Q

LCO 3.1.1: SDM shall be >/= value in COLR

Applicability: Modes _______ with RTCB open or CEA withdrawal system not capable of CEA withdrawal.

Actions:

A: SDM not within limit: Initiate boration to restore SDM. Completion time: _________

A

Applicable in Modes 3,4, and 5 with RTCB open or CEDMCS not capable of CEA withdrawal

Completion TIme: 15 Minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

SDM RTCB Closed

LCO 3.1.2 Reactivity shall be controlled by:

a. SDM shall be >/= value in COLR
b. KN-1 shall be <.99 when Tc
c. Reactor criticality shall not be achieved with shutdown group movement

Applicability: Modes ________ with RTCB closed and the CEA drive system capable of CEA withdrawal.

Actions:

A: SDM not within limits:

Required Action:

A.1 Initiate boration to restore SDM.

Completion Time: ___________

B: KN-1 Not within limit when Tc

OR

Reactor criticality can be achieved by shutdown group movement:

Required Action:

B.1 Vary CEA position to restore limits

Completion Time:________

AND

B.2 Initiate boration to restore limits

Completion Time:__________

A

Applicability: Modes 3-5 with RTCB Closed and CEA drive system capable of CEA withdrawal

A.1, B.1, and B.2 Completion times: 15 Minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

LCO 3.1.3 The Core reactivity balance shall be within +/- 1% dk/k of predicted values.

Applicability: Mode ____

Actions:

A: Core reactivity balance not within limit

Required Action:

A.1 Re-evaluate core design and safety analysis an determine that the reactor core is acceptable for continued operation

Completion Time: ________

AND

A.2 Establish appropriate operating restrictions and SRs

Completion Time:_________

B: Required actions/completion times note met:

B.1 ____________

Completion time: _______

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

MTC shall be maintained within the limits specified in the COLR, and a maximum positive limit that varies linearly from 0.5E-4 dk/k/F at 0% to 0.0 dk/k/F at 100%.

Applicable: Modes _______

Actions:

A. MTC not within limits

A.1 Required Action: Be in Mode 3

Completion Time:_________

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

LCO 3.1.5: All full strength CEAs shall be operable, and all full strength and part strength CEAs shall be aligned to within _______ (indicated position) of all other CEAs in their respective groups.

Applicable: Modes ___________

Actions:

A: One or more CEAs trippable and misaligned from its group by _____________

OR

One CEA trippable and misaligned from its group by________

Required Action:

A.1 Reduce Thermal power in accordance with the limits in the COLR

Completion time:__________

AND

A.2 Restore CEA alignment

Completion Time:__________

B: Only one CEA position indicator channel operable for One CEA per CEA group

Required Action:

B.1 Restore at least 2 position indicator channels to operable

Completion Time:_________

OR

B.2 Verify CEA groups with inoperable position indicators are fully withdrawn or fully inserted while maintaining insertion limits of LCOs 3.1.6,3.1.7, and 3.1.8

Completion Times: __________ AND ________

C: Required actions of A and B not met OR One or more full strength CEAs untrippable

Required Action:

C.1 Be in Mode 3

Completion Time: _________

D: 2 or more CEAs trippable and misaligned from their group by ___________

Required Action: D.1 ______________

Completion Time:___________

A

CEAs shall be aligned to within 6.6”

Applicable in Modes 1 and 2

A: 1 or more CEAs trippable and misaligned from its group by >6.6” and <=9.9”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

LCO 3.1.6 All shutdown CEAs shall be withdrawn ________

Applicable: Mode_____, Mode _____________________

Note: LCO is not applicable during SR 3.1.5.3 (CEA exercising)

Actions:

A: One SD CEA not within limit

A.1 Restore SD CEA to within limits

Completion Time:_______

B: Action not met:

B.1 Be in Mode 3

Completion TIme:_________

A

LCO 3.1.6 All shutdown CEAs shall be withdrawn >/=147.75”

Applicable: Mode1, Mode 2 with any Reg Group CEA not fully inserted

Note: LCO is not applicable during SR 3.1.5.3 (CEA exercising)

Actions:

A: One SD CEA not within limit

A.1 Restore SD CEA to within limits

Completion Time:2 hours

B: Action not met:

B.1 Be in Mode 3

Completion TIme:6 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

LCO 3.1.7 The PDIL alarm circuit shall be operable, and with COLSS in service or out of service, the Reg Groups shall be limited to the withdrawal sequence and insertion limits specified in the COLR and the associated time restraints

Applicable: Modes _______

LCO is not applicable during SR 3.1.5.3 or for up to 2 hours following RPCB

Actions:

A: Regulating CEA groups inserted beyond the transient insertion limit with COLSS in or out of service

A.1 Restore Reg CEA groups to within limits

Completion time:_____________

OR

A.2: Recduce thermal power to = the fraction of power allowed by the CEA group position and insertion limits of the COLR

Completion time:_____________

B: Reg group CEAs inserted between short term steady state and transient insertion limit for >4 hours per 24 hour intervals with COLSS in or out of service

B.1 Restrict increases in power to ________

Compeltion Time:____________

C: Reg group CEAs inserted between the long term steady state and transient insertion limits for >5EFPD per 30 EFPD or >14 EFPD per 365 EFPD with COlls in or out of service

