A2Z Compass Flashcards
When performing lawn maintenance, what is the standard height to which you cut the grass?
2 to 3 inches
When your work order requires a lock change & lockbox and there is already a lockbox present, what do you do with the existing one?
Remove it without damaging it & place it on the kitchen counter or in a kitchen drawer
As part of the initial lawn service, you are required to
- Edge along all walkways, driveways and sidewalks
- Rake and remove all excess grass clippings
- Trim along fence lines and around the foundation of all structures
When completing a lawn cut you are required to provide:
*Before, during & after photos
*Date stamps
*Address verification
How do you disengage a deadbolt that is preventing access?
Drill out the deadbolt and disengage the throw
What is the proper way to install a hasp to secure a door?
On the exterior with the flap over the exposed screws
According to HUD guidelines, what is the appropriate plywood thickness for boarding a door opening?
5/8”
According to HUD guidelines, what is the appropriate plywood thickness for boarding a window opening?
5/8”
What is the proper debris disposal method?
Deliver to the local dump site and submit dump receipt
What is the standard unit of measure for debris?
Cubic Yard
True or False a minimal amount of debris may be placed at the curb for local
False
The primary method of securing plywood when completing board-ups is by
*Using nails and securing it to the outside of the window
*Bolt boarding using 3” wood screws placed every 4”
What steps are required to properly board a window
*Remove all broken glass
*Trim excess length off bolts
*Cut wood to proper size
A boiler heat system is considered a
Wet heat system
The unit of measure used for roof tarping is:
Square feet
The items required for proper tarp installation are
Vinyl tarp, button caps and furring strips