8.6 Technical Specification Flashcards
1 - List ‘Facility Construction’ Divisions 02 through 14 (15-19 reserved for future expansion)
02 - Existing Conditions 03 - Concrete 04 - Masonry 05 - Metals 06 - Wood, Plastics and Composites 07 - Termal Moisture Protection 08 - Openings 09 - Finishes 10 - Specialties 11 - Equipment 12 - Furnishings 13 - Special Construction 14 - Conveying Equipment
2 - Which Master Format divisions relate to structural elements?
2-6
3 - Which disciplines are found in the ‘Facility Services’ Section of the MasterFormat system? What divisions are those?
MECH (21-25)
ELEC (26-28)
Divisions 20-28
4 - List ‘Infrastructure’ Divisions 30 through 39 (30, 36-39 reserved for future expansion)
31 - Earthwork 32 - Exterior Improvements 33 - Utilities 34 - Transportation 35 - Waterway + Marine Construction
5 - MasterFormat is subdivided into a hierarchy, list the 4 main organizational structures.
- DIVISIONS
- SECTIONS
- PARTS 1.General 2.Products 3.Execution
- ARTICLES major subjects comprised of paragraphs
6 - What are divisions 00 + 01
00 Procurement & Contracting Requirements
01 General Requirements
7 - List the 9 Sections found in Division 00:
00 Procurement & Contracting Requirements
00 10 Solicitation (RFP etc)
00 20 Instructions for Procurement (supplemental instructions / meetings, etc)
00 30 Available Information
00 40 Procurement Forms & Supplements (bid forms etc.)
00 50 Contracting Forms & Supplements (agreement form)
00 60 Project Forms (Bond forms, certificates, CA forms)
00 70 Conditions of the Contract (general conditions, supplementary conditions)
00 80 N/A
00 90 Revisions, Clarifications, and Modifications
8 - What is the NMS and who produces it?
aka ‘Deletion Spec’
• Library of construction specification sections written in contract spec format (MasterFormat)
• Produced by Federal Government + Private Interests
9 - List the 9 Sections in Div. 01:
01 General Requirements:
01 10 Summary (of work, contracts, restrictions)
01 20 Price + Payment Procedures (allowances, unit prices, alternates)
01 30 Admin. Rqrmts (PM & coordination, progress documentation, submittal procedures etc)
01 40 Quality Rqrmts
01 50 Temp. Facilities + Controls
01 60 Product Rqrmts
01 70 Execution + Closeout Rqrmts
01 80 Performance Rqrmts
01 90 Life Cycle Activities (commissioning, O+M)
10 - List the 8 Sections in Div. 02
02 00 Existing Conditions (maint of existing) 02 10 N/A 02 20 Assessment (Surveys, assessments) 02 30 Subsurface Investigation (Geo) 02 40 Demo + Struc. Moving 02 50 Site Remediation 02 60 Contaminated Site Material removal 02 70 Water Remediation (groundwater) 02 80 Facility Remediation
11 - List the 8 Sections in Div. 03
03 00 Concrete (common work, maintenance) 03 10 Concrete Forming & Accessories 03 20 Concrete Reinforcing 03 30 Cast-in-Place 03 40 Precast 03 50 Cast Decks + Underlayment 03 60 Grouting 03 70 Mass Concrete 03 80 Concrete Cutting + Boring
12 - What is found in 04 20 20?
04 Masonry (clay, brick, CMU, veneer, glass)
13 - What are the 5 Sections found in Div. 05
05 00 Metals (common maintenance + work, schedules)
05 10 Structural Metal Framing
05 20 Metal Joists
05 50 Metal Fabrications (railings, grates, nosings, stairs)
05 60 N/A
05 70 Decorative Metal
14 - What are the 8 Sections found in Div. 06?
06 00 Wood, Plastics, Composites (common work, maintenance)
06 10 Rough Carpentry
06 20 Finish Carpentry
06 30 N/A
06 40 Architectural Woodwork (casework, stairs/railings, ornamental wood, wood trim, wood frames)
06 60 Plastic Fabrications (solid surface)
06 70 Structural Plastics (composite lumber)
06 80 Composite Fabrications
15 - What are the 9 Sections found in Div. 07?
07 00 Thermal + Moist. Protection (maint. + protection)
07 10 Dampproofing + Waterproofing
07 20 Thermal Protection (vapour retarder, air barrier)
07 30 Steep Slope Roofing
07 40 Roofing + Siding Panels
07 50 Membrane Roofing
07 60 Flashing + Sheet Metal
07 70 Roof + Wall Specialties + Accessories (roof pavers, vents)
07 80 Fire + Smoke Protection (Fireproofing, firestopping, smoke seals)
07 90 Joint Protection (seals, gaskets, rods)
16 - What are the 9 Sections of Div. 08?
08 00 Openings (Maintenance, operation, schedules)
08 10 Doors + Frames
08 20 N/A
08 30 Specialty Doors + Frames (slide glass, coil, etc)
08 40 Entrances, Storefronts + Curtain Walls
08 50 Windows (metal, wood, plastic, composite)
08 60 Roof Windows + Skylights
08 70 Hardware (not schedule! in 00)
08 80 Glazing
08 90 Louvers + Vents
17 - What are the 8 Sections in Div. 09?
09 00 Finishes (maintenance, common work, schedule) 09 10 N/A 09 20 Plaster + Gypsum Board 09 30 Tiling 09 40 N/A 09 50 Ceilings 09 60 Flooring 09 70 Wall Finishes 09 90 Painting + Coating
18 - What are the 8 Sections in Div. 10?
10 00 Specialties (operations, maintenance, common work, commissioning)
10 10 Information Specialties (chalkboards, signage)
10 20 Interior Specialties (compartments, partitions, wall, door protection, WC accessories)
10 30 Fireplaces + Stoves
10 40 Safety Specialties (fire extinguishers, emerg. aid)
10 50 Storage Specialties (lockers, shelving, wardrobe)
10 70 Exterior Specialities (exterior clocks, flagpoles)
10 80 Other Specialties (pest control)
19 - What division would air-supported structures fall under?
Div 13
20 - In what division would you find elevators?
Div 14
21 - In what division would you find fire suppression systems?
Div 21 Fire Suppression
24 - In what division would you find plumbing?
Div 22 Plumbing
25 - In what division would you find HVAC systems?
Div 23 Heating, Ventilating, and Air Conditioning
22 - In what division would you find lighting control?
Div 25 Integrated Automation
23 - In what division would you find cable, telephone, internet?
Div 27 Communications
26 - In what division would you find security systems?
Div 28 Electronic Safety + Security
27 - In what division would you find soil stabilization?
Div 31 Earthworks
28 - In what division would you find fencing + planting?
Div 32 Exterior Improvements
29 - In what division would you find storm drainage?
Div 33 Utilities
30 - In what division would you find stage or gym equipment?
Div 11 Equipment
31 - What should you avoid specifying if you have specified the results of a material or assembly?
The method of install, may cause conflict and expose arch to risk.
32 - For what materials must the architect provide a spec?
All materials on drawings.
33 - What is the Uniformat organizational structure.
3 levels of increasingly detailed information subdivided into 3 elements of the building:
A - Substructure
B - Shell
C - Interior