C.1 Restore regulating CEA groups to within limits

Completion Time:____________

D: PDIL alarm circuit inoperable

D.1 Perform SR 3.1.7.1 (Verify RG CEA positions)

Completion Time: ________ AND¨______\_

E: Actions not met:

E.1 Be in Mode 3

Completion TIme:_________

A

LCO 3.1.7 The PDIL alarm circuit shall be operable, and with COLSS in service or out of service, the Reg Groups shall be limited to the withdrawal sequence and insertion limits specified in the COLR and the associated time restraints

Applicable: Modes 1 and 2

LCO is not applicable during SR 3.1.5.3 or for up to 2 hours following RPCB

Actions:

A: Regulating CEA groups inserted beyond the transient insertion limit with COLSS in or out of service

A.1 Restore Reg CEA groups to within limits

Completion time:2 hours

OR

A.2: Recduce thermal power to = the fraction of power allowed by the CEA group position and insertion limits of the COLR

Completion time: 2 hours

B: Reg group CEAs inserted between short term steady state and transient insertion limit for >4 hours per 24 hour intervals with COLSS in or out of service

B.1 Restrict increases in power to = 5% per hour

Completion Time: 1`5 minutes

C: Reg group CEAs inserted between the long term steady state and transient insertion limits for >5EFPD per 30 EFPD or >14 EFPD per 365 EFPD with COlls in or out of service

C.1 Restore regulating CEA groups to within limits

Completion Time: 2 hours

D: PDIL alarm circuit inoperable

D.1 Perform SR 3.1.7.1 (Verify RG CEA positions)

Completion Time: 1 hour AND¨Once every 4 hours thereafter

E: Actions not met:

E.1 Be in Mode 3

Completion TIme: 6 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

LCO 3.1.8: PS CEA groups shall be limited to the insertion limits in the COLR

Applicable: Modes _________

Actions:

A: PS CEA groups inserted beyond transient insertion limit

A.1 Restore PS CEA groups to wihtin the limit

Completion Time:________

OR

A.2: Reduce power to = the fraction of power specified in the COLR

Completion Time: _________

B: PS CEA groups inserted between long term steady state and transient insertion limits for >/=7 EFPD per 30 EFPD or >/= 14 EFPD per 365 EFPD

B.1 Restore PS CEA groups to within long term steady state limit

Completion Time:______

C: Actions not met:

C.1 Be in Modes 3

Completion Time:________

A

LCO 3.1.8: PS CEA groups shall be limited to the insertion limits in the COLR

Applicable: Modes: 1 and 2

Actions:

A: PS CEA groups inserted beyond transient insertion limit

A.1 Restore PS CEA groups to wihtin the limit

Completion Time: 2 Hoursa

OR

A.2: Reduce power to = the fraction of power specified in the COLR

Completion Time: 2 Hours

B: PS CEA groups inserted between long term steady state and transient insertion limits for >/=7 EFPD per 30 EFPD or >/= 14 EFPD per 365 EFPD

B.1 Restore PS CEA groups to within long term steady state limit

Completion Time: 2 Hours

C: Actions not met:

C.1 Be in Modes 3

Completion Time: 6 Hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

During Physics Test, requirements of SDM, SD CEA Insertion Limits, and RG CEA insertion limits may be suspended for measurement of CEA worth, provided shutdown reactivity equivalent to at least the highest estimated CEA worth is available for trip insertion or the reactor is subcritical by at least the reactivity equivalent of the highest worth CEA

Applicable: Modes 2 and 3 during physics tests

Note: Operation in Mode 3 is limited to 6 consecutive hours

A: Any full strength CEA not fully inserted and less than the required shutdown reactivity available for trip insertion

OR

All full strength CEAs inserted and the reactor subcritical by less that the above required shutdown reactivity equivalent

A.1 Initiate boration to restore shutdown reactivity

Completion TIme:___________

A

Completion Time: 15 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During Physics tests, the requirements of:

  • MTC
  • CEA alignment
  • SD CEA Insertion Limits
  • RG CEA insertion limits
  • PS CEA insertion limits
  • ‘Planar Radial peaking factoprs
  • Az Tilt
  • ASI
  • CEACS

May be suspended provided thermal power is restricted to the test plateau, which shal;l not exceed 85% and

shiutdown reactivity equivalent to at least the highest estimated CEA worth is available for trip insertion

Applicable in Modes 1 and 2 during physics testing

Actions:

A: Test power pleateau exceeded

A.1 Reduce power to = the test plateau

Completion Time:_________

B: Action not met:

B.1 Suspend physics testing

Completion Time: __________

A

A.1 Completion Time: 15 minutes

B.1 COmpletion Time: 1 Hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

During physics tests the requirements of

  • RG CEA insertion limits
  • PS CEA insertion limits
  • RCS Pressure, Temp[erature, and Flow limits

may be suspended provided LHR and DNBR do not exceed COLR limits

Applicable in Mode 1 with power >20% during physics tests

Actions:

A: LHR or DNBR outside the limits specified in the COLR

A.1 Reduce thermal power to restore LHR or DNBR

Completion TIme: ________

B: Action not met

B.1 Suspend Physics tests

Completion TIme:___________

A

A.1 Comletion Time: 15 minutes

B.1 Completion Time: 1 Hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly