7 Design Development Flashcards
10 - What is the main structural problem that should be considered by the engineer during DD?
Alternate framing plans + systems, including their associated costs.
03 - What information does the architect need to provide to the structural engineer? (7)
1 - Geo 2 - Restrictive Areas for Supports 3 - Areas / uses / finishes 4 - Code (prelim w FRs) 5 - Location + Size of Openings 6 - Construction Materials 7 - Project Delivery
09 - As a record of design decisions, who might use the Design Report? (7)
1 - Architectural staff 2 - Bridging team 3 - AHJ 4 - Client 5 - Financial Institutions 6 - Facility users / managers 7 - Consultants
04 - What information does the architect need to provide to the mechanical engineer? (9)
1 - Glazing Type + Window Coverings 2 - Hours of Operation 3 - Diff. in room temp / RH (acceptable to client/user) 4 - Special areas (plumb/HVAC rqrmts) 5 - Code (prelim w WC / occupancy count) 6 - Controls + energy management 7 - Water / Waste removal analysis 8 - Specialty Equipment 9 - Project Delivery
13 - What is the main mechanical problem that should be considered by the engineer during DD?
Rqrmnts for emerg. standby + dual equipment systems. (Should be outlined in FP)
01 - What level of detail is required for the specifications during DD?
Outline Spec (table of contents from all consultants - review with client)
02 - With whom should the architect share the ‘signed off’ schematic design.
All consultants & staff
11 - What should the architect and structural engineer consider together during DD? (3)
1 - Availability of Material
2 - Appearance
3 - Functional Considerations
06 - List 5 uses of client review documents
1 - Client Review + Approval 2 - AHJ + Public Group Review 3 - Consultant Input / Coord. 4 - Update Cost Estimate 5 - Basis of CDs
17 - What should the electrical engineer and the design team resolve together during DD? (7)
1 - Anticipated ELEC. LOAD + allowance for future
2 - rqrmts for INCOMING SERVICES + space rqrmnts (vault / sub-station)
3 - DISTRIBUTION of power / utilization of voltage
4 - locations for elec / comm / data CLOSETS
5 - rqrmts for EMBEDDING CONDUIT
6 - light FIXTURE selection + ceiling rqmts
7 - SWITCHing + CONTROLs
8 - Telecom / data / fire alarm / security / pa SYSTEMS
16 - What aspect of the design should the architect and electrical engineer work on together during DD? (1)
The lighting design. (typ. on RCPs)
18 - List the 8 KEY architectural tasks to be executed during DD.
1 - prep / COORD ASMECL designs 2 - outline SPEC 3 - perform prelim. ENERGY MODEL analysis 4 - AHJ reviews 5 - prep PRESENTATION material 6 - update construction COST estimate 7 - update SCHEDULEs 8 - CODE review
14 - What should the architect and mech engineer consider together during DD? (1)
If there is no functional program the architect must assist the client in deciding on systems.
08 - List key drawings to be provided as part of the Client Design Review documents during DD. (8)
1 - Site 2 - All Floor Plans 3 - All Elevations 4 - Building Sections 5 - SME Plans 6 - Details of significant design features 7 - Prelim furn/equip plans 8 - Presentation (renders, colour Boards etc)
12 - What should the structural engineer and the design team resolve together during DD? (7)
1 - typ. BAY framing 2 - max DEPTHs of members 3 - size / location of OPENINGS 4 - min. CEILING clearances 5 - identify items EMBEDDED 6 - rqrmnts for FRs 7 - provision for specialty EQUIP (+typ. mech equip)