4.3.12 - prepare a pre-incident survey Flashcards

1
Q

Steps

A
  1. Appropriately notify the building, occupant and arrange to complete a field survey
  2. Use first due app to place key building components
    -fDC’s
    -Control valves
    -Section valves
    -Fire alarm panels
    -Standpipe connections
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Document special features

A

Length and width of building, adjoining structures, detached structures, docks, piers, or covered moorages

Front door and exit doors

Permitted operations

Flammable/combustible liquid storage

Electrical panels and sub panels

Gas shut off

Directional designator

Adjacent streets

Adjacent railroad tracks

Hydrants within 300 feet

Elevators

Fire, suppression and detection systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly