6. Retrofit Contract information Flashcards
1 A thermal bypass is where more conductive materials exist within an insulation layer. True or false?
False
2 Where moist (humid) air meets a cool surface, the first reaction is:
Mould growth
Fungal attack
Condensation
Rising damp
Condensation
3 Which of the following is positioned on the inner side of the insulation, to reduce vapour transfer through a building element?
Vapour permeable construction
Vapour control layer
Vapour control layer
4 Ventilation from ‘wet’ rooms (i.e., kitchens and bathrooms), which may be intermittent or continuous is known as
Whole building
Purge
Extract
Natural
Extract
5 Which of the following organisations is a not-for-profit training company, specifically dedicated to improving the capabilities of the UK retrofit sector?
TRA
UKCMB
LABC
BAFE
UKCMB
The person responsible for meeting with the property owners in the first instance and discussing options for improving their home’s energy performance is the retrofit:
Coordinator
Advisor
Designer
Evaluator
Advisor
PAS 2030‑2019, is intended specifically for the retrofit:
Installer
Designer
Advisor
Evaluator
Installer
A piece of equipment used for looking inside an existing cavity is known as a:
Hydroscope
Camscope
Borescope
Miniscope
Borescope
The most likely defect caused by the problem in the image below is:
Rising damp
wet rot
dry rot
Penetrating damp
Penetrating damp
Moisture in the air that forms on the colder part of the building fabric is best known as
Rising damp
Efflorescence
Condensation
Ammonia salt
Condensation
When a DPC fails in a cavity wall at ground-floor level, the most likely outcome is condensation, true or false?
False - the most likely outcome is rising damp
Fungus that is recognised by a flat, mushroom shape and attacks wet underfloor timbers (20 to 30% moisture content), is a sign of:
Dry Rot
Wet Rot
Woodworm
Mould Growth
Dry rot
Materials delivered to site should be checked for accuracy against:
A purchase order
A delivery note
An invoice
A remittance advise
A purchase order
According to PAS 2035; ‘whatever the scale of the retrofit project, a technically sound and usually cost-effective approach’ is the one known as fabric:
intelligence
First
Friendly
Smart
First
When repointing defective brickwork, how deep should the joint be to receive the new mortar?
5mm
10mm
15mm
20mm
10mm