3.5 ECCS Flashcards

1
Q

3.5.1

A

SITs - Operating
4 SITs Operable
Modes 1-2 and 3-4 >/= 1837 psia

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does an operable SIT mean?

A

Pressure 600 psig - 625 psig
2300-4400 ppm boron
Motor operated isolation valve fully open, power removed
Volume of 28%-72% NR or 1802-1914 cubic feet of borated water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

3.5.2

A

SITs shutdown
4 SITs operable with volume 39% WR - 83% WR
OR
3 SITs operable with volume 60% WR - 83%WR
Modes 3-4 (>/= 1837 psia)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3.5.3

A

ECCS - Operating
Two trains Operable
Modes 1-2 and 3 w/ Ppzr >/= 1837psia and Tc >/= 485F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What makes up an ECCS train in Modes 1-3?

A

HPSI subsystem and LPSI subsystem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3.5.4

A

ECCS - Shutdown
One HPSI train operable
Mode 3 less than 1837 and 485F
Mode 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

3.5.5

A
RWT shall be operable
Modes 1-4
Must meet level requirements 
Boron concentration of 4000-4400 ppm
Tank not isolated
Temp between 60F and 120F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is RWT level requirement dependent on?

A

RCS Temperature. There’s a table in the Tech Spec Basis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3.5.6

A

TSP baskets have 524 cubic ft of active TSP

Modes 1-3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly