A work center can take credit for PMS check if 80% of the check can be completed?
False
How often will PMS check 4211/001 QR-6R have to be accomplished?
Once per quarter, or as required.
A caution tag is used whenever?
Precautionary measures, to provide temporary special instruction as needed.
What are the duties/responsibilities of the second person on an equipment tag out procedure?
To act as an independent reviewer, verifying proper tag attachment, and positioning of switch/valve.
Who reviews and approves via signature, the 13 week report?
The division officer, work center supervisor, and LCPO.
The maintenance data system (MDS) it means in which work center supervisors can?
All of the above.
Who has overall responsibility for ensuring the 3M system functions within the command?
The commanding officer.
An OPNAV 4790/CK is used to report discrepancies/deficiencies in the PMS system?
False.
Which documents provides a listing of MIP’s assigned to a specific work center?
List of effective pages (LOEP).
Cycle, quarterly and weekly boards do not exist in 3.2.
True.
Who is the ship’s 3M manager?
The executive officer.
If more than one piece of equipment will be maintained by an MRC, the location block will read.
See the location guide list below.
To request a replacement for a lost or damaged MRC that is classified the work center supervisor should fill out a?
OPNAV 4790/7B category a.
An MRC card with SYSCOM control number A7 4ABG N has a production birthdate of?
October 2017.
Which of the following is not an example of an IEM MRC?
U-1
Equipment is placed in IEM status I whenever?
The equipment will not be operated for 30 days or more.
Where on the MRC will you find a list of identical items at different locations?
Computer printed at bottom of the MRC.
Which tag-out would a supply department DCPO use to accomplish a DC related tag-out?
Supply Tag-out log
A classified MRC are what color?
Pink
Which document provides instructions and references required for use in the 3M System?
OPNAVINST 4790.4
Where do maintenance personnel find their PMS assignments?
Both A and B.
When MRC applies to multiple like equipment they are each listed on _____, and the location block will read ___.
The bottom of the mrc, see location guide list below.
What is the purpose of 3-M system?
To provide for a managing maintenance and material support in a manner which will ensure maximum equipment readiness.
who may update the weekly PMS Schedule in SKED to indicate that a PMS check has been completed?
Maintenance Person who accomplished the PMS check.