Administration/OOMA Flashcards
What qualification do you need to complete the sign off of the Work Order for the PCMCIA card and Daily/Turnaround work order/MAF?
A. Work center 310 and 210 CDI/CDQAR/QAR
What is a Daily or Turnaround Work Order or MAF used to document?
A. Maintenance Man Hours.
When initiating an “Unscheduled Maintenance” Work Order or MAF, what type of Work order should you be using?
A. DF-Daily/Pre-flight/Post-flight/Turnaround.
What does WUC stand for and what does it do? Where can I find WUC documentation procedures?
A. Work Unit Code. Allows for proper aircraft part documentation.
B. NAMP 4790.2B Appendix E E-7
What are the two When Discovered codes that will typically be used by a plane captain when initiating a Work Order or MAF?
A. J- Daily Inspection or K- Preflight.
From the A-Sheet in OOMA, at the bottom of the screen you have several windows to choose from, what are the selection tabs that are pertinent to a plane captain.
A. A-Sheet, daily maintenance record, turnaround maintenance record.
In what sequence do you sign off the daily, turnaround, and A-Sheet?
A. Daily or turnaround, followed by the A-Sheet
On the A-sheet in ooma, what are the blocks that the plane captain must fill out? What information goes in each block?
A. Fuel Grade, Fuel quantity, special equipment, and the plane captain signature.
B. Information
I. Fuel agrade
II. Fuel quantity
III. Oxygen levels for crew and passenger.
IV. Dry bay fire protection system test MCN
Where can you find IRACs?
A. In the pema, under the P-8A IRACs folder.
What report do you fill out post performing a launch or recovery? Why is this report process important?
A. ASAP report
B. This report keeps the command safety team situationally aware of safety occurrences which allows them to provide training to ensure that these safety incidents are effectively mitigated.