3M 301 Oral Board Flashcards
Duties and Responsibilities of a craftsman?
Check SKED, know maintenance that is assigned, complete to best of ability IAW MRC.
The Ships 3M Manager?
Executive Officer XO
What are the source instructions for 3M?
OPNAVINST 4970.4F
JFFM
Sharepoint 3M tab
COMUSFLTFORCOMINST 4790.3
What is OPNAVINST 5100.19E CH C1, A1, C23?
C1 Basic Safety
A1 Introduction
C23 Hazmat Storage
How to handle, store, and dispose of hazmat?
OPNAVINST 5100.19
HMUG (Hazardous Material User Guide)
Hazmat Location On Flight Deck.
What is a SDS and where is it located?
Safety Data Sheet
Share drive RPPO than SDS folder.
How often are tagout audits completed?
Weekly
Actions for Tagout Violations?
Captain Mast
Quals pulled
What is TPMTE?
Tools, Parts, Materials, Test Equipment.
What is a SPMIG and how do you use it?
Standard PMS Material Index Guide
Spin number is a number assigned to the TPMTE that can be referenced to the SPMIG for stock number identification in case of subsitition such as HAZMAT materials.
Define LGL?
Location Guide List.
Define COSAL?
Coordinated Shipboard Allowance List
How do you know what PMS you are assigned?
SKED 3.2
how do you validate the MRC is correct?
MRC to MIP- LOEP-Change Page
Explain the Sections of the MRC:
A7 4ABC Y
List the time frames for accomplishment: D, W, 2W, Q, S, A, 8M, 72M-1R, R-6.
Daily, Weekly, every 2 weeks, Quarterly, Semiannually, Annually, 8 Months, 72 months or related, related six months.
Prove TMPTE for MRC
SPMIG