limited Architectural Services

This contract between developer-builder and architect is used for any sized single family residential project where architect’s services are specifically for developing a prototype.

42
Q

B108

A

(formerly B181–1994), Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

This contract between owner and architect is used for a large federally-funded or federally-insured project.

43
Q

B109

A

Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project

This contract between owner and architect is used for a large project, mixed-use, or multi-family residential project.

44
Q

B110

A

Standard Form of Agreement Between Owner and Architect for a Custom Residential Project

This contract is a one-part standard form of agreement between owner and architect for design and construction contract administration on a custom residential project.

45
Q

B121

A

Standard Form of Master Agreement Between Owner and Architect for Services provided under multiple Service Orders

This contract between owner and architect establishes a master agreement with multiple service orders.

46
Q

B132

A

Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

This contract between owner and architect is used with a large project when the construction manager is the adviser.

47
Q

B133

A

Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor Edition

This contract between owner and architect is used with a large project where the construction manager is a constructor.

48
Q

B143

A

Standard Form of Agreement Between Design-Builder and Architect

This contract between design-builder and architect is used with large, design-build project when a design-builder hires an architect.

49
Q

B144-ARCH-CM-1993

A

Standard Form of Amendment to the Agreement Between Owner and Architect where the Architect provides Construction Management Services as an adviser to the Owner

This amendment contract between owner and architect is used with any sized project for an architect to provide construction management services as an adviser to the owner.

50
Q

B152

A

Standard Form of Agreement Between Owner and Architect for Interior Design and Furniture, Furnishings, and Equipment (FF&E) Design Services

This contract between owner and architect is used with any sized interior project which includes interior design services including furniture, furnishings and equipment.

51
Q

B161

A

Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States

This contract between client and consultant is used with large international projects when the US architect is hired on a consulting basis for design services and the owner will retain a local architect in the foreign country.

52
Q

B162

A

Abbreviated Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States

This contract between client and consultant is used with medium to small international projects when the US architect is hired on a consulting basis for design services and the owner will retain a local architect in the foreign country.

53
Q

B171

A

Standard Form of Agreement Between Owner and Design Manager for use in a Multiple Project Program

This contract between owner and design manager is used with multiple large projects. Design manager develops programming, design and quality standards, and SD/DD level of design concept before passing along to Architect of Record for each specific building within the larger project.

54
Q

B172

A

Standard Form of Agreement Between Owner and Architect for Architect of Record Services

This contract between owner and architect is used when architect acts as a project specific architect.

55
Q

B195

A

Standard Form of Agreement Between Owner and Architect for Integrated Project Delivery

This contract between owner and architect is used with large, transitional integrated project delivery.

56
Q

B201

A

Standard Form of Architect’s Services: Design and Construction Contract Administration

This contract defines the architect’s traditional scope of services for design and construction contract administration in a standard form that the owner and architect can modify to suit the needs of the project.

57
Q

B202

A

Standard Form of Architect’s Services: Programming

This contract establishes duties and responsibilities where the architect provides the owner with programming services.

58
Q

B203

A

Standard Form of Architect’s Services: Site Evaluation and Project Feasibility

An owner can use the services provided by the architect in B203 to decide whether a site, or sites, are suitable for a project, or to determine the development potential of a site.

59
Q

B204

A

Standard Form of Architect’s Services: Value Analysis, for use where the Owner employs a Value Analysis Consultant

This contract is attached to an owner/architect agreement that provides the conventional scope of architect services when the owner employs a value analysis consultant.

60
Q

B205

A

Standard Form of Architect’s Services: Historic Preservation

B205 establishes duties and responsibilities where the architect provides services for projects that are historically sensitive.

61
Q

B207

A

Standard Form of Architect’s Services: On-Site Project Representation

B207 establishes the architect’s scope of services when the architect provides an on-site project representative during a project’s construction phase.

62
Q

B210

A

Standard Form of Architect’s Services: Facility Support

An owner can use B210 to hire an architect to assess the condition, performance and operation of an existing facility or group of facilities.

63
Q

B212

A

Standard Form of Architect’s Services: Regional or Urban Planning

This contract is used to establish duties and responsibilities where the architect provides the owner with regional or urban planning services.

64
Q

B214

A

Standard Form of Architect’ Services: LEED® Certification

This contract is used to establish duties and responsibilities when the owner seeks certification from the US Green Building Council’s Leadership in Energy and Environmental Design (LEED) program.

65
Q

B221

A

Service Order for use with Master Agreement Between Owner and Architect

This service order is used to provide the architect’s scope of services, and other terms related to the specific service order and only used when the B121 Master Agreement has been established.

66
Q

B252

A

Standard Form of Architect’s Services: Interior Design and Furniture, Furnishings, and Equipment (FF&E) Design Services

This contract is used with any sized interior design project to establish duties and responsibilities when the architect provides architectural interior design services and design services for furniture, furnishings, and equipment.

67
Q

B253

A

Standard Form of Architect’s Services: Furniture, Furnishings, and Equipment (FF&E) Design Services

This contract is used with any sized interior design project to establish duties and responsibilities when the architect provides design services for furniture, furnishings, and equipment.

68
Q

B254

A

Standard Form of Architect’s Services: Purchasing Agent Services for Furniture, Furnishings, and Equipment (FF&E)

This contract is used in situations where an Architect is expected to assist an Owner in purchasing furniture, furnishings, and equipment (FF&E) and managing FF&E contracts.

69
Q

B305

A

Architect’s Qualification Statement

This questionnaire is used to provide information about an architect’s background.

70
Q

B503

A

Guide for Amendments to AIA Owner-Architect Agreements

Free AIA guide for issues covered in owner-architect agreements.

71
Q

B509

A

Guide for Supplementary Conditions to AIA Document B109–2020 for use on Condominium Projects

Free AIA guide for issues on condominium construction and shows suggestions on how to modify owner-architect agreements for multi-family residential or mixed-use residential projects.

72
Q

C101

A

Joint Venture Agreement for Professional Services

This contract is used by two or more parties to provide for their mutual rights and obligations in forming a joint venture.

73
Q

C132

A

Standard Form of Agreement Between Owner and Construction Manager as Adviser

This contract between owner and construction manager is used for a large project when the construction manager is the adviser.

74
Q

C141

A

Standard Form of Agreement Between Owner and Consultant for a Design-Build Project

This contract between owner and consultant is used for a large design-build project.

75
Q

C191

A

Standard Form Multi-Party Agreement for Integrated Project Delivery

This contract between multiple parties is used for large projects and intermediate level of integrated project delivery.

76
Q

C401

A

Standard Form of Agreement Between Architect and Consultant

This contract is used when an architect obtains consulting services.

77
Q

C402

A

Standard Form of Agreement Between Architect and Consultant for Special Services

This contract between an architect and consultant is used for consultant’s services that are limited in scope and/or do not extend to the construction phase of the project.

78
Q

C441

A

Standard Form of Agreement Between Architect and Consultant for a Design-Build

This contract between an architect and consultant is used to establish a master agreement with multiple service orders.

79
Q

D-series

List documents, as well

A

Miscellaneous Documents

D101 - Methods of Calculating Areas and Volumes of Buildings

D200 - Project Checklist

D503 - Guide for Sustainable Projects

80
Q

E-Series

A

Exhibits

E203 - Building Information Modeling and Digital Data Exhibit

E204 - Sustainable Project Exhibit

E234 - Sustainable Projects Exhibit, Construction Manager as Constructor

E235 - Sustainable Projects Exhibit, construction Manager as Adviser Edition

81
Q

G-Series

A

Contract Administration and Project Management Forms

82
Q

G701

A

Change Order

AIA Document G701™-2017 is used for implementing changes in the work agreed to by the owner, contractor, and architect.

83
Q

G702

A

Application and Certificate for Payment

Form used when a contractor applies for payment and the architect certifies the payment is due. Shows the contract sum to date, including the total dollar amount of the work completed and stored to-date, the amount of retainage (if any), the total of previous payments, a summary of change orders, and the amount of current payment requested.

84
Q

G703

A

Continuation Sheet

This continuation sheet should be used by the contractor when listing the portions of work and scheduled values. It is suitable for any sized project.

85
Q

What does is mean when “S” follows contract name?

A

Contractor-Subcontractor Variation

86
Q

G704

A

Certificate of Substantial Completion

AIA Document G704®–2017 is a standard form for recording the date of substantial completion of the work or a designated portion thereof.

87
Q

G705

A

List of Subcontractors

This form contains the list of subcontractors proposed for a project.

88
Q

G711

A

Architect’s Field Report

This form maintains a record of site visits or daily log of construction activities.

89
Q

G712

A

Shop Drawing and Sample Record

This form is used for any sized project where the architect logs and monitors shop drawing and samples

90
Q

G716

A

Request for Information (RFI)

This form is used to formally request further information from a party during construction

91
Q

G801

A

Notice of Additional Services

G801–2017 is intended to be used by an architect when notifying an owner of additional services pursuant to the AIA’s owner/architect agreements

92
Q

G802

A

Amendment to the Professional Services Agreement

G802–2017 is intended to be used when amending the AIA’s owner/architect agreements to provide changes in the architect’s scope, compensation, or other terms.

93
Q

G803

A

Amendment to the Consultant Services Agreement

G803–2017 is intended for use when amending the AIA’s architect-consultant agreement, AIA Document C401™–2017, to provide changes in the consultant’s scope, compensation, or other terms

94
Q

SP suffix on contract title

A

Sustainable Project